严寒、高震、深覆盖层混凝土面板坝关键技术研究综述
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
自20世纪90年代以来,新疆的水库建设已从平原水库转入山区水库建设,以混凝土面板砂砾石坝为主要的当地材料坝,得到了迅速发展。新疆于20世纪70年代末,开始引进混凝土面板坝筑坝技术,采用天然砂砾石填筑百米级高坝,是区别于一般面板堆石坝的主要特点。针对严寒地区、深覆盖层、高地震区等不良环境地质条件,全面总结基础上系统地建立了混凝土面板砂砾石坝筑坝关键技术体系,阐述了在抗震结构设计、坝体变形控制、坝体渗流控制等方面取得的创新突破,研究指出施工工艺的不断改进,大型机械压实功能的不断增强,为该坝型推广应用和安全性能提高,提供了重要的技术保障。对于提高混凝土面板砂砾石坝建设和运行管理水平具有重要意义。
Since the 1990s,Xinjiang's reservoir construction has changed from plain reservoirs to mountainous ones,and the concrete face sand gravel dam as the main dam by use of local materials has been rapidly developed.In the late 1970s,Xinjiang began to introduce the construction technology of concrete face rockfill dam and adopted the natural sand gravel to build dams with a height of over 100 meters,which are the main characteristics different from those of the common face rockfill dams.Aiming at hiemal zone,unfavorable environmental geology conditions such as deep overburden and high seismic zone,a key technical system for concrete face sand gravel dams is established and summarized.The innovative breakthroughs in the aspects of aseismatic structural design,deformation control and seepage control of dam body are achieved.This study indicates that the increasing improvement of construction technology and the continuous enhancement of compaction function of large machines provide important technical supports for the safety performance and popularizing application of this dam type.So it has great significance for improving the construction and operation level of concrete face sand gravel dams.
引文
[1]潘家铮,何璟.中国大坝50年[M].北京:中国水利水电出版社,2000.9.(PAN Jia-zheng,HE Jing.Large dams inChina(a fifty year review)[M].Beijing:China Water PowerPress,2000.(in Chinese))
    [2]顾淦臣,束一鸣,沈长松.土石坝工程经验与创新[M].北京:中国水利水电出版社,2004.(GU Gan-chen,SUYi-ming,SHEN Chang-song.Experiences and innovations ofearth-rockfill dam engineering[M].Beijing:China WaterPower Press,2004.(in Chinese))
    [3]王柏乐.中国当代土石坝工程[M].北京:中国水利水电出版社,2004.(WANG Bo-le.Modern earth-rockfill dams inChina[M].Beijing:China Water Power Press,2004.(inChinese))
    [4]邓铭江,于海鸣,李湘权,等.新疆大坝建设进展[J].水利水电技术,2010,41(7):29-35.(DENG Ming-jiang,YUHai-ming,LI Xiang-quan,et al.Dam construction progress inXinjiang[J].Water Resources and Hydropower Engineering,2010,41(7):29-35.(in Chinese))
    [5]邓铭江,于海鸣,李湘权.新疆坝工技术进展[J].岩土工程学报,2010,32(11):1678-1687.(DENG Ming-jiang,YUHai-ming,LI Xiang-quan.Advances of dam constructiontechniques in Xinjiang[J].Chinese Journal of GeotechnicalEngineering,2010,32(11):1678-1687.(in Chinese))
    [6]邓铭江,于海鸣.新疆坝工建设[M].北京:中国水利水电出版社,2011.(DENG Ming-jiang,YU Hai-ming.Damconstruction in Xinjiang[M].Beijing:China Water PowerPress,2011.(in Chinese))
    [7]蒋国澄,傅志安,凤家骥.混凝土面板坝工程[M].武汉:湖北科学技术出版社,1997.(JIANG Gou-cheng,FU Zhi-an,FENG Jia-ji.Concrete face rockfill dam project[M].Wuhan:Hubei Science and Technology Press,1997.(in Chinese))
    [8]陈生水,凤家骥,袁辉.砂砾石面板坝关键技术研究[J].岩土工程学报,2004,26(1):16-20.(CHEN Sheng-shui,FENG Jia-ji,YUAN Hui.Research on key techniques offacing sandy gravel dam[J].Chinese Journal of GeotechnicalEngineering,2004,26(1):16-20.(in Chinese))
