摘要
介绍了在复杂环境中,采用控制爆破技术爆破拆除180 m钢筋混凝土烟囱的工程实例,论述了工程方案的确定,参数设计及主要安全措施。针对烟囱尺寸大、钢筋密、混凝土强度高的结构特点,预先开凿大尺寸导向窗减少了爆破面积。特别针对烟囱高度特别高,自重大的特点,针对性进行防护土堤的设计。通过多角度观察,确认防护土堤有效地控制了爆破次生灾害的产生。
Construction environment、Chimney structure、Blasting scheme、Parameter design、Safety and protection measures and Blasting effect of 180 m chimneys' directional blasting will be introduced.Especially,The protective earth dam was design for its height and weight.The facts show that the protective earth dam can control the disasters availably.
引文
[1]中华人民共和国标准.GB6722—2003爆破安全规程[S].北京:中国标准出版社,2004.[1]The Standard of the People's Republic of China.GB6722—2003 Safety specifications of blasting operation[S].Beijing:Standards Press of China,2004.(in Chinese)
    [2]王玉杰.爆破工程[M].武汉:武汉理工大学出版社,2007.[2]WANG Yu-jie.Blasting engineering[M].Wuhan:Wuhan University of Technology Press,2007.(in Chinese)
    [3]于亚伦.工程爆破理论与技术[M].北京:冶金工业出版社,2004.[3]YU Ya-lun.Engineering blasting theory and technology[M].Beijing:Metallurgical Industry Press,2004.(inChinese)
    [4]张继春,曾庆福,严军,等.成都华能电厂210 m钢筋砼烟囱控制爆破拆除[J].爆破,2009,26(2):41-45.[4]ZHANG Ji-chun,ZENG Qing-fu,YAN Jun,et al.Demoli-tion of 210 m reinforced concrete chimney of ChengduHuaneng plant by controlled basting[J].Blasting,2009,26(2):41-45.(in Chinese)
    [5]齐世福,王福刚,薛峰松,等.180 m高钢筋混凝土烟囱爆破拆除[J].爆破器材,2010,39(1):26-28.[5]QI Shi-fu,WANG Fu-gang,XUN Feng-song et al.Demoli-tion of a 180 m-superheight reinforced concrete chimneyby directional blasting[J].Explosive Materials,2010,39(1):26-28.(in Chinese)
    [6]靳洋,任志远.150 m钢筋砼烟囱定向爆破拆除[J].爆破,2009,26(1):69-71.[6]JIN Yang,REN Zhi-yuan.Directional blasting demolitionof 150 m high reinforced concrete smoke stack[J].Blas-ting,2009,26(1):69-71.(in Chinese)
    [7]马红卫,郑健礼,刘鹏虎.125 m高钢筋砼排气塔定向爆破拆除[J].爆破,2010,27(4):85-87.[7]MA Hong-wei,ZHENG Jian-li,LIU Peng-hu.Directionalexplosive demolition of 125 m reinforced concrete exhausttower[J].Blasting,2010,27(4):85-87.(in Chinese)
    [8]张修玉,张义平,池恩安,等.烟囱绕爆破切口直径转动惯量的解法[J].爆破,2010,27(4):81-84.[8]ZHANG Xiu-yu,ZHANG Yi-ping,CHI En-an,et al.Cal-culation methods of rotational inertia of chimney aroundblasting cut diameter[J].Blasting,2010,27(4):81-84.(in Chinese)
    [9]夏军,周明安,丁育青.烟囱爆破切口角度高度数值模拟研究[J].爆破,2009,26(4):70-73.[9]XIA Jun,ZHOU Ming-an,DING Yu-qing.Numerical sim-ulation of precutting's angle and height of chimney blas-ting[J].Blasting,2009,26(4):70-73.(in Chinese)
    [10]魏晓林,魏挺峰.爆破拆除高耸建筑下坐动力方程[J].合肥工业大学学报(自然科学版),2009,32(10):1457-1461.[10]WEI Xiao-lin,WEI Ting-feng.Dynamic equations for sit-ting down of high buildings demolished by blasting[J].Journal of Hefei University of Technology(Natural Sci-ence),2009,32(10):1457-1461.(in Chinese)
    [11]叶洲元,马建军.爆破拆除高耸建筑物触地危害分析与控制[J].中国安全科学学报,2010,20(2):150-154.[11]YE Zhou-yuan,MA Jian-jun.Harm analysis of collapseand touchdown of tower buildings in demolition blastingand its control measures[J].China Safety Science Jour-nal,2010,20(2):150-154.(in Chinese)
    [12]胡锐.框架结构定向拆除爆破模拟及触地震动研究[D].武汉:武汉理工大学,2008.[12]HU Rui.Directional demolition blasting frame structuresimulation and touch the ground vibration research[D].Wuhan:Wuhan University of Technology.(in Chinese)
    [13]钟冬望,陈江伟,余刚.边坡爆破振动传播规律的试验研究[J].武汉科技大学学报,2010,33(3):332-336.[13]ZHONG Dong-wang,CHEN Jiang-wei,YU Gang.Experi-mental study of propagation of slope blasting vibration[J].Journal of Wuhan University of Science and Tech-nology,2010,33(3):332-336.(in Chinese)
    [14]郭涛,高振儒,范磊,等.不同位置条件下减震沟减震效应的数值模拟[J].爆破器材,2010,39(2):7-9.[14]GUO Tao,GAO Zhen-ru,FAN Lei,et al.Numerical sim-ulation of damping effect of damping ditch with differentlocation[J].Explosive Materials,2010,39(2):7-9.(inChinese)
    [15]王斌,梁开水.拆除爆破中缓冲层的受力变形与防护作用[J].采矿技术,2007,7(3):149-152.[15]WANG Bin,LIANG Kai-shui.Demoliton blasting of thebuffer layer deformation and protective effect[J].MiningTechnology,2007,7(3):149-152.(in Chinese)