引文
[1]长江水利委员会.金沙江干流规划报告[R].武汉:长江水利委员会,2006.(Changjiang Water Resources Commission.Planning report of main stream of Jinsha River[R].Wuhan:Changjiang Water Resources Commission,2006.(in Chinese))
[2]长江水利委员会长江勘测规划设计研究院.金沙江奔子栏-阿海河段开发方案优化研究报告[R].武汉:长江水利委员会长江勘测规划设计研究院,2008.(Changjiang Institute of Survey Planning Design and Research of Changjiang Water Resources Commission.Optimization of the report of the development of Benzilan to Ahai River of Jinsha[R].Wuhan:Changjiang Institute of Survey Planning Design and Research of Changjiang Water Resources Commission,2008.(in Chinese))
[3]中国地震灾害防御中心.金沙江中游塔城(上江)水电站工程场地地震安全性评价报告[R].北京:中国地震灾害防御中心,2008.(China Earthquake Disaster Prevention Center.Seismic safety evaluation report of Tacheng Hydropower project site in middle reaches of Jinsha River(Shangjiang River)[R].Beijing:China earthquake disaster,2008.(in Chinese))
[4]陈厚群,徐泽平,李敏.汶川大地震和大坝抗震安全[J].水利学报,2008,39(10):1158–1167.(CHEN Hou-qun,XU Ze-ping,LI Min.Wenchuan earthquake and seismic safety of large dams[J].Journal of Hydraulic Engineering,2008,39(10):1158–1167.(in Chinese))
[5]谭儒蛟,胡瑞林,徐文杰,等.金沙江龙蟠断陷盆地与河床深厚覆盖层的成因初判[J].工程地质学报,2008,16(1):1–5.(TAN Ru-Jiao,HU Rui-lin,XU Wen-jie,et al.Apreliminary study on the formation of Longpan ramp valley and riverbed deposits in Jinsha River[J].Journal of Engineering Geology,2008,16(1):1–5.(in Chinese))
[6]赵希涛,张永双,胡道功,等.云南丽江地区大具盆地早更新世金沙江砾石层的发现及其意义[J].地质通报,2006,25(12):1381–1386.(ZHAO Xi-tao,ZHANG Yong-shuang,HU Dao-gong,et al.Discovery of early Pleistocene gravels of the Jinsha River in the Daju basin,Yunnan,China and its significance[J].Geological Bulletin of China,2006,25(12):1381–1386.(in Chinese))
[7]赵希涛,张永双,曲永新,等.玉龙山西麓更新世冰川作用及其金沙江河谷发育的关系[J].第四纪研究,2007,27(1):35–44.(ZHAO Xi-tao,ZHANG Yong-shuang,QU Yong-xin,et al.Pleistocene glaciations along the western foot of the Yulong Mountains and their relationship with the formation and development of the Jinsha River[J].Quaternary Science,2007,27(1):35–44.(in Chinese))
[8]杜明祝.冶勒水电站深厚覆盖层坝基的勘察研究[J].四川水力发电,1999,18(3):15–17.(DU Min-zhu.Investigation of deep overburden foundation of Yele Hydroporder Plant[J].Sichuan Water Power,1999,18(3):15–17.(in Chinese))
[9]杨聚利,刘荣德,濮声荣.新疆下坂地水库坝址主要地质问题及坝址选择[J].资源环境与工程,2008,22(增):28–32,54.(YANG Ju-li,LIU Rong-de,PU Sheng-rong.Main problems of geological and site selection for Xinjiang Xiabandi Reservoir dam site[J].Resources Environment&Engineering,2008,22(S):28–32,54.(in Chinese))
[10]蔡元奇,朱以文,唐红,等.在深厚覆盖层坝基上建堆石坝的防渗研究[J].武汉大学学报(工学版),2005,38(1):18–22.(CAI Yuan-qi,ZHU Yi-wen,TANG Hong,et al.Research on anti-seepage for rockfill dam on deep overburden[J].Engineering Journal of Wuhan University(Engineer Science),2005,38(1):18–22.(in Chinese))
[11]杨坪,杨军,许德鲜,等.基于ADINA的软土坝基沉降分析[J].工程地质学报,2008,16(4):533–538.(YANG Ping,YANG Jun,XU De-xian,et al.Finite element analysis of settlement of soft soil foundation under reservoir dam[J].Journal of Engineering Geology,2008,16(4):533–538.(in Chinese))
[12]倪才胜,韩昌瑞,白世伟,等.某水利枢纽厂房大型基坑开挖渗流研究[J].岩土力学,2008,29(7):1819–1824.(NI Cai-sheng,HAN Chang-rui,BAI Shi-wei,et al.Research on seepage of large foundation pit excavation of a hydro-junction power plant[J].Rock and Soil Mechanics,2008,29(7):1819–1824.(in Chinese))
[13]罗红明,唐辉明,章广成,等.库水位涨落对库岸滑坡稳定性的影响[J].地球科学,2008,33(5):687–692.(LUO Hong-ming,TANG Hui-ming,ZHANG Guang-cheng,et al.The influence of water level fluctuation on the bank landslide stability[J].Earth Science,2008,33(5):687–692.(in Chinese))