活动断层附近某水电站坝址的选择
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
水利水电工程坝址选择的一个重要原则,就是要尽量避开活动断层。随着水利水电工程的大量兴建,水利水电工程的大坝与活动断层的距离有越来越近的趋势。现行的GB50487-2008《水利水电工程地质勘察规范》和GB50287-2006《水力发电工程地质勘察规范》对坝址的选择都规定———"大坝等主体建筑物不宜建在活动断层上"。文章以坝址与活动断层相距0.3~1.6 km的新疆某水电站为例,以活动断层是否穿越大坝,即大坝是否存在抗断问题为选坝准则,来论述活动断层附近的坝址选择问题。
One important principle for dam selection of water resources and hydropower engineering is to possibly avoid active faults.With increasing construction of water resources and hydropower projects,there is a tendency that distances between dams of water resources and hydropower projects and active faults are closer and closer.Both Code for Engineering Geological Investigation of Water Resources and Hydropower,GB50487-2008 and Code for Hydropower Engineering Geological Investigation,GB50287-2006 currently applied specify selection of dam site: main structures such as dam should not be built on active faults.In this paper,one hydropower station in Xinjiang is taken as an example.Its dam site is 0.3~1.6 km away from active faults.Based on the principal of dam site selection,namely whether the active fault crosses the dam site and the dam is with fault resistance,selection of dam site close to active faults is discussed.
引文
[1]新疆水利水电勘测设计研究院.新疆某水电站工程地质勘察报告(可研阶段)[R].2009,2.
    [2]新疆防御自然灾害研究所.某水电站工程场地地震安全性评价复核报告[R].2009,2.
    [3]GB50287-2006,水力发电工程地质勘察规范[S].北京:中国计划出版社,2006.
    [4]GB50487-2008,水利发电工程地质勘察规范[S].北京:中国计划出版社,2008.
    [5]DL/T5335-2006,水电水利工程区域构造稳定性勘察技术规定[S].北京:中国电力出版社,2006.
    [6]工程地质学教研组.活断层和地震层工程地质研究[M]//西南科技大学电子教案,2005,9.
    [7]彭敦复.新疆水利水电工程活断层处理的工程实践[M].乌鲁木齐:新疆人民出版社,2005.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心