引文
[1]毛德兵,康立军.大采高综放开采及其应用可行性分析[J].煤矿开采,2003,8(3):11-14.Mao Debing,Kang Lijun.Longwall top coal caving mining with high-er mining height and its feasibility[J].Coal Mining Technology,2003,8(3):11-14.
[2]毛德兵.大采高综放开采及其在高瓦斯厚煤层中应用前景[A].采矿工程新论[C].北京:煤炭工业出版社,2005:84-89.
[3]闫少宏.特厚煤层大采高综放开采支架外载的理论研究[J].煤炭学报,2009,34(5):590-593.Yan Shaohong.Theory study on the load on support of long wall with top coal caving with great mining height in extra thick coal seam[J].Journal of China Coal Society,2009,34(5):590-593.
[4]张子飞,来兴平.复杂条件下急斜厚煤层高阶段综放开采超前预爆破[J].煤炭学报,2008,33(8):845-849.Zhang Zifei,Lai Xingping.Segment pre-blasting of sublevel caving of steep and thick coal seam under complex conditions[J].Journal of China Coal Society,2008,33(8):845-849.
[5]孔令海,姜福兴,刘杰,等.特厚煤层综放工作面区段煤柱合理宽度的微地震监测[J].煤炭学报,2009,34(7):871-874.Kong Linghai,Jiang Fuxing,Liu Jie,et al.High-precision microseis-mic monitoring system to reasonable width of segment coal pillar in extra-thick coal seam fully mechanized top-coal caving mining[J].Journal of China Coal Society,2009,34(7):871-874.
[6]付玉平,宋选民,邢平伟,等.大采高采场顶板断裂关键块稳定性分析[J].煤炭学报,2009,34(8):1027-1031.Fu Yuping,Song Xuanmin,Xing Pingwei,et al.Stability analysis on main roof key block in large mining height workface[J].Journal of China Coal Society,2009,34(8):1027-1031.
[7]闫少宏,尹希文.大采高综放开采几个理论问题的研究[J].煤炭学报,2008,33(5):481-484.Yan Shaohong,Yin Xiwen.Discussing about the main theoretical problems of long wall with top coal caving[J].Journal of China Coal Society,2008,33(5):481-484.
[8]刘全明,毛德兵,王永秀,等.中硬特厚煤层综放工作面合理参数确定研究[J].煤矿开采,2006,11(6):14-16.Liu Quanming,Mao Debing,Wang Yongxiu,et al.Reasonable pa-rameters confirmation of full-mechanized caving mining face in medi-um-hard and extremely thick coal seam[J].Coal Mining Technolo-gy,2006,11(6):14-16.
[9]王永秀,毛德兵,齐庆新.数值模拟中煤岩层物理力学参数确定的研究[J].煤炭学报,2003,28(6):593-597.Wang Yongxiu,Mao Debing,Qi Qingxin.Study on determining of the mechanical parameters of rock mass used in numerical simulation[J].Journal of China Coal Society,2003,28(6):593-597.
[10]宁宇.大采高综采煤壁片帮冒顶机理与控制技术[J].煤炭学报,2009,34(1):50-52.Ning Yu.Mechanism and control technique of the rib spalling in fully mechanized mining face with great mining height[J].Journal of China Coal Society,2009,34(1):50-52.
[11]杨科,谢广祥.采动裂隙分布及其演化特征的采厚效应[J].煤炭学报,2008,33(10):1092-1096.Yang Ke,Xie Guangxiang.Caving thickness effects on distribution and evolution characteristics of mining induced fracture[J].Journal of China Coal Society,2008,33(10):1092-1096.
[12]张日晨.神东矿区保德煤矿综放开采可行性研究[J].煤炭学报,2008,33(5):489-491.Zhang Richen.Feasibility study of long wall with top coal caving in Baode Coal Mine in Shendong mining area[J].Journal of China Coal Society,2008,33(5):489-491.
[13]毛德兵.综放支架支护强度与煤层采出厚度关系的研究[J].煤炭科学技术,2009,37(1):45-48.Mao Debing.Study on relative relationship between support strength of hydraulic powered caving support and thickness mined in seam[J].Coal Science and Technology,2009,37(1):45-48.
[14]毛德兵.综放开采割煤高度与顶煤采出率相互关系研究[J].煤矿开采,2009,14(4):13-15.Mao Debing.Research on relationship of mining height and recovery of top-coal in full-mechanized caving mining[J].Coal Mining Technology,2009,14(4):13-15.
[15]史元伟,宁宇,齐庆新.综采放顶煤工作面岩层控制与工艺参数优选[M].徐州:中国矿业大学出版社,2006:15-16.