引文
[1]卢文波,赖世骧,朱传云.三峡工程岩石基础爆破震动控制安全标准[J].爆炸与冲击,2001,21(1):67-71.[1]LU Wen-bo,LAI Shi-xiang,ZHU Chuan-yun.Safety Stand-ards of Blast Vibrations Adopted in Rock Base Excavation ofThree Gorge Project[J].Explosion and Shock Waves,2001,21(1):67-71.(in Chinese)
[2]李海波,蒋会军,赵坚,等.动荷载作用下岩体工程安全的几个问题[J].岩石力学与工程学报,2003,22(11):1 887-1 891.[2]LI Hai-bo,JIANG Hui-jun,ZHAO Jian,et al.Some Prob-lems about Safety Analysis of Rock Engineering under Dy-namic Load[J].Chinese Journal of Rock Mechanics andEngineering,2003,22(11):1 887-1 891.(in Chinese)
[3]爆破安全规程(GB6722——2003)[S].北京:中国标准出版社,2004.[3]Safety Regulatoins for Blasting GB6722——2003[S].Beijing:State Standardization Publishing House,2004.(inChinese)
[4]杨桂桐.爆破振动效应及边坡动态分析[J].爆破,1989,6(4):9-14.[4]YANG Gui-tong.Blast Shock Effect and Slope DynamicState Analysis[J].Blasting,1989,6(4):9-14.(in Chi-nese)
[5]甄胜利.岩质高边坡开挖爆破动力稳定分析研究[C]∥工程爆破文集(第五辑).武汉:中国地质大学出版社,1993:110-113.[5]ZHEN Sheng-li.Dynamic Stability Analysis of Blasting andExcavation of Rock High Slope[C]∥Conference of Engi-neering Blasting(Vol.5).Wuhan:China University of Geo-sciences Press,1993:110-113.(in Chinese)
[6]张永哲.岩质高边坡开挖爆破动力稳定分析[J].工程爆破,1996,2(4):31-38.[6]ZHANG Yong-zhe.Dynamic Stability Analysis of Blastingand Excavation of Rock High Slope[J].Engineering Blas-ting,1996,2(4):31-38.(in Chinese)
[7]陈明,卢文波,舒大强,等.爆破振动作用下边坡极限平衡分析的等效加速度计算方法[J].岩石力学与工程学报,2009,28(04):784-790.[7]CHEN Ming,LU Wen-bo,SHU Da-qiang,et al.Calcula-tion Method of Equivalent Acceleration for Limit Equilib-rium Analysis of Slope Under Blasting Vibration[J].Chi-nese Journal of Rock Mechanics and Engineering,2009,28(04):784-790.(in Chinese)
[8]卢文波,赖世骧,朱传云.岩石高边坡爆破振动动力稳定分析[J].矿冶工程,1996,16(1):3-7.[8]LU Wen-bo,LAI Shi-xiang,ZHU Chuan-yun.Analysis ofthe Dynamic Stability of Rock Slopes Under Blasting Vi-bration Conditions[J].Mining and Metallurgical Engi-neering,1996,16(1):3-7.(in Chinese)
[9]阎坤,张云.岩质高边坡爆破动力稳定分析方法研究[J].水力发电,1996,(8):27-29.[9]YAN Kun,ZHANG Yun.Study on Dynamic Stability A-nalysis Method of the High Side-Slope Rock Blasting[J].Water Power,1996,(8):27-29.(in Chinese)
[10]许红涛,卢文波,周创兵,等.基于时程分析的岩质高边坡开挖爆破动力稳定性计算方法[J].岩石力学与工程学报,2006,25(11):2 213-2 219.[10]XU Hong-tao,LU Wen-bo,ZHOU Chuang-bing,et al.Time History Analysis Method for Evaluating DynamicStability of High Rock Slope Under Excavation Blasting[J].Chinese Journal of Rock Mechanics and Engineer-ing,2006,25(11):2 213-2 219.(in Chinese)
[11]刘亚群,李海波,李俊如,等.爆破荷载作用下黄麦岭磷矿岩质边坡动态响应的UDEC模拟研究[J].岩石力学与工程学报,2004,23(21):3 659-3 663.[11]LIU Ya-qun,LI Hai-bo,LI Jun-ru,et al.UDEC Silmula-tion on Dynamic Response of Rock Slope of Huangmail-ing Phosphorite Mine under Explosion[J].Chinese Jour-nal of Rock Mechanics and Engineering,2004,23(21):3 659-3 663.(in Chinese)
[12]陈明,卢文波,吴亮,等.小湾水电站岩石高边坡爆破振动速度安全阈值研究[J].岩石力学与工程学报,2007,26(1):51-56.[12]CHEN Ming,LUWen-bo,WULiang,et al.Safety Thresh-old of Blasting Vibration Velocity to High Rock Slope ofXiaowan Hydropower Station[J].Chinese Journal of RockMechanics and Engineering,2007,26(1):51-56.(in Chi-nese)
[13]SAVELY J P.Designing a Final Blast to Improve Stabili-ty[A].Preprint No.86~50,Presented at the SME An-nual Meeting,New Orleans,Louisiana,U.S.A.,1986.
