摘要
简要回顾了国内外爆破振动安全判据的发展历程,综合分析了岩石高边坡和地下洞室围岩的爆破振动破坏机理、动力稳定性评价方法和爆破振动对新浇混凝土影响等方面的研究现状与进展,介绍了国内矿山、水电及核电行业采用的有关建(构)筑物、岩石高边坡、地下洞室围岩、基岩以及新浇混凝土的主要爆破振动安全判据标准,并与国外相关标准进行比较。分析讨论了以往爆破振动破坏机理研究中存在的问题以及现有爆破安全判据中的不足,如未对爆破地震波作用下岩体中波的传播问题和边坡动力响应问题的不同破坏机理加以区分,现有爆破振动安全判据中未对振动频率和持续时间的影响加以考虑等。
The development of the safety criterion of blasting vibration is briefly reviewed.The state and advance is introduced and analyzed in the mechanism of failure or damage induced by blasting vibration,the analysis methods of dynamic stability for rock slopes and surrounding rock mass of underground caverns under blasting vibration,and the influence of blasting vibration on early-aged concrete,etc.The safety criteria of blasting vibration for high rock slope,underground caverns,foundation rock mass and early-aged concrete adopted by mining industry,hydropower and nuclear power engineering in China are presented,and compared with those employed abroad.Main problems exist in the study of the damage mechanism induced by blasting vibration and deficiencies of the currently adopted safety criteria are analyzed and discussed,such as there is made no distinguish between the different damage mechanics induced by the propagation of blasting seismic in rock mass and by the dynamic response of rock slope,and the adopted safety criteria without considering the influence of vibration frequency and duration and so on.
引文
[1]卢文波,赖世骧,朱传云.三峡工程岩石基础爆破震动控制安全标准[J].爆炸与冲击,2001,21(1):67-71.[1]LU Wen-bo,LAI Shi-xiang,ZHU Chuan-yun.Safety Stand-ards of Blast Vibrations Adopted in Rock Base Excavation ofThree Gorge Project[J].Explosion and Shock Waves,2001,21(1):67-71.(in Chinese)
    [2]李海波,蒋会军,赵坚,等.动荷载作用下岩体工程安全的几个问题[J].岩石力学与工程学报,2003,22(11):1 887-1 891.[2]LI Hai-bo,JIANG Hui-jun,ZHAO Jian,et al.Some Prob-lems about Safety Analysis of Rock Engineering under Dy-namic Load[J].Chinese Journal of Rock Mechanics andEngineering,2003,22(11):1 887-1 891.(in Chinese)
    [3]爆破安全规程(GB6722——2003)[S].北京:中国标准出版社,2004.[3]Safety Regulatoins for Blasting GB6722——2003[S].Beijing:State Standardization Publishing House,2004.(inChinese)
    [4]杨桂桐.爆破振动效应及边坡动态分析[J].爆破,1989,6(4):9-14.[4]YANG Gui-tong.Blast Shock Effect and Slope DynamicState Analysis[J].Blasting,1989,6(4):9-14.(in Chi-nese)
    [5]甄胜利.岩质高边坡开挖爆破动力稳定分析研究[C]∥工程爆破文集(第五辑).武汉:中国地质大学出版社,1993:110-113.[5]ZHEN Sheng-li.Dynamic Stability Analysis of Blasting andExcavation of Rock High Slope[C]∥Conference of Engi-neering Blasting(Vol.5).Wuhan:China University of Geo-sciences Press,1993:110-113.(in Chinese)
    [6]张永哲.岩质高边坡开挖爆破动力稳定分析[J].工程爆破,1996,2(4):31-38.[6]ZHANG Yong-zhe.Dynamic Stability Analysis of Blastingand Excavation of Rock High Slope[J].Engineering Blas-ting,1996,2(4):31-38.(in Chinese)
    [7]陈明,卢文波,舒大强,等.爆破振动作用下边坡极限平衡分析的等效加速度计算方法[J].岩石力学与工程学报,2009,28(04):784-790.[7]CHEN Ming,LU Wen-bo,SHU Da-qiang,et al.Calcula-tion Method of Equivalent Acceleration for Limit Equilib-rium Analysis of Slope Under Blasting Vibration[J].Chi-nese Journal of Rock Mechanics and Engineering,2009,28(04):784-790.(in Chinese)
    [8]卢文波,赖世骧,朱传云.岩石高边坡爆破振动动力稳定分析[J].矿冶工程,1996,16(1):3-7.[8]LU Wen-bo,LAI Shi-xiang,ZHU Chuan-yun.Analysis ofthe Dynamic Stability of Rock Slopes Under Blasting Vi-bration Conditions[J].Mining and Metallurgical Engi-neering,1996,16(1):3-7.(in Chinese)