    [9]凤家骥,张国安.柯柯亚面板坝的防渗设计与原型观测[J].水力发电,1989,15(3):17-20.(FENG Jia-ji,ZHANGGou-an.Seepage control design and prototype observationfor Kekeya face rockfill dam[J].Water Power,1989,15(3):17-20.(in Chinese))
    [10]韦春侠,陈洪武,王占巨.察汗乌苏水电站混凝土面板砂砾石坝关键技术[J].葛洲坝集团科技,2009,90(2):15-18.(WEI Chun-xia,CHEN Hong-wu,WANG Zhang-ju.Keytechnology of the CF sand and gravel rockfill dam of theChahanwusu Hydropower Station[J].Gezhouba groupScience&Technology,2009,90(2):15-18.(in Chinese))
    [11]谢定松,刘杰,魏迎奇.高面板堆石坝渗流控制关键技术问题探讨[J].长江科学院院报,2009,26(10):118-121,125.(XIE Ding-song,LIU Jie,WEI Ying-qi.Key technologyproblems of seepage control for building high concrete facerockfill dam[J].Journal of Yangtze River Scientific ResearchInstitute,2009,26(10):118-121,125.(in Chinese))
    [12]汪洋,曲苓.乌鲁瓦提砂砾石面板高坝渗流控制的设计[J].水利水电技术,2000,31(1):66-70.(WANG Yang,QU Ling.Seepage control design for Wuluwati dam[J].WaterResources and Hydropower Engineering,2000,31(1):66-70.(in Chinese))
    [13]白建军,王钧.乌鲁瓦提混凝土面板砂砾石堆石坝坝料填筑渗透性浅析[J].水利水电技术,2003,34(12):36-39.(BAI Jian-jun,WANG Jun.Permeability analysis onembankment material of Wuluwati concrete face rockfilldam[J].Water Resources and Hydropower Engineering,2003,34(12):36-39.(in Chinese))
    [14]曲苓,汪洋,余春海.乌鲁瓦提混凝土面板堆石(砂砾石)坝体排水系统设计[J].新疆水利水电,1994(2):6-10.(QU Ling,WANG Yang,YU Chun-hai.Design ofdrainage for concrete face rock fill dam of WuluwatiHydropower Station[J].Xinjiang Water Conservancy andHydropower,1994(2):6-10.(in Chinese))
    [15]彭卫军,罗松涛.吉林台一级水电站混凝土面板砂砾一堆石坝设计与施工[J].水力发电,2006,32(6):23-25.(PENG Wei-jun,LUO Song-tao.The design and constructionof the CF sand and gravel rockfill dam of the Jilintai-Ⅰhydropower station[J].Water Power,2006,32(6):23-25.(inChinese))
    [16]杨长征,王钧,洪迎东,等.乌鲁瓦提水利枢纽工程混凝土面板砂砾石堆石坝坝体填筑施工技术[J].水利水电技术,2003,34(12):9-13.(YANG Chang-zheng,WANG Jun,HONG Ying-dong.Construction technique of filling forWuluwati concrete face rockfill dam[J].Water Resources andHydropower Engineering,2003,34(12):9-13.(in Chinese))
    [17]杨昭,席福来.乌鲁瓦提水利枢纽工程混凝土面板堆石坝筑坝料工程特性研究[J].水利水电技术,2003,34(12):31-33.(YANG Zhao,XI Fu-lai.Characteristics ofembankment material of Wuluwati concrete face rockfilldam[J].Water Resources and Hydropower Engineering,2003,34(12):31-33.(in Chinese))
    [18]彭汉军,郭霞辉.吉林台混凝土面板砂砾-堆石坝填筑中的质量监理[J].水力发电,2006,32(6):34-39.(PENGHan-jun,GUO Xia-hun.Quality inspect of the filling of theJilintai hydropower station slab and gravel rock-fill dam[J].Water Power,2006,32(6):34-39.(in Chinese))
    [19]唐懿.吉林台一级水电站面板堆石坝混凝土面板施工[J].水力发电,2006,32(6):40-43.(TANG Yi.Construction of concrete faced rock-fill dam of Jilintai-hydropower station[J].Water Power,2006,32(6):40-43.(inChinese))
    [20]顾淦臣.土石坝地震工程[M].南京:河海大学出版社,1989.(GU Gan-chen.Earthquake engineering for earthrockdams[M].Nanjing:Hohai University Press,1989.(inChinese))
    [21]汪洋,曲苓.乌鲁瓦提混凝土面板堆石(砂砾石)坝设计[J].新疆水利水电,1995(1):19-26.(WANG Yang,QU Ling.Design of concrete-face rock-fill dam in WuluwatiHydropower Station[J].Xinjiang Water Conservancy andHydropower,1995(1):19-26.(in Chinese))
