滨海核电厂厂坪标高优化
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
确定滨海核电厂厂坪标高主要考虑的因素有厂址设计基准洪水位、循环水泵运行费用和场地土石方挖填平衡。在满足厂址设计基准洪水位要求的情况下,厂坪标高的确定与常规岛侧主厂房布置方案密切相关。对常规岛侧主厂房局部下沉、整体下沉等4种不同布置方案进行了技术经济性分析,得到了最优的厂坪标高。
The main factors to be considered in determining the floor elevation of coastal nuclear power plant include the site design datum flood level,the operation cost of circulating pumps and the balance of earth-rock.When the requirement of site design datum flood level is satisfied,determination of the floor elevation is closely related to the layout of the main power plant on the conventional island side.In this paper,through a case study of a coastal nuclear power plant under construction,a technical and economic comparison is carried out on the 4 different layout schemes of main power plant on the conventional island side and the optimal plant floor elevation is obtained.
引文
[1]祁恩兰.我国核电的建设形势及思考[J].电力建设,2009,30(5):1-4.
    [2]李波.滨海火电厂1 000 MW机组循环水泵选型方案的探讨[J].机电工程技术,2007,36(11):56-57.
    [3]赵克沙.椰岛@海核元年记事[J].中国核工业,2010(1):48-54.
    [4]张捷.浅谈核电厂常规岛主厂房结构设计[J].广东建材,2009(12):74-76.
    [5]左永平,林天泉,郑益,等.大型锻件采用水溶性淬火介质淬火的工艺控制[J].大型铸锻件,2010(1):20-24.
    [6]赵军,尹雪梅.提高核电厂建造质量保证监查有效性的探讨[J].标准科学,2010(1):56-59.
    [7]李志国,潘华,李金臣,等.累积绝对速度在核电厂地震危险性分析中的应用研究[J].地震学报,2010(1):69-76,136.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心