鲤鱼潭大坝坝料动力参数反演
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
采用现行的室内外试验方法确定的土石料动力参数是否符合实际是人们关心的问题之一。提出了一种基于坝体加速度峰值和反应谱的土石坝坝料动力参数反演方法。利用鲤鱼潭大坝在集集地震中的加速度响应信息,反演了坝料的动力参数。结果表明,该方法是可行的,计算精度可满足实际工程要求。研究表明室内动三轴试验得到的坝料最大动剪模量系数K的值偏小,应予以修正。
Whether or not the dynamic parameters of earth rockfill determined in the laboratory or in situ are corresponding to the reality is a matter of concern. A back-analysis approach for the dynamic parameters of earth-rockfill based on response spectra and acceleration peak is presented. According to the acceleration response information of Liyutan Dam in the Chi-Chi earthquake, and by applying the back-calculation approach, the dynamic parameters are obtained. The results demonstrate that the proposed method is feasible, and the computational accuracy basically satisfies the practical engineering requirements. The dynamic shear modulus coefficient K of the dam materials obtained from the laboratory dynamic triaxial tests is small and should be revised.
引文
[1]沈珠江.鲁布革心墙堆石坝变形的反馈分析[J].岩土工程学报,1994,16(3):1–13.(SHEN Zhu-jiiang.Back analysis deformation of Lubuge earth core rockfill dam[J].Chinese Journal of Geotechnical Engineering,1994,16(3):1–13.(in Chinese))
    [2]张社荣,何辉.改进的遗传算法在堆石体参数反演中的应用[J].岩土力学,2005,26(2):182–186.(ZHANG She-rong,HE Hui.Application of improved genetic algorithm to back analyzing parameters of rockfill[J].Rock and Soil Mechenics,2005,26(2):182–186.(in Chinese))
    [3]张丙印,袁会娜,孙逊.糯扎渡高心墙堆石坝心墙砾石土料变形参数反演分析[J].水力发电学报,2005,24(3):18–23.(ZHANG Bing-yin,YUAN Hui-na,SUN Xun.The back-analysis of deformation parameters of core gravelly soil of the Nuozhadu high rock-fill dam[J].Journal of Hydroelectric Engineering,2005,24(3):18–23.(in Chinese))
    [4]张丙印,袁会娜,李全明.基于神经网络和演化算法的土石坝位移反演分析[J].岩土力学,2005,26(4):547–552.(ZHANG Bing-yin,YUAN Hui-na,LI Quan-ming.Displacement back analysis of embankment dam based on neural network and evolutionary algorithm[J].Rock and Soil Mechanics,2005,26(4):547–552.(in Chinese))
    [5]田明俊,周晶.基于蚁群算法的土石坝土体参数反演[J].岩石力学与工程学报,2005,25(8):1411–1416.(TIAN Ming-jun,ZHOU Jing.Inversing soil mechanical parameters of embankment dam using ant colony algorithm[J].Chinese Journal of Rock Mechanics and Engineering,2005,25(8):1411–1416.(in Chinese))
    [6]田明俊,周晶.土石坝土体参数反演的一种新方法[J].土木工程学报,2005,38(8):118–122.(TIAN Ming-jun,ZHOU Jing.An inverse analysis of embankment dam parameters by using a virtual displacementmethod[J].China Civil Engineering Journal,2005,38(8):118–122.(in Chinese))
    [7]李金凤,杨启贵,徐卫亚.基于改进粒子群算法CHPSO-DS的面板坝堆石体力学参数反演[J].岩石力学与工程学报,2008,27(6):1229–1235.(LI Jin-feng,YANG Qi-gui,XU Wei-ya.Back analyzing mechanical parameters of rockfill based on modified particle swarm optimization CHPSO-DS[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(6):1229–1235.(in Chinese))
    [8]朱晟,张美英,戴会超.土石坝沥青混凝土心墙力学参数反演分析[J].岩土力学,2009,30(3):635–639.(ZHU Sheng,ZHANG Mei-ying,DAI Hui-chao.Back analysis of mechanical parameters for asphalt-concrete core earth-rock dam[J].Rock and Soil Mechanics,2009,30(3):635–639.(in Chinese))
    [9]朱晟,梁现培,冯树荣.基于现场大型承载试验的原级配筑坝堆石料力学参数反演研究[J].岩土工程学报,2009,31(7):1138–1143.(ZHU Sheng,LIANG Xian-pei,FENG Shu-rong.Back analysis of mechanical parameters of naturally graded rockfill materials based on large-scale loading plate tests[J].Chinese Journal of Geotechnical Engineering,2009,31(7):1138–1143.(in Chinese))
    [10]朱晟.水布垭面板堆石坝施工与运行性状反演研究[J].岩石力学与工程学报,2011,30(增刊2):3689–3695.(ZHU Sheng.Back analysis on construction and operation properties of shuibuya concrete face rockfill dam[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(S2):3689–3695.(in Chinese))
    [11]江沛华,魏松,汪莲,等.改进复合形法及其在堆石坝参数反演中的应用[J].水力发电学报,2011,30(4):168–174.(JIANG Pei-hua,WEI Song,WANG Lian,et al.Modified complex method and application to parameters back-analysis for rock-fill dam[J].Journal of Hydroelectric Engineering,2011,30(4):168–174.(in Chinese))
    [12]董威信,袁会娜,徐文杰,等.糯扎渡高心墙堆石坝模型参数动态反演分析[J].水力发电学报,2012,31(5):203–208.(DONG Wei-xin,YUAN Hui-na,XU Wen-jie,et al.Dynamic back-analysis of material parameters of Nuozhadu high earth-rock-fill dam[J].Journal of Hydroelectric Engineering,2012,31(5):203–208.(in Chinese))
    [13]马刚,常晓林,周伟,等.高堆石坝瞬变—流变参数三维全过程联合反演方法及变形预测[J].岩土力学,2012,33(6):1889–1895.(MA Gang,CHANG Xiao-lin,ZHOU Wei,et al.Integrated inversion of instantaneous and rheological parameters and deformation prediction of high rockfill dam[J].Rock and Soil Mechanics,2012,33(6):1889–1895.(in Chinese))
    [14]何敏,李宁,张西前,等.黑河黏土心墙土石坝分期位移反分析[J].岩土力学,2013,34(1):259–265.(HE Min,LI Ning,ZHANG Xi-qian,et al.Back analysis of displacements of Heihe clay core rockfill dam at different stages[J].Rock and Soil Mechanics,2013,34(1):259–265.(in Chinese))
    [15]YU Yu-zhen,ZHANG Bing-yin,YUAN Hui-na.An intelligent displacement back-analysis method for earth-rockfill dams[J].Computers and Geotechnics,2007,34(4):423–434.
