引文
[1]毛德兵,康立军.大采高综放开采及其应用可行性分析[J].煤矿开采,2003(3):11-14.Mao Debing,Kang Lijun.Long wall top coal caving mining withhigher mining height and its feasibility[J].Coal Mining Technology,2003(3):11-14.
[2]闫少宏,尹希文.大采高综放开采几个理论问题的研究[J].煤炭学报,2008,33(5):481-484.Yan Shaohong,Yin Xiwen.Discussing about the main theoreticalproblems of long wall with top coal caving[J].Journal of China CoalSociety,2008,33(5):481-484.
[3]闫少宏.大采高综放开采煤壁片帮冒顶机理与控制途径研究[J].煤矿开采,2008,13(4):5-8.Yan Shaohong.Research on side and roof falling mechanism andcontrol approaches in caving mining with large mining height[J].Coal Mining Technology,2008,13(4):5-8.
[4]王存文,姜福兴,王平,等.煤柱诱发冲击地压的微震事件分布特征与力学机理[J].煤炭学报,2009,34(9):1 769-1 173.Wang Cunwen,Jiang Fuxing,Wang Ping,et al.Micro seismic eventsdistribution characteristics and mechanical mechanisms of rockbursting induced by a coal pillar[J].Journal of China Coal Society,2009,34(9):1 769-1 173.
[5]刘杰.特厚煤层综放工作面围岩运动的微地震监测[J].矿业安全与环保,2008,35(1):44-46.Liu Jie.Movement of roof strata in extra-thick coal seams in top-coalcaving mining based on a high precision micro-seismic monitoringsystem[J].Mining Safety&Environmental Protection,2008,35(1):44-46.
[6]吕进国,潘立.微震预警冲击地压的时间序列方法[J].煤炭学报,2010,35(12):2 002-2 005.LüJinguo,Pan Li.Micro seismic predicting coal bump by time seriesmethod[J].Journal of China Coal Society,2010,35(12):2 002-2 005.
[7]夏永学,潘俊锋,王元杰,等.基于高精度微震监测的煤岩破裂与应力分布特征研究[J].煤炭学报,2010,36(2):239-243.Xia Yongxue,Pan Junfeng,Wang Yuanjie,et al.Study of rule of sur-rounding rock failure and stress distribution based on high-precisionmicro-seismic monitoring[J].Journal of China Coal Society,2011,36(2):239-243.
[8]曹安业.采动煤岩冲击破裂的震动效应及其应用研究[J].煤炭学报,2011,36(1):177-178.Cao Anye.Research on seismic effort of burst and failure of coal rockmass associated with mining and its application[J].Journal of ChinaCoal Society,2011,36(1):177-178.
[9]夏永学,康立军,齐庆新,等.基于微震监测的5个指标及其在冲击地压预测中的应用[J].煤炭学报,2010,35(12):2 011-2 015.Xia Yongxue,Kang Lijun,Qi Qingxin,et al.Five indexes of micro-seismic and their application in rock burst forecastion[J].Journal ofChina Coal Society,2010,35(12):2 011-2 015.
[10]巩思园,窦林名,马小平,等.提高煤矿微震定位精度的最优通道个数的选取[J].煤炭学报,2010,35(12):2 017-2 021.Gong Siyuan,Dou Linming,Ma Xiaoping,et al.The method to iden-tify the optimal channel numbers for increasing the location accura-cy of micro seismic events in coalmine[J].Journal of China CoalSociety,2010,35(12):2 017-2 021.
[11]任勇,夏永学,张修峰.基于地音活动规律的冲击危险性评价技术[J].煤矿开采,2010,15(6):90-92.Ren Yong,Xia Yongxue,Zhang Xiufeng.Evaluation technology ofrock-burst danger based on earth acoustic data[J].Coal MiningTechnology,2010,15(6):90-92.
[12]李志华,窦林名,管向清,等.矿震前兆分区监测方法及应用[J].煤炭学报,2009,34(5):614-618.Li Zhihua,Dou Linming,Guan Xiangqing,et al.A zoning monito-ring method of micro seismic premonition and its application[J].Journal of China Coal Society,2009,34(5):614-618.
[13]李庶林,尹贤刚,郑文达,等.凡口铅锌矿多通道微震监测系统及其应用研究[J].岩石力学与工程学报,2005,24(12):2 048-2 053.Li Shulin,Yin Xiangang,Zheng Wenda,et al.Research on multi-channel micro-seismic monitoring system and its application to fa-mous lead-zinc mine[J].Chinese Journal of Rock Mechanic andEngineering,2005,24(12):2 048-2 053.
[14]孔令海,姜福兴,杨淑华,等.基于高精度微震监测的特厚煤层综放工作面顶板运动规律[J].北京科技大学学报,2010,32(5):552-558.Kong Linghai,Jiang Fuxing,Yang Shuhua,et al.Movement of roofstrata in extra-thick coal seams in caving mining based on high pre-cision micro-seismic monitoring system[J].Journal of University ofScience and Technology Beijing,2010,32(5):552-558.
[15]闫少宏.特厚煤层大采高综放开采支架外载的理论研究[J].煤炭学报,2009,34(5):590-593.Yan Shaohong.Theory study on the load on support of long wallwith top coal caving with great mining height in extra thick coalseam[J].Journal of China Coal Society,2009,34(5):590-593.