坚硬顶板预裂对底板突水影响的研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对演马庄矿突水原因复杂多变的现状,采用岩层运动和矿山压力理论,运用数值计算的方法,结合在演马庄矿25081和27111工作面的实际模拟,对比了不断顶、断顶条件下顶底板超前应力的模拟状态。研究结果表明,对坚硬顶板进行提前断顶处理,能够有效减少底板的破坏深度,从而减轻突水危险性。证明了断顶后大幅度降低了老顶初次来压期间的出水量,起到了较好的防止突水的效果。
In connection with the cause of water bursting of complex and changeful situation in Yanmazhuang coal mine,this paper used the movement of strata and ground pressure theory,combined athe actual simulation of 25081 and 27111 working faces,and compared the simulation state of advanced crustal stress in the condition of keeping and broken tops.Research results show that,the hard roof for early broken roof treatment,can effectively reduce the broken depth of the floor,thereby reducing the risk of water inrush,broken top that greatly reduces the initial pressure of the main roof during periods of water,has good preventing water burst effect.
引文
[1]乔杰鹏,赵妍,乔双鹏.浅析煤矿采煤工作面顶板事故原因及其防治措施研究[J].中小企业管理与科技(下旬刊),2011(10).
    [2]钱明高,繆协兴,徐家林等.岩层控制的关键层理论[M].北京:中国矿业大学出版社,2000.
    [3]彭素萍,王金安.承压水体上安全采煤[M].北京:煤炭工业出版社,2001.
    [4]胡东祥.济宁煤田巨厚覆岩离层突水机理初探[J].能源技术与管理.2010(1):94-96.
    [5]尹会永.潘西煤矿煤层底板突水机理及预测预报研究[D].山东:山东科技大学,2005.
    [6]韩立亮,王谦源,李光辉.青岛地铁上覆岩层岩体力学参数研究[J].价值工程,2010(13).
    [7]于克君.煤层顶板“两带”高度的微地震监测技术[J].煤田地质与勘探.2002,30(1):47-51.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心