乐滩水电站坝址工程地质
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
通过对乐滩水电站坝址勘察及施工开挖揭露分析,坝址处于区域构造相对稳定区,厂坝基为弱风化~微风化岩体,允许承载力满足建筑物的应力要求;坝基抗滑稳定主要受混凝土与建基面岩体抗剪(断)强度控制,对少数坝块地基存在的较长软弱缓倾角结构面,已进行加固处理;坝基渗漏以岩溶裂隙性渗漏为主,局部有串珠状小溶洞渗漏,建议进行防渗帷幕处理是必要的。
Through the investigation for the dam site of Letan Hydropower station and disclosure analysis for construction and excavation,the dam site is located in a region with relative stable structure,the foundation of the dam is weakly and slightly rock mass,allowing the carrying capacity meets the requirements of the stress of building.Anti-slide stability of dam foundation is mainly controlled by shearing strength between concrete and dam foundation rock,reinforced treatment has been done for the surface of longer and weakly and slow-obliquity,existed on a few dam-foundation;dam-foundation seepage is mainly of grike seepage,and there is little cave like a string of beads in the local area,suggesting that it is necessary to carry out grouting gallery.