紧邻隧道上方的土石方开挖控制爆破技术
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
汪家山工业园区土石方开挖爆破工程紧邻襄渝铁路线汪家山和白浪一号2座隧道上方,其爆破振动效应将直接对隧道稳定产生影响。为确保隧道安全,施工前进行了现场爆破试验。同时,对试验中采取的不同参数条件下的爆破振动效应进行了测试,并依据测试结果对土石方开挖爆破振动效应进行了灰色关联和回归分析;最后,依据爆破试验与综合分析结果,为了控制孔深和最大单段药量,提出了有效的爆破技术方案,取得了良好的爆破施工效果。
The rock and soil excavation engineering of Wangjiashan Industrial Park is adjacent to the top of Wangjiashan tunnel and Bailangyihao tunnel of the Xiangyu railway,the effect of blasting vibration will affect directly on the stability of tunnel.In order to ensuring tunnel safety,the field test blastings were carried out before the construction.Blasting vibration effects of the tests under different parameters were monitored.According to the test results,the effect of blasting vibration was analyzed by grey relation and regression analysis.In the end,based on the results of test blastings and comprehensive analysis,an effective blasting technology was proposed and has achieved good results.
引文
[1]周传波,陈建平.乌龙泉露天矿深孔爆破振动测试与分析[J].工程爆破,2000,6(4):71-75.
    [2]范孝锋,周传波.爆破振动影响因素的灰关联分析[J].爆破,2005,22(2):100-102.
    [3]宋龙伯,邓民宪.爆破地震效应的灰色关联分析[J].爆破,1989,6(1):25-28.
    [4]赵新涛,程贵海.灰色关联分析在爆破振动效应控制中的应用[J].爆破器材,2008,37(1):34-38.
    [5]邓聚龙.灰色系统基本方法[M].武汉:华中科技大学出版社,2005.
    [6]彭德红.某石料厂石材开采爆破振动测试与分析[J].爆破,2005,22(4):32-34.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心