榆林某煤矿采空区地表移动变形预测及其工程分区
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
根据已有类似条件下的地表沉降监测资料,采用工程类比、典型曲线法、概率积分法及有限差分数值分析等多种手段和方法,对榆林某煤矿未来采空区地表移动变形规律进行预测。划定采动影响区为开采边界以外316 m,最大下沉值为5 760 mm。结合建(构)筑物所能承受的允许变形值,将采动影响区根据工程需要划分为严重影响区、一般影响区和轻微影响区。为差别化利用土地资源、降低工程建设投资风险、充分利用煤炭资源提供科学依据。
Based on the monitoring data of ground subsidence under the similar circumstance,the future ground movement and deformation at a coal mining area inYulin is predicted by using engineering analogue method,curve analysis method,probability integration method and finite difference numerical analysis method.The mining-affected areas are designated as 316 m outside the mining boundary,and the maximum ground subsidence is 5 760 mm.Combined with the deformation limits of the constructions,the mining-affected areas are divided into severe impacted section,relatively impacted section and slightly affected section according to project needs.It provides a scientific basis for differentially using the land resources,reducing the risks of investment in construction,and fully using the national coal and land resources.
引文
[1]姜岩,田茂义.矿山开采地表下沉与变形预计新方法[J].矿山压力与顶板管理,2003(3):74–77.
    [2]王建学.开采沉陷塑性损伤结构理论与冒矸空隙注浆充填技术的研究[D].北京:煤炭科学研究总院,2001.
    [3]傅文学.矿井开采沉陷影响土地利用系统的GIS分析方法[D].合肥:合肥工业大学,2004.
    [4]纪万斌.塌陷灾害与防治丛书——塌陷与灾害[M].北京:地震出版社,1998.
    [5]刘文涛.采场覆岩移动流变模型及开采沉陷预计研究[D].太原:太原理工大学,2004.
    [6]纪万斌.陷灾害与防治丛书——塌陷与建筑[M].北京:地震出版社,1998.
    [7]高谦,乔兰.地下工程系统分析与设计[M].北京:中国建材工业出版社,2005.
    [8]赵静波,高谦,李莉.地下采动岩层移动预测理论分析与研究[J].矿冶工程,2004(3):1–4.
    [9]尹士献.厚黄土覆盖层村镇下条带开采研究[D].西安:西安科技大学,2004.
    [10]徐永圻.煤矿开采学[M].徐州:中国矿业大学出版社,1999.
    [11]于广明.矿山开采沉陷非线性理论与实践导引[M].北京:煤炭工业出版社,1998.
    [12]于双忠,彭向峰,李文平,等.煤矿工程地质学[M].北京:煤炭工业出版社,1994.
    [13]黄熙龄,滕延京,王铁宏,等.GBJ50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002.
    [14]国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[S].北京:煤炭工业出版社,2000.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心