基于U型钢板桩施工的动态勘察技术的现场试验研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对灾害边(滑)坡的应急加固处置,提出了"动态勘察"的概念。基于"动态勘察"的目标,选择U型钢板桩作为灾害边(滑)坡的应急加固支挡结构。结合U型钢板桩的三种压入工法,分别采集了其压桩曲线图谱,对其进行了量化分析,定义了一系列的量化参数,分析了压桩曲线图谱与地层强度间的内在联系,分别拟合3种压入工法的压桩数据与地层强度特征值之间的经验关系式,并进行了工程实例的验证。试验结果表明,压桩曲线在地层分界面处会发生变化,可用于判断分界面位置;压桩曲线在不同地层会呈现不同特征,可利用经验公式近似预测地层强度。因此,利用压桩曲线特征与地层强度间的对应关系来进行"动态勘察"是可行的。
The concept of dynamic prospecting is presented aiming at emergency slope reinforcement. Based on the target of dynamic prospecting,the steel sheet pile is chosen to be used to emergency slope reinforcement. Combined with three pressing methods of U-shaped steel sheet pile,the pressing curves of each construction method are collected. And the pressing curves are on the quantification analysis. A series of quantitative parameters are defined. The internal relationship between the pressing curves and the strength of layers is analyzed. The empirical formulae for the piling data of three construction methods and strength characteristic value of layers are fitted or derived,which are verified by project examples. The results show that pile pressing curves present different changes in the interface of layers,which can be used to judge the location of interfaces. Pile pressing curves in different layers present different characteristics,and the empirical formulae can be used to predict the strength of layers. Therefore,it is feasible for"dynamic investigation"to utilize the corresponding relationships between the characteristics of the pile pressing curves and strength of layers.
引文
[1]王恭先.滑坡防治工程措施的国内外现状[J].中国地质灾害与防治学报,1998,9(1):1–8.(WANG Gongxian.Present situation of engineering measures for preventing and controlling landslide in china and abroad[J].The Chinese Journal of Geological Hazard and Control,1998,9(1):1–8.(in Chinese))
    [2]董秀军,黄润秋.三维激光扫描测量在汶川地震后都汶公路快速抢通中的应用[J].工程地质学报,2008,16(6):774–779.(DONG Xiujun,HUANG Runqiu.Application of 3D laser scanner in making duwen road travelable in short term after Wenchuan earthquake[J].Journal of Engineering Geology,2008,16(6):774–779.(in Chinese))
    [3]刘爱文,夏珊,徐超.汶川地震交通系统震害及震后抢修[J].震灾防御技术,2008,3(3):243–250.(LIU Aiwen,XIA Shan,XU Chao.Damage and emergency recovery of the transportation systems after Wenchuan earthquake[J].Technology for Earthquake Disaster Prevention,2008,3(3):243–250.(in Chinese))
    [4]范宣梅,许强,黄润秋,等.丹巴县城后山滑坡锚固动态优化设计和信息化施工[J].岩石力学与工程学报,2007,26(增2):4 139–4 146.(FAN Xuanmei,XU Qiang,HUANG Runqiu,et al.Dynamical optimal anchoring design and information construction of danba landslide[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):4 139–4 146.(in Chinese))
    [5]高克昌,孟国才,韦方强,等.德宏“7·5”特大滑坡泥石流灾害分析及其对策[J].防灾减灾工程学报,2005,25(3):251–257.(GAO Kechan,MENG Guocai,WEI Fangqiang,et al.Analysis and counter-measure for the large-scale landslide-debris flow hazard in dehong,Yunnan,China[J].Journal of Disaster Prevention and Mitigation Engineering,2005,25(3):251–257.(in Chinese))
    [6]殷跃平,李廷强,唐军.四川省丹巴县城滑坡失稳及应急加固研究[J].岩石力学与工程学报,2008,27(5):971–978.(YIN Yueping,LI Tingqiang,TANG Jun.Landslide reactivation and emergency stabilization on DANBA county town in Sichuan province[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(5):971–978.(in Chinese))
    [7]龙世洪.重大地质灾害应急处置实践与思考[J].资源环境与工程,2007,21(6):654–657.(LONG Shihong.The practice and thought in emergency treatment of gravely geo-hazard[J].Resources Environment and Engineering,2007,21(6):654–657.(in Chinese))
    [8]钟声,王川婴,吴立新,等.基于钻孔雷达和数字摄像的动态勘察技术研究[J].高技术通讯,2011,21(9):985–991.(ZHONG Sheng,WANG Chuangying,WU Lixin,et al.Dynamic exploration survey based on the borehole radar radar and digital imaging[J].Chinese High Technology Letters,2011,21(9):985–991.(in Chinese))
    [9]宋和平,张克绪,胡庆利.由压桩试验测得的P-s曲线确定土层力学参数的初步研究[J].哈尔滨建筑大学学报,2000,33(5):52–56.(SONG Heping,ZHANG Kexu,HU Qingli.Preliminary research on determination of mechanic parameters of soils with pile P-s curve measured from test[J].Journal of Harbin University of Civil Engineering and Architecture,2000,33(5):52–56.(in Chinese))
    [10]张明义.静力压入桩的研究与应用[M].北京:中国建筑工业出版社,2004:9–41.(ZHANG Minyi.Study and application of static pressed pile[M].Beijing:China Architecture and Building Press,2004:9–41.(in Chinese))
    [11]WAKO K,HASEGAWA K.Underground cylindrical mass parking structure by'press-in'method at densely developed urban area[C]//Proceedings of Ecodesign 2003:Third Inter National Symposium on Environmentally Conscious Design and Inverse Manufacturing.Japan:Tokyo,2003:803–808.
    [12]董成祥,付亦鹏.地基承载力特征值和桩端承载力特征值的比较研究[J].海岸工程,2006,25(3):29–32.(DONG Chengxiang,FU Yipeng.Comparative study on subgrade bearing capacity characteristic value and pile point bearing capacity characteristic value[J].Coastal Engineering,2006,25(3):29–32.(in Chinese))
    [13]楼晓明,赵春风,陈广,等.用抗剪强度指标计算预制桩软黏土侧摩阻力的参数统计分析[J].岩土力学,2010,31(增2):354–359.(LOU Xiaoming,ZHAO Chunfeng,CHEN Guang,et al.Statistical analysis of unit frictional force of precast piles in soft clay calculated by shear strength parameters[J].Rock and Soil Mechanics,2010,31(Supp.2):354–359.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心