装配式混凝土框架结构的研究与应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
从装配式混凝土框架结构构件、节点和整体性研究方面,总结了装配式混凝土框架结构的国内外研究情况,介绍了装配式混凝土结构在国内外的工程应用和标准化情况,分析了装配式混凝土结构研究与应用中存在的问题,提出了未来装配式建筑的发展方向和需重点解决的问题。
In this paper,the component,node and frame research on precast concrete frame structure in China and other countries are reviewed,the progress on performance and theoretical analysis of precast concrete frame structure are summarized,Engineering application and standardization of precast concrete structure are introduced.At last,the problems with research and application of precast concrete structure are pointed out,and the development direction of future precast concrete structure and several problems which need to be solved urgently are put forward.
引文
[1]北京建筑工程学院建筑技术教研组.装配式建筑设计[M].北京:中国建筑工业出版社,1983
    [2]Morris A E J.Precast Concrete in Architecture[M].London:George Godwin Limited,1987
    [3]黄小坤,田春雨.预制装配式混凝土结构的研究进展[J].住宅产业,2010,09:28~32 Huang Xiao-kun,Tian Chun-yu.Research Progress of Precast Concrete Structure[J].Housing Industry,2010,09:28~32(in Chinese)
    [4]Iverson,James k,Neil M Hawkins.Performance of Precast/Prestressed Concrete Building Structures during Northridge Earthquake[J].PCI Jouranal,1994,(2):38~55
    [5]BSSC.NEHPR(National Earthquake Hazards Reduction Program)Recommended Provisions for the Development of Seismic Regulations for New Buildings and Other Structures[S].Building Seismic Safety Council,Washington,DC,2000
    [6]Nigel Priestley M J.Overview of PRESSS Research Program[J].PCI Journal,1991,(4):50~57
    [7]Nigel Priestley M J.The PRESSS Program-Current Status and Proposed Plans for Phase III[J].PCI Journal,1996(2):22~40
    [8]Cheok,Geraldine S,Lew H S.Performance of Precast Concrete Beam-to Column Connections Subject to Cyclic Loading[J].PCI Journal,1991,(3):56~67
    [9]Cheok,Geraldine S,Lew H S.Model Precast Concrete Beam-to-Column Connections Subject to Cyclic Loading[J].PCI Journal,1993,(4):80~92.
    [10]Morgen,Brian G,Yahya C Kurama.Seismic Design of Friction-Damped Precast Concrete Frame Stuctures[A].Proceedings of the Structures Congress and Exposition,Metropolis and Beyond-Proceedings of the2005 Structures Congress and the2005Forensic Engineering[C].Symposium,2005:2007~2018
    [11]Jubum Kim.Behavior of Hybrid Frames Under Seismic Loading[D].Deptartment of Civil&Environment Engineering.University of Washington,2002
    [12]Vasconez,Rosa M,Antoine E Naaman,et al.Behavior of HPFRC Connections for Precast Concrete Frames Under Reversed Cyclic Loading[J].PCI Journal,1998,(6):58~71
    [13]Nakaki,Suzanne Dow,Robert E Englekirk,et al.Ductile Connectors for a Precast Concrete Frame[J].PCI Journal,1994,(4):46~58
    [14]Englekirk,Robert E.Development and Testing of a Ductile Connector for Assembling Precast Concrete Beams and Columns[J].PCI Journal,1995,(2):36~50
    [15]Loo Y C,Yao B Z.Static and Repeated Load Tests on Precast Concrete Beam-to-Column Connections[J].PCI Journal,1995,(2):106~115
    [16]Resreepo,Jose I,Robert Park,et al.Design of Connections of Earthquake Resisting Precast Reinforced Concrete Perimeter Frames[J].PCI Journal,1995b,(5):68~76
    [17]Resreepo,Jose I,Robert Park,et al.Tests on Connections of Earthquake Resisting Precast Reinforced Concrete Perimeter Frames of Buildings[J].PCI Journal,1995a,(4):44~60
    [18]Ersoy,Ugur,Tugrul Tankut.Precast Concrete Members With Welded Plate Connections Under Reversed Cyclic Loading[J].PCI Journal,1993,(4):94
    [19]Ertas,Onur,Sevket Ozden,et al.Ductile Connectionsin Precast Concrete Moment Resisting Frames[J].PCI Journal,2006,(3):66~76
    [20]Nakaki,Suzanne Dow,John F Stanton,et al.An Overview of the PRESSS Five-story Precast Test Building[J].PCI Journal,1999,(2):26~39
    [21]M J Nigel Priestley.Preliminary Results and Conclusions From the PRESSS Five-Story Precast Concrete Test Building[J].PCI Journal,1999,(6):42~66.
