引文
[1]ASM,MetalsHandbook.10(1975)8thEd,FailureAnalysisandPrevention.[2]ASMEBoilerandPressureVesselCode,Section,Division2(1983Edition)[3]张康达,锅炉压力容器的疲劳失效,劳动人事出版社,1988.8.[4]Akiyanma,H.al.,PressureVesselTechnology.ProceedingsoftheSixthInternationalConferenceHeldinBeijing,PergamonPress,1988.1743.[5]Yuhara,T.,ibid.[4]1767.[6]Erasmus,L.A.,PussegodaL,N,,MetallurgicalTransaction,11A(1980).Feb.231.[7]Lainlemay.PrinciplesofMechanicalMetallurgy,EdwardAmold,Ltd.1981.326.[8]ibid[7],324.[9]王栓柱.金属疲劳,福建科技出版社.1985,54.[1]龚士弘等,钢铁,22(1987).No.5.41.[11]李毅.重庆大学硕士论文,1990.[12]Martin,I.W.,MicromechanisininParticle-hardenedAlloys,CambridgsUniversityPress,144.