格拉管道环境变化与管道工程问题的防治措施
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
总结了自运营以来格拉管道沿线的寒区环境变化及出现的管道工程问题。寒区环境变化主要有冻土退化、植被破坏、沙漠化加剧、冻害现象增多以及泄漏油品对沿线环境的污染等。管道工程问题主要包括冻胀与融沉、地震、冰堵及防腐层的损伤等对管道的破坏;并就各种工程问题给出了相关措施和建议。
Variation of environment along the route of Golmud-Lhasa Oil Product Pipeline are introduced,including enhancement of frost hazards caused by permafrost degradation,vegetation removal or damage,acceleration of land desertification and environmental pollution from accidental oil leaks.Problems involved in pipeline damage such as frost heaving and thaw settlement of the soils in pipeline foundation.earthquake,ice blocking and damage of anti-corrosion coatings are put forward and mitigation measures for engineering and environmental problems of Golmud-Lhasa Oil Product Pipeline are proposed.
引文
1,蒲家宁:军用输油管线,解放军出版社(北京),2003。
    2,曾多礼:格拉输油管道地质灾害类型与技术措施,管道技术与设备,2004(6)。
    3,林振耀赵昕奕:青藏高原气温降水变化的空间特征,中国科学(D辑),1996,26(4)。
    4,牛涛刘洪利等:青藏高原气候甴暖干到暖湿时期的年代际变化特征研究,应用气象学报,2005,16(6)。
    5,吴绍洪尹云鹤等:青藏高原近30年气候变化趋势,地理学报,2005,60(1)。
    6,汪双杰周文锦:青藏公路沿线环境演化及环境保护对策,公路,2005(1)。
    7,孔亚平陈济丁等:青藏公路多年冻土路段沿线植被及其变化,公路,2008(3)。
    8,王绍令赵秀锋等:青藏高原冻土对气候变化的响应,冰川冻土(增刊),1996(18)。
    9,吴青柏刘永智等:青藏公路多年冻土区冻土工程研究新进展,工程地质学报,2002,10(1)。
    10,王绍令:青藏公路沿线多年冻土区环境调查,青海环境,1992,2(2)。
    11,吴青柏刘永智等:寒区冻土环境与工程环境间的相互作用,工程地质学报,2000,8(3)。
    12,曹云者施烈焰等:石油烃污染场地环境风险评价与管理,生态毒理学报,2007,2(3)。
    13,金会军喻文兵等:多年冻土区输油管道工程中的(差异性)融沉和冻胀问题,冰川冻土,2005,27(3)。
    14,金会军李述训等:气候变化对中国多年冻土和寒区环境的影响,地理学报,2000,55(2)。
    15,赵忠刚姚安林等:长输管道地质灾害的类型、防控措施和预测方法,石油工程建设,2006,32(1)。
    16,Jin HJ,Wei Z et al:Assessment of frozen ground conditions for engineering geology along the Qinghai-Tibet Highway and Rail way,China,Engineering Geology,2008(97).
    17,姚志祥:格拉管道一次地震断裂分析及防范措施,施工与焊接,2003(6)。
    18,姚志祥:格拉管线的冰堵排除实践及预防措施,管道技术与设备,2003(1)。
    19,张庆杰陈宝忠等:输油管道冰堵监测与定位技术的研究,管道技术与设备,2005(6)。
    20,曾多礼:影响长输管道在役寿命原因分析与对策,管道技术与设备,2004(5)。
    21,胡士信董旭:我国管道防腐层技术现状,油气储运,2004,23(7)。

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心