高层框架结构E-defense振动台试验弹塑性时程对比分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
长周期地震动对高层结构的影响在日本"311地震"后进一步受到关注,日本学者在E-defense振动台上进行了一20层高层RC框架1/4缩尺模型的加载试验,研究了长周期地震动作用下高层结构的响应及破坏特征;本文在介绍其主要试验结果的基础上,基于SNAP软件建立梁端部集中塑性铰杆单元、柱纤维单元的有限元模型,进行弹塑性时程分析再现试验结果;进一步考虑长周期地震动作用下高层结构长持时、大位移响应特征,对梁端恢复力模型考虑累积塑性损伤修正,计算结果与试验结果吻合良好。
The response of high-rise structure under long period ground motion( LPGM) gets more and more attention after‘311 earthquake'in Japan. To investigate the dynamic response and failure characteristics of frame structure,a 1 /4 scale model of a 20 layers RC frame subjected to LPGM was tested on E-defense shaking table by Japanese scholars recently. The typical experimental results were introduced by firstly. And then the nonlinear behavior observed in the test was reproduced by using the finite element analysis( FEM) software SNAP,in which the behavior of beam and column were modeled by plastic hinge and fiber models respectively. Based on the FEM model,the two particular characteristics( long duration and vast displacement response) of high-rise frame structure subjected to LPGM were simulated. The two characteristics caused notable cumulative damage on beam end,which was considered by using a revised plastic hinge model in FEM simulation. The comparative analysis method was verified by the good agreements of the tested and simulated results.
引文
[1]李春锋,张旸.长周期地震动衰减关系研究的迫切性[J].地震地磁观测与研究,2006,27(3):1-8.LI Chunfeng,ZHANG Yang.Urgency of long period ground attenuation relationship[J].Seismological and Geomagnetic Observation and Research,2006,27(3):1-8.(in Chinese)
    [2]章文波,于湘伟.1999年台湾集集大地震强地面运动的模拟[J].地震工程与工程振动,2010,30(3):1-11.ZHANG Wenbo,YU Xiangwei.Strong ground motion simulation of the 1999 Chi-Chi,Taiwan,earthquake[J].Earthquake Engineering and Engineering Dynamics,2010,30(3):1-11.(in Chinese)
    [3]周福霖,崔鸿超,安部重孝,等.东日本大地震灾害考察报告[J].建筑结构,2012(4):1-20.ZHOU Fulin,CUI Hongchao,Shigetaka ABE,et al.Inspection report of the East Japan earthquake by Sino-Japanese joint mission[J].Buliding Structure,2012(4):1-20.
    [4]方小丹,魏琏,周靖.长周期地震的反应特点与反应谱[J].建筑结构学报,2014(4):16-23.FANG Xiaozhou,WEI Lian,ZHOU Jing.Characteristics of earthquake response for long-period structures and response spectrum[J].Journal of Building Structures,2014(4):16-23.(in Chinese)
    [5]梁兴文,董振平,王应生,等.汶川地震中离震中较远地区的高层建筑的震害[J].地震工程与工程振动,2009,29(1):24-31.LIANG Xingwen,DONG Zhenping,WANG Yingsheng,et al.Damage to tall buildings in areas with large epicentral distance during M8.0Wenchuan Earthquake[J].Earthquake Engineering and Engineering Dyramics,2009,29(1):24-31.(in Chinese)
    [6]杉本訓祥等、縮小20層RC造建物試験体の長周期地震動による震動実験(その1~その11)[C]∥日本建築学会大会学術講演梗概集(北海道),2013:653-674.
    [7]2007年版、建築物の構造関係技術基準解説書[M].2007:622-623.
    [8]李振宝,刘春阳,高等利,等.钢筋混凝土梁板柱空间节点抗震性能试验研究[J].世界地震工程,2011,27(2):16-20.LI Zhenbao,LIU Chunyang,GAO Dengli,et al.Experiment studies on reinforced concrete spatial beam-slab-column joints[J].World Earthquake Engineering,2011,27(2):16-20.(in Chinese)
    [9]株式会社構造システム.任意形状立体フレームの弾塑性解析プログラムSNAP[M].2010.
    [10]GB50011-2010混凝土结构设计规范[S].北京:中国建筑工业出版社,2010.GB50011-2010 Code for Design of Concrete Structures[S].Beijing:China Architecture&Building Press,2010.(in Chinese)
    [11]孙新宇.基于长周期地震作用的框架梁抗震性能试验研究[D].北京:北京工业大学,2013.SUN Xinyu.Experimental study on the seismic performance of frame beam with simulating the long-period seismic loads[D].Beijing:Beijing University of Technology,2013.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心