    [9]阎坤,张云.岩质高边坡爆破动力稳定分析方法研究[J].水力发电,1996,(8):27-29.[9]YAN Kun,ZHANG Yun.Study on Dynamic Stability A-nalysis Method of the High Side-Slope Rock Blasting[J].Water Power,1996,(8):27-29.(in Chinese)
    [10]许红涛,卢文波,周创兵,等.基于时程分析的岩质高边坡开挖爆破动力稳定性计算方法[J].岩石力学与工程学报,2006,25(11):2 213-2 219.[10]XU Hong-tao,LU Wen-bo,ZHOU Chuang-bing,et al.Time History Analysis Method for Evaluating DynamicStability of High Rock Slope Under Excavation Blasting[J].Chinese Journal of Rock Mechanics and Engineer-ing,2006,25(11):2 213-2 219.(in Chinese)
    [11]刘亚群,李海波,李俊如,等.爆破荷载作用下黄麦岭磷矿岩质边坡动态响应的UDEC模拟研究[J].岩石力学与工程学报,2004,23(21):3 659-3 663.[11]LIU Ya-qun,LI Hai-bo,LI Jun-ru,et al.UDEC Silmula-tion on Dynamic Response of Rock Slope of Huangmail-ing Phosphorite Mine under Explosion[J].Chinese Jour-nal of Rock Mechanics and Engineering,2004,23(21):3 659-3 663.(in Chinese)
    [12]陈明,卢文波,吴亮,等.小湾水电站岩石高边坡爆破振动速度安全阈值研究[J].岩石力学与工程学报,2007,26(1):51-56.[12]CHEN Ming,LUWen-bo,WULiang,et al.Safety Thresh-old of Blasting Vibration Velocity to High Rock Slope ofXiaowan Hydropower Station[J].Chinese Journal of RockMechanics and Engineering,2007,26(1):51-56.(in Chi-nese)
    [13]SAVELY J P.Designing a Final Blast to Improve Stabili-ty[A].Preprint No.86~50,Presented at the SME An-nual Meeting,New Orleans,Louisiana,U.S.A.,1986.
    [14]许海亮,张继春,任贺靖.隧道掘进爆破震动放大效应试验研究[J].地下空间与工程学报,2007,3(4):609-612.[14]XU Hai-liang,ZHANG Ji-chun,REN He-jing.Experi-mental Study on Magnifying Effects of Vibration Resul-ting from Driving Blasting in Tunnel[J].Chinese Journalof Underground Space and Engineering,2007,3(4):609-612.(in Chinese)
    [15]ANSELL A.Recommendations for Shotcrete on Rock Sub-jected to Blasting Vibrations Based on Finite Element Dy-namic Analysis[J].Magazine of Concrete Research,2005,57(3):123-133.
    [16]STJERN G,MYRVANG A.The Influence of Blasting onGrouted Rockbolts[J].Tunneling and UndergroundSpace Technology,1995,13(1):65-70.
    [17]TANNANT D D,BRUMMER R K.Rockbolt BehaviourUnder Dynamic Loading Field Tests and Modeling[J].Int J Rock Mech Min Sci Geomech Abstr,1995,32(6):537-550.
    [18]边克信.爆破地震对地下构筑物的影响[J].中国矿山工程,1981,1(6):25-36.[18]BIAN Ke-xin.Influence of Blasting Seismic on Under-ground Structure[J].China Mine Engineering,1981,1(6):25-36.(in Chinese)
    [19]朱瑞赓,李铮.爆炸地震波的现场测量及其安全距离[J].爆炸与冲击,1982,2(1):60-67.[19]ZHU Rui-geng,LI Zhen.In-situ Measurement of BlastingSeismic Waves and Their Safety Distance[J].Explosionand Shock Waves,1982,2(1):60-67.(in Chinese)
    [20]LANGEFORS U,KIHLSTROM B.The Modern Techniqueof Rock Blasting[M].NewYork:John Wiley&Sons Inc,1973.
    [21]HOLMBERG R,PERSSON P A.The Swedish Approachto Contour Blasting[C]∥Proceedings of the 4th Confer-ence on Explosive and Blasting Technique.[S.l.]:[s.n.],1978:113-127.
    [22]BAUER A,CALDER P N.Open Pit and Blast Seminar[R].Course No.63221,Kingston,Ontario,Canada:Min-ing Engineering Department,Queens University,1978.
    [23]MOJTABAI N,BEATTIE S G.Empirical Approach toPrediction of Damage in Bench Blasting[J].Trans InstMin and Metall Sect A,1996,105:A75-A80.
    [24]HULSHIZER A J.Acceptable Shock and Vibration Lim-its for Freshly Placed and Maturing Concrete[J].ACIMaterials Journal,1996,93(6):524-533.
