一次采全高综采工作面覆岩冒落带动态发育特征
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以寺河二号井为试验矿井,采用钻孔双栓塞封堵分段注水试验装置与钻孔电视观测系统,探测一次采全高覆岩冒落带发育高度,对裂隙倾角分布特征、数量与宽度、深度与宽度、数量与深度关系进行数字化分析,并就裂隙演变特征进行数值模拟试验。数据分析结果表明:寺河二号井一次采全高综采冒落带发育高度为4.1~4.8 m;随着工作面的推进覆岩裂隙数量直线上升,且以中宽度、小角度裂隙为主;采动过程中裂隙主要聚集在近煤壁区域;覆岩裂隙密度分布曲线呈"蛇"型。
Taking Sihe No.2 mine as the experimental mine,by using the equipment which is sealed two ends by capsules in borehole, affused measurable water between the two capsules and borehole televiewer observation system,overburden caving zone height of mining overall height in one times is monitored and analyzed through the digital relationship of fractures around mining such as change of dip angle,numbers and width,depth and width,numbers and depth. At the same time,similarity model experiment of fracture development character is carried out. The results show that caving zone height changes from 4.1 to 4.8 m. The fractures with small angle and middle width after mining are in the majority. With increase of the mining of working face,the numbers of fractures increase linearly. The fractures cluster region mainly focuses near the coal wall. The fractures density distribution curves of overlying strata like sanke-shapes.
引文
[1]钱鸣高,石平五,许家林.矿山压力与岩层控制[M].北京:中国矿业大学出版社,2010:65–99.(QIAN Minggao,SHI Pingwu,XU Jialin.Mining pressure and strata control[M].Beijing:China Mining University Publishing House,2010:65–99.(in Chinese))
    [2]高保彬,王晓蕾,朱明礼,等.复合顶板高瓦斯厚煤层综放开采“两带”动态发育特征[J].岩石力学与工程学报,2012,31(增1):3 444–3 451.(GAO Baobin,WANG Xiaolei,ZHU Mingli,et al.Dynamic development characteristics of two zones of overburden strata under conditions of compound roof,highly gassy and thick coal seam in full-mechanized topcoal caving faces[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(增1):3 444–3 451.(in Chinese))
    [3]姜岩.采动覆岩离层及其分布规律[J].山东矿业学院学报,1997,16(1):19–22.(JIANG Yan.Mining strata abscission layer and their distribution rule[J].Journal of Shandong Mining Institute,1997,16(1):19–22.(in Chinese))
    [4]王庆照,蒋升,司马俊杰.厚煤层重复采动覆岩破裂发育规律研究[J].山东科技大学学报:自然科学版,2010,29(4):67–82.(WANG Qingzhao,JIANG Sheng,SIMA Junjie.Study on fracturing and development rules of overlying strata under repeated mining in thick coal seam[J].Journal of Shandong University of Science and Technology:Natural Science,2010,29(4):67–82.(in Chinese))
    [5]王福厚.高位钻孔抽放瓦斯冒落带及裂隙带高度确定方法[J].煤炭技术,2008,27(8):75–76.(WANG Fuhou.Determination method of caving and fracture zone height for gas drainage by high level borehole[J].Coal Technology,2008,27(8):75–76.(in Chinese))
    [6]李焕,吕自伟,赵亮,等.高位钻孔瓦斯抽放冒落带与裂隙带高度的测定方法[J].现代矿业,2011,(1):49–51.(LI Huan,LU Ziwei,ZHAO Liang,et al.Determination methods of caving and fractured zone height for gas drainage by high level borehole[J].Modern Mining,2011,(1):49–51.(in Chinese))
    [7]李华奇,刘鹏程.采空区冒落带高度影响因素及分布规律分析[J].煤炭技术,2011,30(8):117–119.(LI Huaqi,LIU Pengcheng.Analysis of influencing factors and distribution regularities of caving zone heights[J].Coal Technology,2011,30(8):117–119.(in Chinese))
    [8]煤炭科学研究总院北京开采研究所.煤矿地表移动与覆岩破坏规律及其应用[M].北京:煤炭工业出版社,1983:130–135.(Branch of Beijing Mining Institute,China Coal Research Institute.Law for ground surface movement and overburden failure in coal mine and its application[M].Beijing:China Coal Industry Publishing House,1983:130–135.(in Chinese))
    [9]国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M].北京:煤炭工业出版社,2000:225–233.(State Coal Industry Bureau.Building,water body,railroad and main mine lanecoal pillar with pressure mining engineering[M].Beijing:China Coal Industry Publishing House,2000:225–233.(in Chinese))
    [10]石金峰,麻凤海,洪加明.综采放顶煤条件下覆岩冒落带,裂缝带高度的探讨[J].矿山测量,1996,(3):41–44.(SHI Jinfeng,MA Fenghai,HONG Jiaming.Under the conditions of fully mechanized caving coal face strata maoladai,fractured zone height[J].Mine Surveying,1996,(3):41–44.(in Chinese))
    [11]张彬,牟义,张俊英,等.瞬变电磁法在导水裂隙带高度探测中的研究应用[J].煤炭工程,2011,(3):44–46.(ZHANG Bin,MU Yi,ZHANG Junying,et al.Transient electromagnetic method in the research and application in the detection of water flowing fractured zone height[J].Coal Project,2011,(3):44–46.(in Chinese))
    [12]李文生,李文,尹尚先.综采一次采全高顶板导水裂缝带发育高度研究[J].煤炭科学技术,2012,40(6):104–107.(LI Wensheng,LI Wen,YIN Shangxian.Study on development height of water flow crack zone in roof above fully mechanized one passing full seam mining face[J].Coal Science and Technology,2012,40(6):104–107.(in Chinese))
    [13]郑军.上覆岩层运动规律的相似模拟试验研究[J].煤炭科技,2011,(1):6–8.(ZHENG Jun.Overburden movement law of similarity simulation test study[J].Coal Science,2011,(1):6–8.(in Chinese))
    [14]张兴民,于克君,席京德,等.微地震技术在煤矿“两带”监测领域的研究与应用[J].煤炭学报,2000,25(6):566–570.(ZHANG Xingmin,YU Kejun,XI Jingde,et al.The research and application of microseismic technology in mine fractured and caving zones monitoring[J].Journal of China Coal Society,2000,25(6):566–570.(in Chinese))
    [15]程学丰,刘盛东,刘登宪.煤层采后围岩破坏规律的声波CT探测[J].煤炭学报,2001,26(2):153–155.(CHENG Xuefeng,LIU Shengdong,LIU Dengxian.Failure law of the sound wave CT detection after mining[J].Journal of China Coal Society,2001,26(2):153–155.(in Chinese))
    [16]王川婴,LAW K Tim.钻孔摄像技术的发展与现状[J].岩石力学与工程学报,2005,24(19):3 440–3 447.(WANG Chuanying,LAW K Tim.Review of borehole camera technology[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(19):3 440–3 447.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心