    [22]彭卫军,范金勇.吉林台一级水电站混凝土面板砂砾石一堆石坝坝体抗震设计[J].水力发电,2006,32(6):26-28.(PENG Wei-jun,FAN Jin-yong.The seismic design of the CFdam of Jilintai-Ⅰhydropower station[J].Water Power,2006,32(6):26-28.(in Chinese))
    [23]大连理工大学.吉林台混凝土面板砂砾一堆石坝坝材试验与三维有限元静动力分析[R].大连:大连理工大学,2001.(Dalian University of Technology.Jilintai concrete facerockfill dam material test and gravel a 3d finite element staticand dynamic analysis[R].Dalian:Dalian University ofTechnology,2001.(in Chinese))
    [24]唐懿,张开军.高寒高震地区混凝土面板堆石坝工程的特点[J].水电站设计,2006,22(1):10-13.(TANG Yi,ZHANG Kai-jun.Characteristics of concrete face rock-filldam in high cold&seismic area[J].Design of HydroelectricPower Station,2006,22(1):10-13.(in Chinese))
    [25]郑远建.吉林台一级水电站混凝土面板砂砾堆石坝面板止水施工工艺[J].水利水电技术,2006,37(6):57-59.(ZHENG Yuan-jian.Construction technology of waterstop ofthe face slab of the concrete face rock-fill dam of Jilintai-Ⅰhydropower station[J].Water Resources and HydropowerEngineering,2006,37(6):57-59.(in Chinese))
    [26]贾金生,郝巨涛,陈肖雷.混凝土面板坝止水带设计与柔性填料[J].水力发电,2002,28(4):23-26.(JIA Jing-sheng,HAO Ju-tao,CHENG Xiao-lei.Design principles ofwatertight strip for high reinforced concrete face dam and thecontrol indexes of flexible filling material performances[J].Water Power,2002,28(4):23-26.(in Chinese))
    [27]鲁一晖,郝巨涛,赵波,等.吉林台电站混凝土面板坝周边缝自愈型止水结构[J].水力发电,2005,31(1):42-54.(LU Yi-hui,HAO Ju-tao,ZHAO Bo,et al.Research onself-healing waterstop of perimeter joint of Jilintai-I CFRD[J].Water Power,2005,31(1):42-54.(in Chinese))
    [28]钟根波.梅溪水库混凝土防渗墙的设计与施工[J].浙江水利科技,2000(5):56-58.(ZHONG Geng-bo.Design andconstruction of concrete impervious wall for Meiqireservoir[J].Zhejiang Hydrotechnics,2000(5):56-58.(inChinese))
    [29]李国英,沈珠江,赵魁芝.梅溪水库面板堆石坝原型观测资料反馈分析及大坝变形预报模型[J].水利水运科学研究,1999(4):329-337.(LI Gou-ying,SHEN Zhu-jiang,ZHAOKui-zhi.Back analysis of observation data of Meixi CFRDand study on prediction model for dam deformation[J].Hydro-science and Engineering,1999(4):329-337.(inChinese))
    [30]朱孟业.建造在深厚覆盖层上的梁辉水库面板堆石坝[J].浙江水利科技,1997(3):34-35.(ZHU Men-ye.LianghuiCFRD built on thick alluvium deposits[J].ZhejiangHydrotechnics,1997(3):34-35.(in Chinese))
    [31]孙志峰.汉坪咀水电站坝基防渗墙施工综述[J].东北水利水电,2004,22(12):230-235.(SUN Zhi-feng.Constructionof dam foundation impervious wall in Hanpengzuihydropower station[J].Water Resources&Hydropower ofNortheast China,2004,22(12):230-235.(in Chinese))
    [32]聂广明,何雷霆.汉坪嘴水电站大坝“5.12”地震后的应急检查概况[J].大坝与安全,2008(3):6-8,14.(NIEGuang-ming,HE Lei-ting.Introduction on emergencyinspection of Hanpingzui dam 5.12 earthquake[J].Large Dam&Safety,2008(3):6-8,14.(in Chinese))
    [33]赵魁芝,李国英,米占宽.汉坪咀混凝土面板堆石坝防渗体系设计方案优选[J].水利水运工程学报,2004(2):45-50.(ZHAO Kui-zhi,LI Guo-ying,MI Zhan-kuan.Designoptimization for impervious system of Hanpingzui rockfilldam with concrete facing slab[J].Hydro-science andEngineering,2004(2):45-50.(in Chinese))
    [34]冯业林,李云,李娟,等.趾板置于覆盖层的那兰水电站面板砂砾石坝设计研究[J].水力发电,2006,32(11):45-47.(FENG Ye-ling,LI Yun,LI Juan,et al.Concrete facegravelfill and rockfill dam of Nalan hydropower station ondeep alluvium[J].Water power,2006,32(11):45-47.(inChinese))