    [22]范力,吕西林,赵斌.预制混凝土框架结构抗震性能研究综述[J].结构工程师,2007,23(4):91~97 Fan Li,Lv Xi-lin,Zhao Bin.Summary of Investigation on Seismic Behavior of Precast Concrete Frame Structures[J].Structural Engineers,2007,23(4):91~97(in Chinese)
    [23]Blandon,John J,Mario E Rodriguez.Behavior of Connections and Floor diaphragms in Seismic-Resisting Precast Concrete Buildings[J].PCI Journal,2005,(2):56~75
    [24]侯雪岩,骆万康.装配式钢筋混凝士楼盖在水平荷载往复作用下的变形性能[J].重庆建筑工程学院学报,1985,2:36~51 Hou Xue-yan,Luo Wan-kang.Deformation Behavior of Precast Reinforced-Concrete Floor under Repeated and Reversed Horizontal Forces[J].Journal of Chongqing Building Engineering University,1985,2:36~51(in Chinese)
    [25]林宗凡,Sagan E I,Kreger M E.装配式抗震框架延性节点的研究[J],同济大学学报,1998,26(2):134~138 Lin Zong-fan,Sagan E I,Kreger M E.Study on the Ductile Connections for Precast Aseismic Frame[J].Journal of Tongji University,1998,26(2):134~138(in Chinese)
    [26]李于辉,张季超,邱剑辉.新型叠合梁-柱端节点试验研究[J].建筑技术开发,2009,5:24~29 Li Yu-hui,Zhang Ji-chao,Qiu Jian-hui.Study on the New Composite Beam-Colum Frame Exterior Joints[J].Building Technique Development,2009,5:24~29(in Chinese)
    [27]秦亮.装配整体式叠合连续楼板足尺加载试验研究[D].广州:广州大学,2006 Qing Liang.Full Scale Loading Experimental Research on Assemble Monolithic Continuous Composite Slab[D].Guangzhou:Guangzhou University,2006(in Chinese)
    [28]邱剑辉,,张季超,窦祖融,等.新型装配整体式混凝土结构构造处理措施探讨[J].广州建筑,2009,37(1):14~17 Qiu Jian-hui,Zhang Ji-chao,Dou Zu-rong,et al.Study on the Structural Treating Measures of New Assembled Monolithic Concrete Structure[J].Guangzhou Architechture,2009,37(1):14~17(in Chinese)
    [29]许勇,刘波,张季超,等.新型装配整体式混凝土结构主次梁节点试验研究[J].工业建筑,2009,39(8):114~117 Xu Yong,Liu Bo,Zhang Ji-chao,et al.Full-Sacle Experimental Study on the Reinforced Concrete Beam-And-Girder Composite Nodes Bearing Monotonic Loading[J].Industrial Construction,2009,39(8):114~117(in Chinese)
    [30]李楠,张季超,楚先锋,等.预制混凝土结构后浇整体式梁柱节点抗震性能试验研究[J].工程力学,2009,26:41~44 Li Nan,Zhang Ji-chao,Chu Xian-feng,et al.Experimental Study on Seismic Behavior of Precast Concrete Beam-Column Sub-assemblage With Cast-in-situ Monolithic Joint[J].Engineering Mechanics,2009,26:41~44(in Chinese)
    [31]邱元,陈庆军.钢管混凝土新型装配式梁柱节点反复加荷载试验研究[J].广州建筑,2002,6:3~7 Qiu Yaun,Chen Qing-jun.Experiment Research on the New Assembly Concrete Filled Steel Tubular BeamColumn Joint Under Cyclic Loading[J].Guangzhou Architecture,2002,6:3~7(in Chinese)
    [32]赵斌,吕西林,刘海峰.预制高强混凝土结构后浇整体式梁柱组合件抗震性能试验研究[J].建筑结构学报,2004,25(6):22~28 Zhao Bin,Lv Xin-lin,Liu Hai-feng.Experimental Study on Seismic Behavior of Precast Concrete Beam-Column Subassemblage with Cast-in-situ Monolithic Joint[J].Journal of Building Structures,2004,25(6):22~28(in Chinese)