[14]许海亮,张继春,任贺靖.隧道掘进爆破震动放大效应试验研究[J].地下空间与工程学报,2007,3(4):609-612.[14]XU Hai-liang,ZHANG Ji-chun,REN He-jing.Experi-mental Study on Magnifying Effects of Vibration Resul-ting from Driving Blasting in Tunnel[J].Chinese Journalof Underground Space and Engineering,2007,3(4):609-612.(in Chinese)
[15]ANSELL A.Recommendations for Shotcrete on Rock Sub-jected to Blasting Vibrations Based on Finite Element Dy-namic Analysis[J].Magazine of Concrete Research,2005,57(3):123-133.
[16]STJERN G,MYRVANG A.The Influence of Blasting onGrouted Rockbolts[J].Tunneling and UndergroundSpace Technology,1995,13(1):65-70.
[17]TANNANT D D,BRUMMER R K.Rockbolt BehaviourUnder Dynamic Loading Field Tests and Modeling[J].Int J Rock Mech Min Sci Geomech Abstr,1995,32(6):537-550.
[18]边克信.爆破地震对地下构筑物的影响[J].中国矿山工程,1981,1(6):25-36.[18]BIAN Ke-xin.Influence of Blasting Seismic on Under-ground Structure[J].China Mine Engineering,1981,1(6):25-36.(in Chinese)
[19]朱瑞赓,李铮.爆炸地震波的现场测量及其安全距离[J].爆炸与冲击,1982,2(1):60-67.[19]ZHU Rui-geng,LI Zhen.In-situ Measurement of BlastingSeismic Waves and Their Safety Distance[J].Explosionand Shock Waves,1982,2(1):60-67.(in Chinese)
[20]LANGEFORS U,KIHLSTROM B.The Modern Techniqueof Rock Blasting[M].NewYork:John Wiley&Sons Inc,1973.
[21]HOLMBERG R,PERSSON P A.The Swedish Approachto Contour Blasting[C]∥Proceedings of the 4th Confer-ence on Explosive and Blasting Technique.[S.l.]:[s.n.],1978:113-127.
[22]BAUER A,CALDER P N.Open Pit and Blast Seminar[R].Course No.63221,Kingston,Ontario,Canada:Min-ing Engineering Department,Queens University,1978.
[23]MOJTABAI N,BEATTIE S G.Empirical Approach toPrediction of Damage in Bench Blasting[J].Trans InstMin and Metall Sect A,1996,105:A75-A80.
[24]HULSHIZER A J.Acceptable Shock and Vibration Lim-its for Freshly Placed and Maturing Concrete[J].ACIMaterials Journal,1996,93(6):524-533.
[25]DAVIDSAVOR T A,VITTON S J,DONG J.Analysis ofBlast Damage to Green Concrete:ADynamic Testing Ap-proach to Field Cured Specimens[C]∥Proceedings ofthe Annual Conference on Explosives and Blasting Tech-nique,v II,2003:231-243.
