矿井井塔的梁柱刚度比对剪力滞后效应的影响
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
利用大型有限元分析软件ANSYS,结合井塔的实际框筒结构工程进行建模分析,通过矿井井塔在水平荷载作用下的具体性能表现,得出梁柱刚度比对剪力滞后效应有较大的影响。再对梁柱刚度比对剪力滞后效应的现象进行分析,将计算结果与仿真分析的结果进行比较,提出改进方法。
Making use of large finite element analysis software ANSYS,combine with the mine shaft tower actual frame tube structure project to model analysis,by means of concrete performance of mine shaft tower under the effect of horizontal load,come to a conclusion that beam column stiffness ratio has a great influence on shear lag effect.Then analyse the phenomenon of beam column stiffness ratio to shear lag effect,make a comparison on calculated results and simulation analysis results,to move an improved method.It has a great guiding significance for the mine shaft tower structural design.
引文
[1]黄本才.高层建筑结构计算与设计[M].上海:同济统计大学出版社,1997.
    [2]李正良.复杂体型筒体结构考虑剪力滞后效应的简化分析[D],重庆:重庆建筑大学,1987.
    [3]高雁.筒体结构剪力滞后效应研究及其简化分析[D].重庆:重庆大学,2006.
    [4]张文福,姚芳.三角形高层框筒结构在水平荷载作用下剪力滞后的有限元分析[J].四川建筑科学研究,2005,31(1):45-47.
    [5]方鄂华.多层及高层建筑结构设计[M].北京:地震出版社.1994.
    [6]梁启智,陈加猛.高层筒中筒结构的整体稳定分析[J],华南理工大学学报:自然科学版,1998,26(1):76-84.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心