南水北调西线工程的TBM选型探讨
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
结合南水北调西线工程的地质条件及环境和气候特点,从隧洞衬砌型式、施工总工期、开挖直径、通风、出碴、洞内材料运输、设备投资、开挖单价、刀具费用以及同一台TBM实现开挖直径可变性等方面对TBM的选型进行探讨,以供南水北调西线工程施工方法和TBM选型决策时参考。
Considering the environmental,climatic and geological conditions of the West Route of the South-to-North Water Transfer Project,the type selection of the TBM for the construction of the project is discussed herein in the aspects such as the tunnel lining method,total construction period,tunneling diameter,ventilation,mucking,material transport in the tunnel,equipment investment,unit price of excavation,cutter consumption,as well as realizing the variation of the tunneling diameter only with one TBM,etc.,so as to provide a reference for the decision-making on both the construction method and the TBM type selection.
引文
[1]王学潮,马国彦.南水北调西线工程及其主要工程地质问题[J].工程地质学报,2002,(1).
    [2]水利部黄河水利委员会.南水北调西线工程规划简介[J].中国水利,2003,(1B).
    [3]李国英.对南水北调西线工程的认识与评价[J].人民黄河,2001,(10).
    [4]李庆中,曹廷立,张继勇.南水北调西线工程长隧洞施工方法研究[J].水力水电科技进展,2001,21(4).
    [5]谈英武.南水北调西线工程关键技术问题的分析[J].人民黄河,2002,24(7).
    [6]彭华,马秀敏.南水北调西线工程区地震危险性分析及预测[J].地质力学学报,2007,(1).
    [7]张晓伟,黄柏洪,王怀斌,等.输水长隧洞TBM的类型选择[J].水利水电技术,2006,37(3).