四川锦屏二级电站高水头超深埋隧洞围岩质量分级快速评价方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
四川锦屏二级水电站地处雅砻江中游,流域地形深切狭窄,采用低闸拦截、长引水方案发电,引水隧洞长近17km,最大埋深达2 525 m,地应力高达70 MPa,水压力高达10.2 MPa,其围岩分级方法超越了目前规范标准的应用范畴,现场涌突水、岩爆等地质问题突出。在介绍引水线路地质条件基础上,提取了岩石强度、岩体结构、完整性、高地应力、高外水压力等关键因素,进行影响规律分析,并利用近3年时间连续跟踪、收集的大量地质资料,进行统计分析,归纳各因子的影响权重,建立了适用于锦屏二级水电站高地应力高外水压力条件下的围岩质量快速评价方法,通过现场应用,快速判定的结果与现场类别吻合率均达到88%以上,可为进一步的隧洞地质灾害加固处理提供可靠依据。
Jinping Ⅱ hydropower station,located in Yalong river,will generate electricity by employing low gate interception and long-distance diversion,with tunnel length of 17 km,the maximum depth of 2,525 m,the maximum geostress of 70 MPa and water pressure of 10. 2 MPa. Therefore,the surrounding rock classification methods are beyond the present specification standard. Based on the engineering geological background,the key factors influencing the rock classification are extracted,including rock strength,rock structure,integrity,geostress,and high water pressure. Then,in combination with the field statistical data,a rapid assessment method is established for Jinping Ⅱ hydropower station under the high geostress and high water pressure.Field application shows that its prediction accuracy is more than 88%,which can provide a reliable basis for the further reinforcement of tunnel geological disasters.
引文
[1]水电水利规划设计总院.水力发电工程地质勘察规范(GB50287—2006)[S].北京:中国计划出版社,2006:104-110.
    [2]中华人民共和国国家标准编写组.工程岩体分级标准(GB50218—94)[S].北京:中国计划出版社,1994:5-8.
    [3]邬爱清,柳赋铮.国标《工程岩体分级标准》的应用与进展[J].岩石力学与工程学报,2012,31(8):1513-1523.
    [4]中华人民共和国水利部.水利水电工程地质勘查规范(GB50487—2008)[S].北京:中国计划出版社,2008:78-82.
    [5]彭土标.水力发电工程地质手册[M].北京:中国水利水电出版社,2011:68-69.
    [6]Ji Feng,Shi Yuchuan,Zhou Chunhong.Mechanical response of surrounding rock of tunnels constructed with the TBM and drillblasting method[J].Natural Hazards,2013,5(2):265-274.
    [7]李碧波.锦屏二级水电站引水隧洞岩爆预测研究[D].成都:西南交通大学,2010:40-50.
    [8]Hajiabdolmajid V,Kaiser P K.Brittleness of rock and stability assessment in hard rock tunneling[J].Tunnelling and Underground Space Technology,2003,18:35-48.
    [9]谭以安.岩爆类型及其防治[J].现代地质,1991,5(4):450-455.
    [10]吉锋.锦屏二级水电站深埋隧洞不同施工方法下岩石声发射试验研究[J].工程勘察,2014,42(10):1-6.
    [11]包春燕.石灰岩破坏过程声发射及裂隙渗流特性研究[D].大连:大连海事大学,2010:6.
    [12]殷正钢.岩石破坏过程中的声发射特征及其损伤实验研究[D].长沙:中南大学,2005:3.
    [13]黄乘亿,刘建伟.基于EMD的粉砂岩单轴压缩破裂损伤分析[J].工程勘察,2014,42(1):6-10.
    [14]吕申鹏,陈卫忠,贾善坡,等.脆性岩石破坏试验研究[J].岩石力学与工程学报,2009,28(5):2772-2777.
    [15]肖树芳.不同岩石变形破坏机制及其声学特征[J].长春地质学院院报,1980(3):53-60.
    [16]秦鹏翔,杨晓迎.综合超前地质预报在深埋超长大隧洞TBM施工中的应用及对比分析[J].工程勘察,2008,36(S1):262-272.
    [17]Ebrahim F,Jamal R.Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel,Iran[J].Tunnelling and Underground Space Technology,2008,23(6):700-710.
    [18]Khademi H J,Kourosh S,Bahram R,et al.Performance prediction of hard rock TBM using Rock Mass Rating(RMR)system[J].Tunnelling and Underground Space Technology,2010,25(4):333-345.
    [19]Dollinger G L,Handewith H J,Breeds C D.Use of the Punch test for estimating TBM performance(Reprinted from Canadian Tunnelling,1998)[J].Tunnelling and Underground Space Technology,1998,13(4):403-408.
    [20]Gertsch R,Gertsch L,Rostami J.Disc cutting tests in Colorado red granite:Implications for TBM performance prediction[J].International Journal of Rock Mechanics and Mining Sciences,2007,44(2):238-246.
    [21]Gong Q,Zhao J,Jiang Y.In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels[J].Tunnelling and Underground Space Technology,2007,22(3):303-316.
    [22]茅均标,伍法权.深埋长隧洞前期勘查中工程地质调查与CSAMT异常分析[J].现代地质,2006,20(3):513-518.
    [23]徐则民,黄润秋.深埋特长隧道及其施工地质灾害[M].成都:西南交通大学出版社,2000:1-9.
    [24]四川省地质矿产局.四川区域地质调查报告[M].北京:地质出版社,1984:60-75.
    [25]高波,王峥峥,袁松,等.汶川地震公路隧道震害启示[J].西南交通大学学报,2009,44(3):336-374.
    [25]李智毅.草峪岭隧洞岩体结构特征及围岩稳定有限元分析[J].现代地质,1994,8(3):317-326.
    [26]李天斌.汶川特大地震中山岭隧道变形破坏特征及影响因素分析[J].工程地质学报,2008,16(6):742-750.
    [27]王明年,崔光耀.高烈度地震区隧道减震模型的建立及其减震效果模型试验研究[J].岩土力学,2010,31(6):1884-1890.
    [28]Saffet Y.Utilizing rock mass properties for predicting TBM performance in hard rock condition[J].Tunnelling and Underground Space Technology,2008,23(3):326-339.
    [29]Acaroglu O,Ozdemir L,Asbury B.A fuzzy logic model to predict specific energy requirement for TBM performance prediction[J].Tunnelling and Underground Space Technology,2008,23(5):600-608.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心