高面板堆石坝面板应力分析及抗挤压破坏措施
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
多座已建高面板堆石坝在运行期或遭遇地震时面板发生了挤压破坏现象。本文采用三维静、动力有限元方法,分析了高面板堆石坝面板的坝轴向应力分布规律,研究了竖缝压缩模量对面板挤压应力的影响。分析表明:满蓄时由于水压力的作用,堆石体对面板产生指向河谷的摩擦力,因此面板的坝轴向应力以压应力为主,最大值发生在河谷中部,面板两岸坝肩局部存在较小的拉应力;地震后大坝发生整体沉陷,导致河谷中央坝顶区域面板的坝轴向压应力最大。随着坝高的增加,运行期和地震期面板的坝轴向压应力均逐渐增大。将河谷中央面板主要受压区的竖缝采用压缩模量较低的填充材料后,能有效减轻面板的坝轴向压应力。
Extruding rupture of face slabs occurred on some of the built high concrete-faced rock-fill dams(CFRD).In this paper,a three-dimensional(3-D) static and dynamic finite element(FE) method is used to analyze the axial stresses of CFRD face slabs,and the influence of compressive modulus of vertical construction joints on axial compressive stress is studied.The analysis shows that water pressure-caused friction force of face slabs points to the valley and it produces compressive stresses in most parts of face slabs.Hence the compressive stress that has a peak value at the center of valley area,dominates the dam-axial stress,and small tensile stress occurs only locally around the dam abutments.If earthquakes occur,an overall subsidence of the dam causes a significant increase in the peak compressive stress,and shifts its location to the dam crest around the central valley.The compressive stress of face slabs gradually increases as the dam height increases.Thus an effective method of reducing the axial compressive stress is the use of filling material of lower compression modulus for the vertical construction joints in the central valley region.
引文
[1]杨启贵,常晓林,周创兵,等.水布垭高面板堆石坝变形控制方法研究[J].岩土力学,2010,31(S2):247~253.YANG Qigui,CHANG Xiaolin,ZHOU Chuangbing,et al.Study of dam deformation control method for Shuibuya high concrete faced rockfill dam[J].Rock and Soil Mechanics,2010,31(S2):247~253.(in Chinese)
    [2]宋文晶,伍星,高莲士,等.三板溪混凝土面板堆石坝变形及应力分析[J].水力发电学报,2006,25(6):34~38.SONG Wenjing,WU Xing,GAO Lianshi,et al.Deformation and stress analysis of Sanbanxi concrete faced rockfill dam[J].Journal of Hydroelectric Engneering,2006,25(6):34~38.(in Chinese)
    [3]孙陶,高希章,杨建.紫坪铺混凝土面板堆石坝应力-应变分析[J].岩土力学,2006,27(2):247~251.SUN Tao,GAO Xizhang,YANG Jian.Stress-strain anlaysis of Zipingpu concrete faced rockfill dam[J].Rock and Soil Mechanics,2006,27(2):247~251.(in Chinese)
    [4]徐泽平,郭晨.巴西坎泼斯诺沃斯面板堆石坝的经验和教训[J].中国水利水电科学研究院学报,2007,5(3):233~240.XU Zeping,GUO Chen.Experience and lessons from Campos Novos CFRD in Brazil[J].Journal of IWHR,2007,5(3):233~240.(in Chinese)
    [5]魏寿松.天生桥一级大坝面板竖缝的挤压破损原因初探[J].云南水力发电,2004,20(1):56~58.WEI Shousong.Reason for compression damage of vertical joint in Tianshengqiao CFRD[J].Yunnan Water Power,2004,20(1):56~58.(in Chinese)
    [6]中国水力发电工程学会混凝土面板堆石坝专业委员会.混凝土面板堆石坝安全监测技术实践与进展[M].北京:中国水利水电出版社,2010,1~20.Chinese Society of Hydroelectric Engineering,Professional Committee of Concrete Face Rockfill Dam.Safety monitoring technology practice and progress of Concrete Face Rockfill Dam[M].Beijing:China Waterpower Press,2010,1~20.(in Chinese)
    [7]万里,罗永祥,黄刚,等.马来西亚巴贡混凝土面板堆石坝面板抗挤压破坏措施探讨[J].西北水电,2007,(4):37~40.WAN Li,LUO Yongxiang,HUANG Gang,et al.On anti-extruding failure for Bakun concrete face rockfill dam[M].Northwest Hydropower,2007,(4):37~40.(in Chinese)
    [8]GUAN Zhicheng.Investigation of the5.12Wenchuan Earthquake damages to the Zipingpu Water Control Project and an assessment of its safety state[J].Sci China Ser E-Tech Sci,2009,52(4):820~834.
