引文
[1]Shiozaki Y,Nishikawa E,Deguchi T.Lessons fromthe great Hanshin earthquake[M].Kyoto:Creates-Kamogawa Publishers,2005:6.
[2]赵成刚.生命线地震工程[M].北京:地震出版社,1994:167.
[3]Shumuta Y,Yang S Y,Tohma J,et al.Long-term infrastructure renewal and new construction planning with a focus on power lifelines-part I:framework[C].3rd EQTAP International Workshop,Manila,Philippine,2000.
[4]Chen W F,Scawthorn C.Earthquake engineering handbook[M].Florence:CRC Press,2003:23-25.
[5]USA Department of the Interior,USA Geological Survey.The richter magnitude scale[EB/OL].[2009-10-27].http://earthquake.usgs.gov/learn/topics/richter.php.
[6]A Department of the Interior,USA Geological Survey.Earthquake glossary-intensity[EB/OL].[2009-06-03].http://earthquake.usgs.gov/learn/glossary/term=intensity.
[7]W H Freeman and Company.Modified mercalli intensity scale[EB/OL].[2003-10-15].http://www.abag.ca.gov/bayarea/eqmaps/doc/mmi.html.
[8]杨理华,陈国林.唐山地震的宏观烈度分布[J].地震工程与工程振动,1981,2(1):2-7.Yang Lihua,Chen Guolin.Intensity distribution of the Tangshan earthquake[J].Earthquake Engineering and Engineering Vibration,1981,2(1):2-7(in Chinese).
[9]Yang S,Fan M,Hu X.Optimization planning of urban power system based on the assessment of seismic risk[C].International Conference on Electrical Engineering,Xi'an,China,2001.
[10]Liu H,Housner G W,Xie L,et al.The great Tangshan earthquake of1976[M].California:California Institute of Technology,2002:444-872.
[11]Kinki Regional Development Bureau,Ministry of Land,Infrastructure and Transport.Great Hanshin earthquake restoration[EB/OL].[2001-12-27].http://www.kkr.mlit.go.jp/en/topics_hanshin.html.
[12]陈运泰,许力生,张勇,等.2008年5月12日汶川特大地震震源特性分析报告[R].北京:中国地震局地球物理所,2008.
[13]Bardet J P,Oka F,Sugito M,et al.The great Hanshin earthquake disaster[R].Los Angeles:University of Southern California,1995.
[14]日本内阁府.我が国で発生する地震[EB/OL].[2007-6-30].http://www.bousai.go.jp/jishin/chubou/taisaku_gaiyou/gaiyou_top.html.
[15]新华网.5月12日四川汶川发生里氏8.0级特大地震[EB/OL].[2009-05-12].http://news.xinhuanet.com/world/2009-05/12/content_11370800.htm.
[16]Noda M.Disaster and restoration of electricity supply system by Hanshin-Awaji earthquake[C].APEC Seminar on Earthquake Disaster Management of Energy Supply Systems,Taipei,China,2001.
[17]Fan M T,Yang S Y,Hu X H.Long-term infrastructure renewal and new construction planning with a focus on power lifelines:comparison of Tianjin and Kobe[C].Joint Seminar on Urban Disaster Management,Beijing,China,2000.
[18]日本气象厅.震度と加速度[EB/OL].[2003-09-26].http://www.seisvol.kishou.go.jp/eq/kyoshin/kaisetsu/comp.htm.
[19]于永清,李光范,李鹏,等.四川电网汶川地震电力设施受灾调研分析[J].电网技术,2008,32(11):T1-T6.Yu Yongqing,Li Guangfan,Li Peng,et al.Investigation and analysis of electric equipment damage in Sichuan power grid caused by Wenchuan earthquake[J].Power System Technology,2008,32(11):T1-T6(in Chinese).
[20]吴锦瑜,徐寿松.汶川大地震震中映秀镇恢复电网供电[EB/OL].[2008-07-24].http://finance.baidu.com/guonei/2008-07-24/181311160974.html.
[21]马文涛,李海鸥,杨主恩,等.汶川Ms8.0地震对四川省水电水利工程场地安全性评价结果的检验[J].地震地质,2008,30(3):797-803.Ma Wentao,Li Haiou,Yang Zhuen,et al.Verifying the reservoir seismic safety assessments in Sichuan province with the Ms8.0Wenchuan earthquake[J].Seismology and Geology,2008,30(3):797-803(in Chinese).
[22]中国地震局.GB18306—2001中国地震动参数区划图[S].北京:地震出版社,2001.
[23]网易.1933年四川茂县发生7.5级大地震始末[EB/OL].[2008-05-13].http://www.cq.xinhuanet.com/news/2008-05/13/content_13245050.htm.
[24]Bommer J,Abrahamson N.Why do modern probabilistic seismic-hazard analyses often lead to increased hazard estimates[J].Bulletin of the Seismological Society of America,2006,96(6):1967.
[25]Noda M.Robust electric power supply system against disasters[C].APEC Seminar on Earthquake Disaster Management of Energy Supply Systems,Taipei,China,2001.
[26]Schiff A.Hyogoken-Nanbu(Kobe)earthquake of January17,1995:lifeline performance[M].Reston,VA:Amer Society of Civil Engineers,1999:224-235.
[27]Murosaki Y.The great Hanshin earthquake and fire[J].Journal of Disaster Research,2007,2(4):298-302.
[28]Personal Insurance Federation of California.2005Insurance Reference Manual[EB/OL].[2005-08-12].http://pifc.org/insurance_manual/09_earthquake_northridge_factshandling.html.
[29]伍磊,袁越,季侃,等.微型电网及其在防震减灾中的应用[J].电网技术,2008,32(16):32-36.Wu Lei,Yuan Yue,Ji Kan,et al.Microgrid and its application in earthquake prevention and disaster reduction[J].Power System Technology,2008,32(16):32-36(in Chinese).
[30]曹枚根,周福霖,徐忠根,等.大跨越输电塔线体系减震控制分析研究[J].电网技术,2007,31(14):45-51.Cao Meiyin,Zhou Fulin,Xu Zhonggen,et al.Research on seismic control of large crossing transmission towers for transmission lines[J].Power System Technology,2007,31(14):45-51(in Chinese).
[31]程永锋,朱全军,卢智成.变电站电力设施抗震措施研究现状与发展趋势[J].电网技术,2008,32(22):84-89.Cheng Yongfeng,Zhu Quanjun,Lu Zhicheng.Progress and development trend on seismic measures of electric power equipments in transformer substation[J].Power System Technology,2008,32(22):84-89(in Chinese).
[32]岳茂光,李宏男,王东升,等.行波激励下输电塔-导线体系纵向地震反应分析[J].中国电机工程学报,2006,26(23):145-150.Yue Maoguang,Li Hongnan,Wang Dongsheng,et al.Longitudinal response of the power transmission tower-cable system under traveling seismic wave excitations[J].Proceedings of the CSEE,2006,26(23):145-150(in Chinese).
[33]田利,李宏男,黄连壮.多点激励下输电塔–导线体系的侧向地震反应分析[J].中国电机工程学报,2008,28(16):108-114.Tian Li,Li Hongnan,Huang Lianzhuang.Longitudinal response of a power transmission tower-cable system under multi-support excitations[J].Proceedings of the CSEE,2008,28(16):108-114(in Chinese).