井控速度建模技术在地震资料处理中的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对辽河油区TJL及LWT地区叠前时间偏移速度场难以控制的情况,首次开展了井控速度建模技术研究。采用克里金插值法对测井资料进行插值,得到井速度模型,用该模型指导和约束叠前时间偏移速度建模,进一步提高速度场的精确性。最终,得到了TJL及LWT地区准确合理的叠前时间偏移速度模型,利用该速度模型进行叠前偏移处理,均取得了很好的成像效果。该项研究的成功应用不仅提高了辽河油田地震资料处理水平,对类似地区的地震资料处理也有一定的借鉴意义。
The prestack time migration velocity field of TJL&LWT area in Liaohe Oilfield was difficult to be controlled.Firstly the well-control velocity modeling technology was researched.Kriging interpolation method was used for interpolating the logging data and establishing velocity model.The model was deployed to guide and constrain the prestack time migration velocity modeling,improve the accuracy of the velocity field.Eventually the exact and reasonable prestack time migration velocity model of TJL&LWT area was obtained,by using this model for prestack time migration processing,it achieves good image result.The success of this study improves seismic data processing in Liaohe Oilfield and it provides reference for seismic data process for the similar areas.
引文
[1]张文坡,郭平,高艳,等.叠前时间偏移技术在辽河油田的应用[J].特种油气藏,2007,14(2):10~13.
    [2][美]渥.伊尔马滋.地震资料分析[M].刘怀山译.北京:石油工业出版社,2006.359~732.
    [3]张文坡.辽河油田地震资料精细处理[M].北京:石油工业出版社,2007.186~187.
    [4]张文坡,郭平.辽河油田叠前偏移技术研究及推广应用[A].赵正璋,杜金虎.地震资料叠前偏移处理技术研讨会文集[C].北京:石油工业出版社,2005.39~64.
    [5]赵正璋.地震资料叠前偏移处理技术[M].北京:石油工业出版社,2006.102~103.
    [6]张永华,陈萍,赵雨晴,等.基于合成记录的综合层位标定技术[J].石油地球物理勘探,2004,38(1):92~96.
    [7]韩行吉,杨文采,吴永刚.地震与声波测井资料的匹配[J].石油地球物理勘探,1995,30(增2):27~33.
    [8]王永刚,朱兆林,曹丹平.井间地震资料深度域合成记录的制作方法[J].石油大学学报(自然科学版),2005,29(3):27~30.
    [9]李黎,王永刚.地质统计学应用综述[J].勘探地球物理进展,2006,29(3):163~169.
    [10]侯景儒,尹镇南.实用地质统计学[M].北京:地质出版社,1998.1~39.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心