    [9]陈生水,霍家平,章为民.汶川“5.12”地震对紫坪铺混凝土面板堆石坝的影响及原因分析[J].岩土工程学报,2008,30(6):795~801.CHEN Shengshui,HUO Jiaping,ZHANG Wei-Ming.Analysis of effects of“5.12”Wenchuan Earthquake on Zipingpu Concrete Face Rock-fill Dam[J].Chinese Journal of Geotechnical Engineering,2008,30(6):795~801.(in Chinese)
    [10]邹德高,尤华芳,孔宪京,等.接缝简化模型及参数对面板堆石坝面板应力及接缝位移的影响研究[J].岩石力学与工程学报,2009,28(S1):3257~3263.ZOU Degao,YOU Huafang,KONG Xianjing,et al.Research on joint simplified model and effects of joint parameters on panel stress and joint displacements of faced rockfill dam[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(S1):3257~3263.(in Chinese)
    [11]胡耘,张嘎,程嵩,等.面板堆石坝面板竖缝特性对面板应力变形影响分析[J].岩土力学,2009,30(4):1089~1094.HU Yun,ZHANG Ga,CHENG Song,et al.Effect of vertical joints on stress-deformation behavior of CFRD[J].Rock and Soil Mechanics,2009,30(4):1089~1094.(in Chinese)
    [12]马立秋,张嘎,程嵩,等.面板水平分缝对面板堆石坝应力变形影响分析[J].工程力学,2010,(10):145~149.MA Liqiu,ZHANG Ga,CHENG Song,et al.Effect of horizontal joints on stress-deformation[J].Engineering Mechanics,2010,10(10):145~149.(in Chinese)
    [13]邹德高,孔宪京,徐斌.Geotechnical Dynamic Nonlinear Analysis-GEODYNA使用说明[R].大连:大连理工大学土木水利学院工程抗震研究所,2003.ZOU Degao,KONG Xianjing,XU Bin.GEOtechnical DYnamic Nonlinear Analysis-GEODYNA user manual[R].Dalian:The Earthquake Engineering Research Institute,Dalian University of Technology,2003.(in Chinese)
    [14]Duncan J M,Chang C Y.Nonlinear analysis of stress and strain in soils[J].Journal of Soil Mechanics and Foundations Division,ASCE,1970,(9):1929~1653.
    [15]孔宪京,娄树莲,邹德高,等.筑坝堆石料的等效动剪切模量与等效阻尼比[J].水利学报,2001,(8):20~25.KONG Xianjing,LOU Shulian,ZOU Degao,et al.The equivalent dynamic shear modulus and equivalent damping ratio of the rockfill for dam[J].Journal of Hydraulic Engineering,2001,(8):20~25.(in Chinese)
    [16]孟凡伟.沈珠江.残余变形模型的改进及其应用研究[D].大连:大连理工大学硕士学位论文,2007.MENG Fanwei,SHEN Zhujiang.On Improvement and Application of Shen-zhujiang Residual Deformation Model[D].Dalian:Dissertation for the Master Degree in Dalian University of Technology,2007.(in Chinese)
    [17]邹德高,孟凡伟,孔宪京,等.堆石料残余变形特性研究[J].岩土工程学报,2008,30(6):807~812.ZOU Degao,MENG Fanwei,KONG Xianjing,et al.Residual deformation behavior of rock-fill materials[J].Chinese Journal of Geotechnical Engineering,2008,30(6):807~812.(in Chinese)
    [18]CLOUGH G W,DUNCAN J M.Finite element analysis of retaining wall behavior[J].Journal of the Soil Mechanics and Foundation Division,ASCE,1971,97(12):1657~1672.
    [19]大连理工大学工程抗震研究所.双江口水电站心墙坝动力反应分析[R].大连:大连理工大学,2009.The Earthquake Engineering Research Institute,Dalian University of Technology.Dynamic Analysis of core dam of Shuangjiangkou Hydropower Station[R].Dalian:Dalian University of Technology,2009.(in Chinese)
    [20]顾淦臣,沈长松,岑威钧.土石坝地震工程学[M].北京:中国水利水电出版社,2009.GU Ganchen,SHEN Changsong,CEN Weijun.Earthquake engineering for earth-rock dams[M].Beijing:China Water Power Press,2009.(in Chinese)
    [21]大连理工大学工程抗震研究所.猴子岩水电站工程混凝土面板堆石坝静、动力计算分析[R].大连:大连理工大学,2008.The Earthquake Engineering Research Institute,Dalian University of Technology.Static and dynamic analysis of concrete face rock-fill dam of Houziyan Hydropower Station[R].Dalian:Dalian University of Technology,2008.(in Chinese)