近海工程沉桩振动对邻近埋地管道影响的数值模拟和现场监测
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为探究沉桩振动对邻近埋地管道安全性的影响,在基于ABAQUS平台数值建模计算和工程现场监测的基础上,就近海工程沉桩振动对邻近埋地管道安全运行可能产生的影响进行了建模探究与比对。研究表明,埋地管道周边质点振动速度峰值和管道位移这两个要素对埋地管道的影响最为直接显著。在此基础上提出了实际工程条件下近海埋地管道在沉桩振动施工下的安全控制标准:埋地管道质点振动速度控制标准为30 mm/s,埋地管道邻近土体水平位移控制标准为10mm。该控制标准在实际工程中取得了良好效果。
To explore the safety of pile driving vibration on adjacent buried pipeline,based on the platform of ABAQUS numerical modeling calculation and engineering on the basis of field monitoring,this paper studies the problem of offshore engineering pile driving vibration on adjacent buried pipeline which may affect safe operation. The results show that buried pipeline surrounding peak particle vibration velocity and pipeline displacement of the two elements of the influence of the buried pipelines are the most significant. On the basis of the proposed method,the engineering under the condition of offshore of buried pipelines under the pile driving vibration in the construction of safety control standard is that when buried pipelines particle vibration velocity control standard is 30 mm / s,buried pipelines adjacent soil horizontal displacement control standards is 10 mm. The safety control standards achieve satisfactory results in engineering practice. The proposed method and its safety control standards provide guidance for similar engineering and research.
引文
[1]佘艳华.机械冲击荷载对邻近埋地管道的影响及控制研究[D].北京:中国工程物理研究院,2012.
    [2]《桩基工程手册》编写委员会.桩基工程手册[M].北京:中国建筑工业出版社,1995.
    [3]林建生,吴淑美,王源毅,等.打桩对周围建筑物振动影响的研究方案与实测分析[J].地震地磁观测与研究,1999,20(4):24-29.LIN Jiansheng,WU Shumei,WANG Yuanyi,et al.Research of the vibration influence during pilling process on nearby buildings and the example analysis[J].Seismological and Geomagnetic Observation and Research,1999,20(4):24-29.(in Chinese)
    [4]中国工程爆破协会.GB 6722—2011爆破安全规程[S].北京:中国标准出版社,2004.
    [5]宋春生,李鹏飞,蒲传金.冲击钻孔振动对埋地管道的安全判据探讨[J].天然气技术与经济,2011(5):40-42.SONG Chunsheng,LI Pengfei,PU Chuanjin.Impact drilling vibration to explore the safety of the buried pipeline[J].Natural Gas Technology and Economy,2011(5):40-42.(in Chinese)
    [6]尚军雷,徐风,王韶光.施工振动对邻近建筑的危害[J].工业建筑,2006(36):981-982.SHANG Junlei,XU Feng,WANG Shaoguang.The vibration damage to the adjacent buildings during construction[J].Industrial Construction,2006(36):981-982.(in Chinese)
    [7]施建勇,陈文,彭劼.沉桩挤土效应分析[J].河海大学学报:自然科学版,2003,31(4):415-418.SHI Jianyong,CHEN Wen,PENG Jie.Pile-sinking induced soil squeezing effect[J].Journal of Hohai University:Natural Sciences,2003,31(4):415-418.(in Chinese)
    [8]中国葛洲坝集团公司三峡工程施工指挥部.DL/T 5135—2001水电水利工程爆破施工技术规范[S].北京:中国电力出版社,2009.
    [9]长江重庆航道工程局.JTS 204—2008水运工程爆破技术规范[S].北京:人民交通出版社,2008.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心