[26]朱传统,张正宇,佟锦岳,等.爆破对新浇混凝土的影响和控制标准的研究[J].爆破,1990,7(3):28-32.[26]ZHU Chuan-tong,ZHANG Zheng-yu,TONG Jin-yue,etal.Study on the Influence of Blasting on Freshly PlacedConcrete and Its Control Standards[J].Blasting,1990,7(3):28-32.(in Chinese)
[27]水工建筑物岩石基础开挖工程施工技术规范(SL47——94)[S].北京:水利电力出版社,1994.[27]Construction Technical Specification on Rock FoundationExcavation Engineering of Hydraulic StructuresSL47——94[S].Beijing:China Water Power Press,1994.(in Chinese)
[28]黄琦,胡峰.爆炸荷载下混凝土的力学特性测试研究[J].煤炭学报,1996,21(5):502-505.[28]HUANG Qi,HU Feng.Test of Mechanical Properties ofConcrete Under the Load of Blasting[J].Journal of Chi-na Coal Society,1996,21(5):502-505.(in Chinese)
[29]卢文波.新浇筑基础混凝土爆破安全震动速度的确定[J].爆炸与冲击,2002,22(4):327-332.[29]LU Wen-bo.Determination of the Limit of the Safety Ve-locity for Young Foundation Concrete under Blasting Vi-bration Loading[J].Explosion and Shock Waves,2002,22(4):327-332.(in Chinese)
[30]陈明,卢文波.新浇大坝基础混凝土爆破安全震动速度的研究[J].武汉大学学报(工学版),2004,37(2):4-9.[30]CHEN Ming,LU Wen-bo.Research on Safety VibrationVelocity for Freshly Mixed Concrete of Dam FoundationUnder Loading of Blasting Vibration[J].EngineeringJournal of Wuhan University.2004,37(2):4-9.(in Chi-nese)
[31]水电水利工程爆破施工技术规范(DL/T 5135——2001)[S].天津:天津大学出版社,2002.[31]Specifications of Excavation Blasting for Hydropower andWater Conservancy Project DL/T 5135——2001[S].Tianjin:Tianjin University Press,2002.(in Chinese)
[32]水工建筑物岩石基础开挖工程施工技术规范(DL/T5389——2007)[S].北京:中国电力出版社,2007.[32]Construction Technical Specification on Rock FoundationExcavation Engineering of Hydraulic Structures DL/T5389——2007[S].Beijing:China Power Press,2007.(in Chinese)
[33]吴绵拔,胡元育.大亚湾核电站核岛的振动监测[J].岩石力学与工程学报,1998(05):116-120.[33]WUMian-ba,HUYuan-yu.Vibration Monitoring Test forNuclear Island of Daya Bay Nuclear Power Station[J].Chinese Journal of Rock Mechanics and Engineering,1998(05):116-120.(in Chinese)
[34]姚文生.三门核电土石方工程中深孔爆破法的应用[J].工程爆破,2004(3):76-78.[34]YAO Wen-sheng.Application of Deep-hole Bench Blas-ting Method for Rock Excavation in Sanmen NuclearPower Plant Project[J].Engineering Blasting,2004(3):76-78.(in Chinese)
[35]韩文红.秦山核电站核岛环廊爆破开挖技术探讨[J].爆破器材,2005(5):34-35.[35]HAN Wen-hong.Investigation on the Blasting ExcavationTechnique of the Circle of Nuclear React Building[J].Explosive Materials,2005(5):34-35.(in Chinese)
[36]刘维柱,方向,高振儒,等.田湾核电站负挖爆破地震波衰减参数的回归与分析[J].爆破,2003,20(2):72-74,79.[36]LIU Wei-zhu,FANG Xiang,GAO Zhen-ru,et al.Regres-sion and Analysis for Attenuation Parameters of BlastingSeismic Wave in Negative Digging at Tianwan NuclearPower Station[J].Blasting,2003,20(2):72-74,79.(in Chinese)
[37]唐海,李海波.岭澳核电站二期工程基础开挖爆破震动衰减规律[J].爆破,2008,25(4):88-91.[37]TANG Hai,LI Hai-bo.Analysis for Blasting VibrationAttenuation Law in Groundwork Digging in the Second-stage Project in Lingao Nuclear Power Station[J].Blas-ting,2008,25(4):88-91.(in Chinese)
