连体结构弹塑性时程分析的初始内力条件
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以某高层连体结构为工程背景,分析了对连体结构弹塑性时程分析结果影响显著的两个初始条件及其对结构初始内力的影响,通过背景工程弹塑性时程分析结果对比,证实了此类结构以施工过程分析结果作为结构弹塑性时程分析初始条件的必要性,最后针对连体结构提出了减少结构附加内力的措施.
Based on a high-rise con-jointed building structure,we analysed some initial inner-force conditions which have significant influence on the elastic-plastic time-history analysis of con-jointed structure and the significance of their influence on the initial inner-force of a structure. The study then verified the necessity,in this kind of structure,to put analysis results of construction progress as initial condition of elastic-plastic time-history analysis through the comparison of analytical results of background project. Finally we put forward some practical measures to minimize additional inner force of large-span con-jointed structure.
引文
[1]中华人民共和国住房和城乡建设部.GB 500011—2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
    [2]中华人民共和国住房和城乡建设部.JGJ 3—2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2010.
    [3]汤少强.高层连体结构变形调控施工技术研究[J].硅谷,2008(3)33-41.
    [4]周巧伶.罕遇地震作用下柔性连接连体结构的弹塑性地震响应分析[D].南昌:南昌大学,2012.
    [5]蔡晓鸿,孙书森,刘凤鸣,等.当代MOMA工程高层多塔楼高位悬挑及连体结构设计与施工关键技术研究[J].工程质量,2009,27(11)86-92.
    [6]王红军,张达生,杨竞.超高层连体结构弹塑性时程分析[J].工程抗震与加固改造,2014,36(1)10-17.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心