    [25]DAVIDSAVOR T A,VITTON S J,DONG J.Analysis ofBlast Damage to Green Concrete:ADynamic Testing Ap-proach to Field Cured Specimens[C]∥Proceedings ofthe Annual Conference on Explosives and Blasting Tech-nique,v II,2003:231-243.
    [26]朱传统,张正宇,佟锦岳,等.爆破对新浇混凝土的影响和控制标准的研究[J].爆破,1990,7(3):28-32.[26]ZHU Chuan-tong,ZHANG Zheng-yu,TONG Jin-yue,etal.Study on the Influence of Blasting on Freshly PlacedConcrete and Its Control Standards[J].Blasting,1990,7(3):28-32.(in Chinese)
    [27]水工建筑物岩石基础开挖工程施工技术规范(SL47——94)[S].北京:水利电力出版社,1994.[27]Construction Technical Specification on Rock FoundationExcavation Engineering of Hydraulic StructuresSL47——94[S].Beijing:China Water Power Press,1994.(in Chinese)
    [28]黄琦,胡峰.爆炸荷载下混凝土的力学特性测试研究[J].煤炭学报,1996,21(5):502-505.[28]HUANG Qi,HU Feng.Test of Mechanical Properties ofConcrete Under the Load of Blasting[J].Journal of Chi-na Coal Society,1996,21(5):502-505.(in Chinese)
    [29]卢文波.新浇筑基础混凝土爆破安全震动速度的确定[J].爆炸与冲击,2002,22(4):327-332.[29]LU Wen-bo.Determination of the Limit of the Safety Ve-locity for Young Foundation Concrete under Blasting Vi-bration Loading[J].Explosion and Shock Waves,2002,22(4):327-332.(in Chinese)
    [30]陈明,卢文波.新浇大坝基础混凝土爆破安全震动速度的研究[J].武汉大学学报(工学版),2004,37(2):4-9.[30]CHEN Ming,LU Wen-bo.Research on Safety VibrationVelocity for Freshly Mixed Concrete of Dam FoundationUnder Loading of Blasting Vibration[J].EngineeringJournal of Wuhan University.2004,37(2):4-9.(in Chi-nese)
    [31]水电水利工程爆破施工技术规范(DL/T 5135——2001)[S].天津:天津大学出版社,2002.[31]Specifications of Excavation Blasting for Hydropower andWater Conservancy Project DL/T 5135——2001[S].Tianjin:Tianjin University Press,2002.(in Chinese)
    [32]水工建筑物岩石基础开挖工程施工技术规范(DL/T5389——2007)[S].北京:中国电力出版社,2007.[32]Construction Technical Specification on Rock FoundationExcavation Engineering of Hydraulic Structures DL/T5389——2007[S].Beijing:China Power Press,2007.(in Chinese)
    [33]吴绵拔,胡元育.大亚湾核电站核岛的振动监测[J].岩石力学与工程学报,1998(05):116-120.[33]WUMian-ba,HUYuan-yu.Vibration Monitoring Test forNuclear Island of Daya Bay Nuclear Power Station[J].Chinese Journal of Rock Mechanics and Engineering,1998(05):116-120.(in Chinese)
    [34]姚文生.三门核电土石方工程中深孔爆破法的应用[J].工程爆破,2004(3):76-78.[34]YAO Wen-sheng.Application of Deep-hole Bench Blas-ting Method for Rock Excavation in Sanmen NuclearPower Plant Project[J].Engineering Blasting,2004(3):76-78.(in Chinese)
    [35]韩文红.秦山核电站核岛环廊爆破开挖技术探讨[J].爆破器材,2005(5):34-35.[35]HAN Wen-hong.Investigation on the Blasting ExcavationTechnique of the Circle of Nuclear React Building[J].Explosive Materials,2005(5):34-35.(in Chinese)
    [36]刘维柱,方向,高振儒,等.田湾核电站负挖爆破地震波衰减参数的回归与分析[J].爆破,2003,20(2):72-74,79.[36]LIU Wei-zhu,FANG Xiang,GAO Zhen-ru,et al.Regres-sion and Analysis for Attenuation Parameters of BlastingSeismic Wave in Negative Digging at Tianwan NuclearPower Station[J].Blasting,2003,20(2):72-74,79.(in Chinese)
    [37]唐海,李海波.岭澳核电站二期工程基础开挖爆破震动衰减规律[J].爆破,2008,25(4):88-91.[37]TANG Hai,LI Hai-bo.Analysis for Blasting VibrationAttenuation Law in Groundwork Digging in the Second-stage Project in Lingao Nuclear Power Station[J].Blas-ting,2008,25(4):88-91.(in Chinese)
