引文
[1]吕淑然.露天台阶爆破地震效应及控制研究[D].北京:北京理工大学,2004.LV Shu-ran.Study on strip mine bench blasting seismic effect and itscontrolling[D].Beijing:Beijing Institute of Technology,2004.(inChinese)
[2]黄树棠,张雪亮.爆破地震效应[M].北京:地震出版社,1981:116-119.HUANG Shu-tang,ZHANG Xue-liang.Blasting vibration effect[M].Beijing:Earthquake Press,1981:116-119.(in Chinese)
[3]霍永基,王湘均,费骥鸣.爆破地震效应及安全评定方法探讨[C].土岩爆破文集,北京:冶金工业出版社,1985:184-187.HUO Yong-ji,WANG Xiang-jun,FEI Ji-ming.Blasting vibrationeffect and safety assessment method[C].Soil and Rock Blasting Col-lected Works,Beijing:Metallurgical Industry Press,1985:184-187.(in Chinese)
[4]阳生权,廖先葵,刘宝琛.爆破地震安全判据的缺陷与改进[J].爆炸与冲击,2001,21(7):223-228.YANG Sheng-quan,LIAO Xian-kui,LIU Bao-chen.Default of thejudging standard of blasting vibration safety abstract[J].Explosionand Shock Waves,2001,21(7):223-228.(in Chinese)
[5]阳生权,刘宝琛.控制爆破中配电站等安全问题的处理[J].工程爆破,2000,6(3):89-92.YANG Sheng-quan,LIU Bao-chen.Treatment of safety problemsabout distribution station in controlled blasting[J].Engineering Blas-ting,2000,6(3):89-92.(in Chinese)
[6]李仲奎,王爱民,李达成.某地下厂房施工过程中突发性破坏的分析及对策[J].岩土工程学报,1997,19(5):44-48.LI Zhong-kui,WANG Ai-min,LI Da-cheng.Analysis for a triggeredcollapse in construction of a underground powerhouse[J].ChineseJournal of Geotechnical Engineering,1997,19(5):44-48.(in Chi-nese)
[7]钱胜国,陈玲玲,吴新霞,等.爆破地震工程结构动力分析[M].北京:中国水利水电出版社,2006.QIAN Sheng-guo,CHEN Ling-ling,WU Xin-xia,et al.Structuraldynamic analysis of blasting earthquake engineering[M].Beijing:China Water Power Press,2006.(in Chinese)
[8]石崇,周家文,任强,等.单面边坡高程放大效应的射线理论解[J].河海大学学报,2008,36(3):238-241.SHI Chong,ZHOUJia-wen,REN Qiang,et al.Ray theory solutionof elevation amplification effect on a single-free-face slope[J].Jour-nal of Hohai University,2008,36(3):238-241.(in Chinese)
[9]杨文东,孙秀民.台阶深孔爆破振动控制[J].武汉大学学报工学版,2008,41(6):52-59.YANG Wen-dong,SUN Xiu-min.Borehole blasting vibration controlof creep mass high slope[J].Engineering Journal of Wuhan Universi-ty,2008,41(6):52-59.(in Chinese)
[10]许海亮,张继春,杨红,等.钻孔爆破振动速度计算公式及其简化的探讨[J].同济大学学报,2007,35(7):900-904.XUHai-liang,ZHANG Ji-chun,YANG Hong,et al.Investigationon calculation formula of vibration velocity in drilling blasting and itssimplification[J].Journal of Tongji University,2007,35(7):900-904.(in Chinese)
[11]唐海,李海波,周青春,等.凹形地貌对爆破振动波的传播影响的数值模拟[J].岩土力学,2008,29(6):1540-1544.TANG Hai,LI Hai-bo,ZHOUQing-chun,et al.Numerical simula-tion of influence of concave landform on blasting vibration wave prop-agation[J].Rock and Soil Mechanics,2008,29(6):1540-1544.(in Chinese)
[12]顾毅成.对毫秒延时爆破地震公式的讨论[J].铁道建筑,2005,(S1):73-75.GU Yi-cheng.The discussion of millisecond delay blasting earth-quake formula[J].Railway Engineering,2005,(S1):73-75.(inChinese)