冲孔灌注桩施工至不同土层引起的场地振动测评
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
本文结合工程现场实测,研究冲击钻成孔灌注桩施工至不同土层时引起的场地振动效应,并对振动对周边建筑及环境可能引发的影响进行了分析。研究结果表明场地速度峰值基本随着冲孔深度加深而减弱,但岩性较好土层其引发的振动量级亦较大;对振动效应进行评价时应根据具体情况及需求选择适当的评价标准。
Based on in-site test,the ground vibration effects induced by construction of impact bored pile under different soil layers were investigated in the paper.The influence on nearby buildings and circumstances caused by ground vibration were analyzed.The investigation shows that the ground velocity peaks basically descend with the deepening of construction of bored pile.Furthermore,the better lithological character of the soil layer is,the larger magnitude vibrations are aroused.The choice of appropriate evaluation criterion to vibration effect should be on the basis of the specific circumstances and requirements.
引文
[1]姚道平,张艺峰,谢志招,等.打桩振动对建筑物影响评价探讨[J].世界地震工程,2008,24(4):142-147.
    [2]本书编委会.桩基工程手册[Z].北京:中国建筑工业出版社,1995.
    [3]姚道平,张艺峰,卓群,等.利用测试法综合评判打桩振动对建筑物的影响[J].华南地震,2008,28(3):80-88.
    [4]吴铁生.打桩振动效应观测和安全指标探讨[J].高原地震,2004,16(1):40-44.
    [5]GB/T17742-2008,中国地震烈度表[S].
    [6]GB6722-2003,爆破安全规程[S].
    [7]中国工程建设标准化协会建筑振动专业委员会.建筑振动工程手册[Z].北京:中国建筑工业出版社,2002.
    [8]GB10070-88,城市区域环境振动标准[S].

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心