    [38]宁强,方向,汪明星.阳江核电站负挖爆破地震波衰减参数的回归分析与研究[J].爆破器材,2009(2):29-31.[38]NING Qiang,FANG Xiang,WANG Ming-xing.Engineer-ing Regression and Analysis for Attenuation Parametersof Blasting Seismic Wave in Negative Digging atYangjiang Nuclear Power Station[J].Explosive Materi-als,2009(2):29-31.(in Chinese)
    [39]娄建武,徐全军,龙源.影响核岛新浇混凝土强度的爆破振动速度阈值研究[J].世界地震工程,2003(2):163-167.[39]LOU Jian-wu,XU Quan-jun,LONG Yuan.Research onThreshold for Influence of Blasting Vibration Velocityover the Fresh Concrete Quality of the Nuclear PowerStation[J].World Information On Earthquake Engineer-ing.2003(2):163-167.(in Chinese)
    [40]余五一.秦山核电站三期工程大型基坑开挖爆破技术[J].探矿工程(岩土钻掘工程),2002(S1):390-393,395.[40]SHE Wu-yi.Blasting Excavation Technique in QinshangNuclear Power Plant[J].Exploration Engineering(Drill-ing&Tunneling),2002(S1):390-393,395.(in Chi-nese)
    [41]陈作彬.田湾核电站扩建山体爆破工程爆破质量安全控制[J].探矿工程(岩土钻掘工程),2009(3):76-78.[41]CHEN Zuo-bin.Quality and Safety Control on Blasting ofMountain for Tianwan Nuclear Power Plant ExtensionProject[J].Exploration Engineering(Rock&Soil Drill-ing and Tunneling),2009(3):76-78.(in Chinese)
    [42]沈林.岭澳核电站BOP及廊道负挖工程中的岩石控制爆破[J].水利水电施工,2000(2):49-50.[42]SHEN Lin.Control blasting of rock excavation in LingAoNuclear Power Plant[J].Construction of Hydraulic En-gineering,2000(2):49-50.(in Chinese)
    [43]唐春海,于亚伦,王建宙.爆破地震动安全判据的初步探讨[J].有色金属,2001,53(1):1-4.[43]TANG Chun-hai,YU Ya-lun,WANG Jiang-zhou.Ele-mentary Study of Safety Criterion for Blasting Vibration,Nonferrous Metals,2001,53(1):1-4.(in Chinese)
    [44]吴德伦,叶晓明.工程爆破安全振动速度综合研究[J].岩石力学与工程学报,1997,16(3):266-273.[44]WU De-lun,YE Xiao-ming.A Comprehensive Reviewand Commendation of Blast Vibration Safety Velocity[J].Chinese Journal of Rock Mechanics and engineer-ing,1997,16(3):266-273.(in Chinese)
    [45]石崇,毕卫国.爆破地震破坏判据的探讨[J].岩土力学.2004(S1):115-118.[45]SHI Chong,BI Wei-guo.Discussion of blasting damagecriteria.[J].Rock and Soil Mechanics.2004(S1):115-118.(in Chinese)
    [46]钱七虎,陈士海.爆破地震效应[J].爆破,2004,21(02):1-5.[46]QIAN Qi-hu,CHEN Shi-hai.Blasting Vibration Effect[J].Blasting,2004,21(02):1-5.(in Chinese)
    [47]SINGH P K,ROY P M,SINHA A.Standardization ofBlast Vibration Damage Threshold for the Safety of Resi-dential Structures in Mining Area.[C]∥The Asina-Pa-cific Symposium on Blasting Techniques.Beijing:Meral-lurgical Industry Press,2009:581-589.
    [48]赵明生,梁开水,曹跃,等.爆破地震作用下建(构)筑物安全标准探讨[J].爆破,2008,25(04):24-27.[48]ZHAO Ming-sheng,LIANG Kai-shui,CAO Yue,et al.Discussion on the Security Criteria of Construction(Structure)of Building under Blasting Vibration[J].Blasting,2008,25(04):24-27.(in Chinese)
    [49]刘满堂,陈庆寿.建筑结构对爆破地震的动力响应特性研究[J].爆破,2005,22(04):23-28.[49]LIUMan-tang,CHENQing-shou.Characteristics of Build-ing Structure Dynam ic Response to Blasting Earthquake[J].Blasting,2005,22(04):23-28.(in Chinese)
    [50]中国生,徐国元,熊正明.基于小波变换的爆破地震信号能量分析法的应用研究[J].爆炸与冲击,2006(03):222-227.[50]ZHONG Guo-shen,XU Guo-yuan,XIONG Zheng-ming.Application Research of the Energy Analysis Method forBlasting Seismic Signals Based on Wavelet Transform[J].Explosion and Shock Waves,2006(03):222-227.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心