    [33]赵斌,吕西林,刘丽珍.全装配式预制混凝土结构梁柱组合件抗震性能试验研究[J].地震工程与工程振动,2005,25(1):81~87 Zhao Bin,Lv Xi-lin,Liu Li-zhen.Experimental Study on Seismic Behavior of Precast Concrete Beam-column Subassemblage with Fully Assembled Joint[J].Earthquake Engineering and Engineering Vibration,2005,25(1):81~87(in Chinese)
    [34]董挺峰,李振宝,周锡元,等.无黏结预应力装配式框架内节点抗震性能研究[J].北京工业大学学报,2006,32(2):144~154 Dong Ting-feng,Li Zhen-bao,Zhou Xi-yuan,et al.Experimental Study on Seismic Performances of Precast Prestressed Concrete Beam-to-column Connections with Unbonded Tendons[J].Journal of Beijing University of Technology,2006,32(2):144~154(in Chinese)
    [35]李振宝,董挺峰,闫维明,等.混合连接装配式框架内节点抗震性能研究[J].北京工业大学学报,2006,32(10):898~900 Li Zhen-bao,Dong Ting-feng,Yan Wei-ming,et all.Study on Seismic Performances of Hybrid Precast Concrete Beam-to-column Connections[J].Journal of Beijing University of Technology,2006,32(10):898~900(in Chinese)
    [36]王晓菡,严心池,秦一如.装配式预应力混凝土结构梁柱组合件抗震性能试验研究[J].工业建筑,2010,40(5):33~38 Wang Xiao-han,Yan Xin-chi,Qin Yi-ru.Experimental Study on Seismic Behavior of Prestressed Precast Concrete Beam-column Assemblies[J].Industrial Construction,2010,40(5):33~38(in Chinese)
    [37]庞瑞,梁书亭,朱筱俊.RC框架结构中新型预制装配式楼盖面内变形分析[J].东南大学学报,2009,39:186~191 Pang Rui,Liang Shu-ting,Zhu Xiao-jun.In-plane Deformation Analysis of New-type Precast Assembly Diaphragms in RC Frame Structures[J].Journal of Southeast University(Natural Science Edition),2009,39:186~191(in Chinese)
    [38]张大长,支正东,卢中强,等.外壳预制核心现浇装配式RC柱抗震性能的试验研究[J].工程力学,2009,26(8):131~142 Zhang Da-chang,Zhi Zheng-dong,Lu Zhong-qiang,et al.Experimental Studies on Aseismic Performance of Assembly RC Columns with Precast External Shell and Cast-in-place Core Concrete[J].Engineering Mechanics,2009,26(8):131~142(in Chinese)
    [39]蔡建国,冯健,王赞,等.预制预应力混凝土装配整体式框架抗震性能研究[J].中山大学学报,2009,48(2):136~140 Cai Jian-guo,Feng Jian,Wang Zan,Zhu Hong-jin.Seismic Behavior of Frame Comprised of Precast Prestressed Concrete Components[J].Acta Scientiarum Naturalium Universitatis Sunyatseni,2009,48(2):136~140(in Chinese)
    [40]窦祖融,孙仁范.外挂预制钢筋混凝土墙板框架结构计算分析[J].工程抗震与加固改造,2010,32(4):65~69 Dou Zu-rong,Sun Ren-fan.Analysis of Frame Structure with Precast Reinforced Concrete Wall Panel[J].Earthquake Resistant Engineering and Retrofitting,2010,32(4):65~69(in Chinese)
    [41]闫维明,王文明,陈适才.装配式预制混凝土梁-柱-叠合板边节点抗震性能试验研究[J].土木工程学报,2010,43(12):56~61 Yan Wei-ming,Wang Wen-ming,Chen Shi-cai.Experimental Study of the Seismic Behavior of Precast Concrete Layered Slab and Beam to Column Exterior Joints[J].China Civil Engineering Journal,2010,43(12):56~61(in Chinese)
    [42]姜洪斌,张海顺,刘文清,等.预制混凝土结构插入式预留孔灌浆钢筋锚固性能[J].哈尔滨工业大学学报,2011,43(4):28~31 Jiang Hong-bin,Zhang Hai-shun,Liu Wen-qing,Yan Hong-ying.Experimental Study on Plug-in Filling Hole for Steel Bar Anchorage of the PC Structure[J].Journal of Harbin Institute of Technology,2011,43(4):28~31(in Chinese)