    [16]ZHOU Wei,HUA Jun-jie,CHANG Xiao-lin,et al.Settlement analysis of the Shuibuya concrete-face rockfill dam[J].Computers and Geotechnics,2011,38(2):269–280.
    [17]ZHENG Dong-jian,CHENG Lin,BAO Teng-fei,et al.Integrated parameter inversion analysis method of a CFRD based on multi-output support vector machines and the clonal selection algorithm[J].Computers and Geotechnics,2013,47(1):68–77.
    [18]朱晟,杨鸽,周建平,等.“5.12”汶川地震紫坪铺面板堆石坝静动力初步反演研究[J].四川大学学报(工程科学版),2010,42(5):113–119.(ZHU Sheng,YANG Ge,ZHOU Jian-ping,et al.Back analysis on static and dynamic characteristics of Zipingpu CFRD under“5·12”Wenchuan Earthquake[J].Journal of Sichuan University(Engineering Science Edition),2010,42(5):113–119.(in Chinese))
    [19]汪旭,康飞,李俊杰.土石坝地震永久变形参数反演方法研究[J].岩土力学,2014,35(1):279–286.(WANG Xu,KANG Fei,LI Jun-jie.Back analysis of earthquake-induced permanent deformation parameters of earth-rock dams[J].Rock and Soil Mechanics,2014,35(1):279–286.(in Chinese))
    [20]田强.土石坝动力参数的反演算法研究[D].大连:大连理工大学,2012.(TIAN Qiang.The research of inversion algorithms on dynamic parameters of earth-rock dam[D].Dalian:Dalian University of Technology,2012.(in Chinese))
    [21]冯新,周晶,范颖芳.基于模态观测的混凝土坝反演分析[J].水利学报,2004,35(2):101–105.(FENG Xin,ZHOU Jing,FAN Ying-fang.Inverse analysis of concrete dam with modal measurements[J].Journal of Hydraulic Engineering,2004,35(2):101–105.(in Chinese))
    [22]康飞,李俊杰,许青.混合蜂群算法及其在混凝土坝动力材料参数反演中的应用[J].水利学报,2009,40(6):736–742.(KANG Fei,LI Jun-jie,XU Qing.Hybrid simplex artif icial bee colony algorithm and its application in material dynamic parameter back analysis of concrete dams[J].Journal of Hydraulic Engineering,2009,40(6):736–742.(in Chinese))
    [23]王登刚,刘迎曦,李守巨.混凝土坝振动参数区间逆分析[J].大连理工大学学报,2002,42(5):522–526.(WANG Deng-gang,LIU Ying-xi,LI Shou-ju.In terval invers ion analys is for vibration parameters of concrete dam[J].Journal of Dalian University of Technology,2002,42(5):522–526.(in Chinese))
    [24]WANG Wei-qiang,KUANG Ya-hong.Back analysis of dam parameter under seismic action[J].Procedia Engineering,2012(28):429–433.
    [25]SEED H B,IDRISS I M.Infuence of soil conditions on ground motions during earthquake[J].Journal of the Soil Mechanics and Foundations Division,1969,95(1):99–138.
    [26]陈崇茂.土石坝料的变参数R-O模型及其热力学解释[D].大连:大连理工大学,2011.(CHEN Chong-mao.R-O model with varying parameters for dam materials and its thermodynamic explanation[D].Dalian:Dalian University of Technology.2011.6(in Chinese))
    [27]周明,孙树栋.遗传算法原理及应用[M].北京:国防工业出版社,1999.(ZHOU Ming,SUN Shu-dong.The principle and application of genetic algorithm[M].Beijing:National Defence Industry Press,1999.(in Chinese))
    [28]李敏强.遗传算法的基本理论与应用[M].北京:科学出版社,2002.(LI Min-qiang.The basic theory and application of genetic algorithm[M].Beijing:Science Press,2002.(in Chinese))
    [29]HWANG Jin-hung,WU Chia-pin,WANG Sheng-chin.Seismic record analysis of the Liyutan earth dam[J].Canadian Geotechnical Journal,2007,44:1351–1377.
    [30]台湾省中区水资源局.鲤鱼潭水库施工中安全评估计划总报告书[R].台中:中区水资源局,1993.(Central Water Resources Office.The overall safety assessment report of Liyutan Reservoir during construction[R].Taichung:Central Water Resources Office,1993.(in Chinese))
    [31]SEED H B,IDRISS I M.Soil moduli and damping factors for dynamic response analyses[D].Berkeley:Earthquake Engineering Research Center,University of California,1970.