潞安矿区综放开采技术的研究与实践
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
从厚煤层分层综采技术、综采放顶煤技术、大采高综采放顶煤技术3个方面介绍了潞安矿区开采技术的发展与现状。以王庄煤矿6203工作面为例,详述了潞安矿区大采高综采放顶煤技术的创新思路与工业试验研究。结果表明:工作面采出率平均达91.6%,最高达92.1%;最高月产达33186t;最高工效达502t/工。
From the three aspects of the fully mechanized slice mining technology in thick seam,the fully mechanized top coal caving mining technology and the fully mechanized high cutting and top coal caving mining technology,introduced the development and present status of the mining technology in Lu'an mining area.Taking the 6203 coal mining face in Wangzhuang Mine as the example,stated the innovation conception and the industrial research on the fully mechanized high cutting and top coal caving mining technology in Lu'an mining area.The industrial trial results show that the mining rate of the coal mining face can reach at 91.6% in average,the max mining rate can reach at 92.1%,the max month production can reach at 33 186 t and the max work efficiency is 502 t/shift.
引文
[1]段庆芳.潞安矿区高度集约化生产技术[J].煤,1999,8(1):1-5.Duan Qingfang.Highly intensive techniques of Lu’an mining area[J].Mine,1999,8(1):1-5.
    [2]尚海涛.对综采放顶煤技术的认识和思考[J].煤,1997,7(1):1-3.Shang Haitao.Discussion on fully-mechanized sublevel caving min-ing technique[J].Mine,1997,7(1):1-3.
    [3]郭金刚.超长综放工作面关键技术与实施效果[J].中国煤炭,2002,28(2):30-32.Guo Jingang.Key techniques and the applications of super-long full-y-mechanized mining panels[J].China Coal,2002,28(2):30-32.
    [4]曹胜根,张东升,杜卫新.超长综放工作面开采关键技术[J].矿山压力与顶板管理,2003(4):69-71.Cao Shenggen,Zhang Dongsheng,Du Weixin.Key techniques of su-per-long fully-mechanized mining panels[J].Ground Pressure&Roof Control,2003(4):69-71.
    [5]闫少宏,尹希文.大采高综放开采几个理论问题的研究[J].煤炭学报,2008,33(5):481-484.Yan Shaohong,Yin Xiwen.Discussing about the main theoretical problems of long wall with top coal caving[J].Journal of China CoalSociety,2008,33(5):481-484.
    [6]张日晨.神东矿区保德煤矿综放开采可行性研究[J].煤炭学报,2008,33(5):489-491.Zhang Richen.Feasibility study of long wall with top coal caving in Baode Coal Mine in Shendong mining area[J].Journal of China Coal Society,2008,33(5):489-491.
    [7]杨科,谢广祥.采动裂隙分布及其演化特征的采厚效应[J].煤炭学报,2008,33(10):1092-1096.Yang Ke,Xie Guangxiang.Caving thickness effects on distribution and evolution characteristics of mining induced fracture[J].Journal of China Coal Society,2008,33(10):1092-1096.
    [8]闫少宏.特厚煤层大采高综放开采支架外载的理论研究[J].煤炭学报,2009,34(5):590-593.Yan Shaohong.Theory study on the load on support of long wall with top coal caving with great mining height in extra thick coal seam[J].Journal of China Coal Society,2009,34(5):590-593.
    [9]张子飞,来兴平.复杂条件下急斜厚煤层高阶段综放开采超前预爆破[J].煤炭学报,2008,33(8):845-849.Zhang Zifei,Lai Xingping.Segment pre-blasting of sublevel caving of steep and thick coal seam under complex conditions[J].Journal of China Coal Society,2008,33(8):845-849.
    [10]卢喜山,赵学雷,徐向东,等.准大采高综放设备配套技术研究[J].煤,2006,15(6):6-7.Lu Xishan,Zhao Xuelei,Xu Xiangdong,et al.Kit technique re-search about fully-mechanized coal winning equipment[J].Mine,2006,15(6):6-7.
    [11]孔令海,姜福兴,刘杰,等.特厚煤层综放工作面区段煤柱合理宽度的微地震监测[J].煤炭学报,2009,34(7):871-874.Kong Linghai,Jiang Fuxing,Liu Jie,et al.High-precision microseis-mic monitoring system to reasonable width of segment coal pillar in extra-thick coal seam fully mechanized top-coal caving mining[J].Journal of China Coal Society,2009,34(7):871-874.
    [12]付玉平,宋选民,邢平伟,等.大采高采场顶板断裂关键块稳定性分析[J].煤炭学报,2009,34(8):1027-1031.Fu Yuping,Song Xuanmin,Xing Pingwei,et al.Stability analysis on main roof key block in large mining height workface[J].Journal of China Coal Society,2009,34(8):1027-1031.
    [13]王永秀,毛德兵,齐庆新.数值模拟中煤岩层物理力学参数确定的研究[J].煤炭学报,2003,28(6):593-597.Wang Yongxiu,Mao Debing,Qi Qingxin.Study on determining of the mechanical parameters of rock mass used in numerical simula-tion[J].Journal of China Coal Society,2003,28(6):593-597.
    [14]宁宇.大采高综采煤壁片帮冒顶机理与控制技术[J].煤炭学报,2009,34(1):50-52.Ning Yu.Mechanism and control technique of the rib spalling in fully mechanized mining face with great mining height[J].Journal of China Coal Society,2009,34(1):50-52.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心