    [43]徐远征,柳炳康,欧国浩,等.低周反复荷载下预压装配式预应力混凝土框架抗震性能试验研究[J].合肥工业大学学报,2006,29(1):84~87 Xu Yuan-zheng,Liu Bing-kang,Ou Guo-hao,Chen Guo-lin.Experimental Research on Seismic Performance of a Prestressed Concrete Frame with Beam-column Subassemblages under Low Reversed Cyclic Loading[J].Journal of Hefei University of Technology(Natural Science),2006,29(1):84~87(in Chinese)
    [44]杨晓波,柳炳康,黄慎江,等.二层二跨预压装配式混凝土框架节点的抗震性能研究[J].合肥工业大学学报(自然科学版),2010,32(12):1830~1834 Yang Xiao-bo,Liu Bing-kang,Huang Shen-jiang,Song Man-rong.Research on Seismic Behavior of Two-storey and Double-span Pre-stressed Fabricated Concrete Frame Joints[J].Journal of Hefei University of Technology(Natural Science),2010,32(12):1830~1834(in Chinese)
    [45]昂正文,柳炳康,宋满荣,等.预压装配式预应力混凝土框架梁端延性及耗能能力[J].合肥工业大学学报,2010,33(12):1824~1829 Ang Zheng-wen,Liu Bing-kang,Song Man-rong,Zhou an,Chen Li-hua.Behavior of Ductility and EnergyDissipation at Beam-end of Pre-stressed Fabricated PC Frame[J].Journal of Hefei University of Technology,2010,33(12):1824~1829(in Chinese)
    [46]范力,吕西林,赵斌,等.装配式预制混凝土框架结构拟动力试验研究[J].地震工程与工程振动,2007,27(6):97~105 Fan Li,Lv Xi-lin,Zhao Bin,Zhang Ji-cheng.Pseudodynamic Test on Jointed Precast Concrete Frame Structures[J].Journal of Earthquake Engineering and Engineering Vibration,2007,27(6):97~105(in Chinese)
    [47]吕西林,范力,赵斌.装配式预制混凝土框架结构缩尺模型拟动力试验研究[J].建筑结构学报,2008,29(4):58~65 Lv Xi-lin,Fan Li,Zhao Bin.Pseudodynamic Test on a Reduced Scale Jointed Precast Concrete Frame Structure[J].Journal of Building Structures,2008,29(4):58~65(in Chinese)
    [48]翁大根,王姝,任晓崧,等.消能减震加固措施在多层装配式框架中的应用[J].四川建筑科学研究,2007,33:31~36 Weng Da-gen,Wang Shu,Ren Xiao-song,Lv Xi-lin.Application of Energy Dissipation Technology in Prefabricated Reinforced Concrete Frame for Seismic Retrofit[J].Sichuan Building Science,2007,33:31~36(in Chinese)
    [49]韩建强,李振宝,宋佳,等.预应力装配加固混凝土框架结构抗震性能研究[J].工业建筑,2010,40(5):47~50 Han Jian-qiang,Li Zhen-bao,Song Jia,Liu Chunyang.Study on Seismic Performance of Precast Prestressed Reinforced Concrete Frame Structure[J].Industrial Construction,2010,40(5):47~50(in Chinese)
    [50]杨锦怀.混凝土预铸构件之应用及开发[R].中华民国结构工程学会,1995:71~82 Yang Jin-huai.Application and Research of Precast Concrete Component[R].China Taiwan Structure Engineering,1995:71~82(in Chinese)
    [51]Kim S Elliottgf.Multi-story Precast Concrete Framed Structures[J].Black Well Science Ltd.,London,1999
    [52]Englekirk R E.Design-Construction of the Paramount:A 39-Story Precast Prestressed Concrete Apartment Building[J].PCI Journal,2002,47(4):56~71

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心