    [35]刘娟,马耀.深厚覆盖层上高面板坝防渗体系设计研究[J].水力发电,2009,34(9):81-83.(LIU Juan,MA Yao.Study on the design of seepage control system for high facerockfill dam on deep overburden layer[J].Water Power,2009,34(9):81-83.(in Chinese))
    [36]吴利平.九甸峡水利枢纽工程筑坝材料特性研究[J].甘肃水利水电技术,2010,46(3):26-28.(WU Li-ping.Study oncharacteristic of material of Jiudianxia Water Project[J].Gansu Water Conservancy and Hydnopower Technology,2010,46(3):26-28.(in Chinese))
    [37]刘娜.土石坝三维非线性有限元分析及防渗墙应力状态研究[D].西安:西安理工大学,2007:81-95.(LIU Na.Three-dimension nonlinear analysis of earth-rock dam andthe stress character study of the diaphragm wall in dams[D].Xi'an:Xi'an University of Technology,2007:81-95.(inChinese))
    [38]孙大伟,邓海峰,田斌,等.大河水电站深覆盖层上面板堆石坝变形和应力性状分析[J].岩土工程学报,2008,30(3):434-439.(SUN Da-wei,DENG Hai-feng,TIANBing,et al.Deformation and stress analysis of Dahe CFRDbuilt on thick alluvium deposits[J].Chinese Journal ofGeotechnical Engineering,2008,30(3):434-439.(inChinese))
    [39]吴鹏举.铜街子水电站面板坝三向测缝计资料分析[C]//混凝土面板堆石坝国际研讨会论文集.北京,2000:477-481.(WU Peng-ju.Material analysis of triaxial joint meter ofTongjiezi Dam[C]//International Conference Of ConcreteFaced Rockfill Dam,Beijing,2000:477-481.(in Chinese))
    [40]何志涛,邓德生,王兴然.铜街子水电站面板堆石坝有限元计算[J].水电站设计,1994,10(3):74-79.(HE Zhi-tao,DENG De-sheng,WANG Xing-ran.Finite Element Methodfor Tongjiezi dam[J].Design of Hydroelectric Power Station,1994,10(3):74-79.(in Chinese))
    [41]吴何乔,吴波,鲁芳芳.双溪口水库低弹模混凝土防渗墙施工[J].浙江水利科技,2008(1):77-78,81.(WUHe-qiao,WU Bo,LU Fang-fang.The constructiontechnology of low elastic modulus of concrete cutoff wall inShuangxikou reservoir[J].Zhejiang Hydrotechnics,2008(1):77-78,81.(in Chinese))
    [42]唐巨山,丁邦满.横山水库扩建工程混凝土面板堆石坝设计[J].水力发电,2002,28(7):35-37.(TANG Ju-shan,DING Bang-man.Design of concrete face rockfill dam of theexpansion project of Hengshan Reservoir[J].Water Power,2002,28(7):35-37.(in Chinese))
    [43]王汝军,梁谦.老渡口水电站面板堆石坝防渗墙施工[J].湖北水力发电,2009(3):49-52.(WANG Ru-jun,LIANGQian.Construction of impervious wall in CFRD of LaodukouHydropower Station[J].Hubei Water Power,2009(3):49-52.(in Chinese))
    [44]唐新军,凤炜,凤家骥,等.榆树沟水库枢纽工程的设计特点与运行情况[J].新疆农业大学学报,2004,27(2):52-56.(TANG Xin-jun,FENG Wei,FENG Jia-ji,et al.Designcharacter and circulation situation of Yushugou reservoirpivot project[J].Journal of Xinjiang agricultural University,2004,27(2):52-56.(in Chinese))
    [45]刘杰.土石坝渗流控制理论基础及工程经验教训[M].北京:中国水利水电出版社,2006.(LIU Jie.Seepage controlof earth-rock dams theoretical basis,engineering experiencesand lessons[M].Beijing:China Water Power Press,2006.(inChinese))
    [46]刘杰.混凝土面板坝碎石垫层料最佳级配试验研究[J].水利水运工程学报,2001(4):1-5.(LIU Jie.Experimentalstudy of optimum gradation of crushed stone cushion forconcrete-face rockfill dam[J].Hydro-science and Engineering,2001(4):1-5.(in Chinese))
    [47]SL228—98混凝土面板堆石坝设计规范[S].北京:中国水利水电出版社,1999.(SL228—98Concrete face rockfilldam design standard[S].Beijing:China Water Power Press,1999.(in Chinese))