[38]宁强,方向,汪明星.阳江核电站负挖爆破地震波衰减参数的回归分析与研究[J].爆破器材,2009(2):29-31.[38]NING Qiang,FANG Xiang,WANG Ming-xing.Engineer-ing Regression and Analysis for Attenuation Parametersof Blasting Seismic Wave in Negative Digging atYangjiang Nuclear Power Station[J].Explosive Materi-als,2009(2):29-31.(in Chinese)
[39]娄建武,徐全军,龙源.影响核岛新浇混凝土强度的爆破振动速度阈值研究[J].世界地震工程,2003(2):163-167.[39]LOU Jian-wu,XU Quan-jun,LONG Yuan.Research onThreshold for Influence of Blasting Vibration Velocityover the Fresh Concrete Quality of the Nuclear PowerStation[J].World Information On Earthquake Engineer-ing.2003(2):163-167.(in Chinese)
[40]余五一.秦山核电站三期工程大型基坑开挖爆破技术[J].探矿工程(岩土钻掘工程),2002(S1):390-393,395.[40]SHE Wu-yi.Blasting Excavation Technique in QinshangNuclear Power Plant[J].Exploration Engineering(Drill-ing&Tunneling),2002(S1):390-393,395.(in Chi-nese)
[41]陈作彬.田湾核电站扩建山体爆破工程爆破质量安全控制[J].探矿工程(岩土钻掘工程),2009(3):76-78.[41]CHEN Zuo-bin.Quality and Safety Control on Blasting ofMountain for Tianwan Nuclear Power Plant ExtensionProject[J].Exploration Engineering(Rock&Soil Drill-ing and Tunneling),2009(3):76-78.(in Chinese)
[42]沈林.岭澳核电站BOP及廊道负挖工程中的岩石控制爆破[J].水利水电施工,2000(2):49-50.[42]SHEN Lin.Control blasting of rock excavation in LingAoNuclear Power Plant[J].Construction of Hydraulic En-gineering,2000(2):49-50.(in Chinese)
[43]唐春海,于亚伦,王建宙.爆破地震动安全判据的初步探讨[J].有色金属,2001,53(1):1-4.[43]TANG Chun-hai,YU Ya-lun,WANG Jiang-zhou.Ele-mentary Study of Safety Criterion for Blasting Vibration,Nonferrous Metals,2001,53(1):1-4.(in Chinese)
[44]吴德伦,叶晓明.工程爆破安全振动速度综合研究[J].岩石力学与工程学报,1997,16(3):266-273.[44]WU De-lun,YE Xiao-ming.A Comprehensive Reviewand Commendation of Blast Vibration Safety Velocity[J].Chinese Journal of Rock Mechanics and engineer-ing,1997,16(3):266-273.(in Chinese)
[45]石崇,毕卫国.爆破地震破坏判据的探讨[J].岩土力学.2004(S1):115-118.[45]SHI Chong,BI Wei-guo.Discussion of blasting damagecriteria.[J].Rock and Soil Mechanics.2004(S1):115-118.(in Chinese)
[46]钱七虎,陈士海.爆破地震效应[J].爆破,2004,21(02):1-5.[46]QIAN Qi-hu,CHEN Shi-hai.Blasting Vibration Effect[J].Blasting,2004,21(02):1-5.(in Chinese)
[47]SINGH P K,ROY P M,SINHA A.Standardization ofBlast Vibration Damage Threshold for the Safety of Resi-dential Structures in Mining Area.[C]∥The Asina-Pa-cific Symposium on Blasting Techniques.Beijing:Meral-lurgical Industry Press,2009:581-589.
[48]赵明生,梁开水,曹跃,等.爆破地震作用下建(构)筑物安全标准探讨[J].爆破,2008,25(04):24-27.[48]ZHAO Ming-sheng,LIANG Kai-shui,CAO Yue,et al.Discussion on the Security Criteria of Construction(Structure)of Building under Blasting Vibration[J].Blasting,2008,25(04):24-27.(in Chinese)
[49]刘满堂,陈庆寿.建筑结构对爆破地震的动力响应特性研究[J].爆破,2005,22(04):23-28.[49]LIUMan-tang,CHENQing-shou.Characteristics of Build-ing Structure Dynam ic Response to Blasting Earthquake[J].Blasting,2005,22(04):23-28.(in Chinese)
[50]中国生,徐国元,熊正明.基于小波变换的爆破地震信号能量分析法的应用研究[J].爆炸与冲击,2006(03):222-227.[50]ZHONG Guo-shen,XU Guo-yuan,XIONG Zheng-ming.Application Research of the Energy Analysis Method forBlasting Seismic Signals Based on Wavelet Transform[J].Explosion and Shock Waves,2006(03):222-227.(in Chinese)