罕遇地震作用下钢筋混凝土框架-剪力墙结构的耗能机制分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为了确定钢筋混凝土框架-剪力墙结构在强震作用下的合理耗能机制,对多个结构算例进行多条强震记录作用下的弹塑性时程分析。通过分析总累积耗能在各类构件中的分配和各类构件耗能沿结构高度方向的分布模式,研究结构的典型耗能机制类型,讨论耗能机制与结构参数的关系,并对不同的耗能机制进行评价。结果表明,"强墙肢弱连梁"整体型耗能机制使结构具有良好的抗震性能,应作为结构耗能机制设计的目标,"强连梁弱墙肢"耗能机制则应予以避免;连梁与墙肢的相对刚度关系是影响结构耗能机制的关键因素,框架和剪力墙相对数量的改变则不会明显影响结构耗能机制。对具有小跨高比连梁的结构,建议采用连梁水平分缝措施引导结构形成"强墙肢弱连梁"耗能机制,并通过算例分析验证了该措施的有效性。
In order to determine the reasonable structural energy dissipation mechanism under rare earthquakes,several reinforced concrete frame-shear wall structures were analyzed by elasto-plastic time-history analytical method under a series of strong earthquake records.Based on the energy distribution among different types of structural members and along the structural height,typical energy dissipation mechanisms were summarized and evaluated respectively.And also the influences of structural parameters on the energy dissipation mechanisms were discussed.The results show that that 'strong wall pier-weak coupling beam' mechanism,leading to good structural seismic performance,should be set as the objective of structural seismic design while the 'strong coupling beam-weak wall pier' mechanism should be avoided.It is also shown that energy dissipation mechanism is determined by the relative stiffness of coupling beam and wall pier in the shear wall rather than relative numbers of frame and shear wall in the whole structure.At last,the measure of setting horizontal gap in the coupling beam with small span-depth ratio is proposed to result in 'strong wall pier-weak coupling beam' mechanism in the structure.And the effectiveness of this measure is validated through a numerical example.
引文
[1]叶列平,程光煜,曲哲,等.基于能量抗震设计方法研究及其在钢支撑框架结构中的应用[J].建筑结构学报,2012,33(11):36-45.(YE Lieping,CHENGGuangyu,QU Zhe,et al.Study on energy-basedseismic design method and application on steel bracedframe structures[J].Journal of Building Structures,2012,33(11):36-45.(in Chinese))
    [2]Akiyama H.Earthquake resistant limit state design forbuildings[M].Tokyo:University of Tokyo Press,1985:23-30.
    [3]叶列平,陆新征,马千里,等.屈服后刚度对建筑结构地震响应影响的研究[J].建筑结构学报,2009,30(2):17-29.(YE Lieping,LU Xinzheng,MAQianli,et al.Study on the influence of post-yieldingstiffness to the seismic response of building structures[J].Journal of Building Structures,2009,30(2):17-29.(in Chinese))
    [4]Nakashima M,Saburi K,Tsuji B.Energy input anddissipation behaviour of structures with hystereticdampers[J].Earthquake Engineering&StructuralDynamics,1996,25(5):483-496.
    [5]Connor J J,Wada A,Iwata M,et al.Damage-controlled structures:Ⅰ:preliminary design methodologyfor seismically active regions[J].Journal of StructuralEngineering,ASCE,1997,123(4):423-431.
    [6]Harada Y,Akiyama H.Seismic design of flexible-stiffmixed frame with energy concentration[J].EngineeringStructures,1998,20(12):1039-1044.
    [7]Whittaker A S,Uang C M,Bertero V V.Seismictesting of eccentrically braced dual steel systems[J].Earthquake Spectra,1989,5(2):429-449.
    [8]Nakashima M,Iwai S,Iwata M,et al.Energy-dissipation behavior of shear panels made of low-yieldsteel[J].Earthquake Engineering&StructuralDynamics,1994,23(12):1299-1313.
    [9]GB50011—2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.(GB50011—2010Codefor seismic design of buildings[S].Beijing:ChinaArchitecture&Building Press,2010.(in Chinese))
    [10]叶列平,陆新征,马千里,等.混凝土结构抗震非线性分析模型、方法及算例[J].工程力学,2006,23(增刊2):131-140.(YE Lieping,LU Xinzheng,MAQianli,et al.Nonlinear analytical models,methods andexamples for concrete structures subject to earthquakeloading[J].Engineering Mechanics,2006,23(Suppl.2):131-140.(in Chinese))
    [11]叶列平,马千里,缪志伟.钢筋混凝土框架结构强柱弱梁设计方法的研究[J].工程力学,2010,27(12):102-113.(YE Lieping,MA Qianli,MIAOZhiwei.Study on weak beam-strong column designmethod of RC frame structures[J].EngineeringMechanics,2010,27(12):102-113.(in Chinese))
    [12]缪志伟,陆新征,叶列平,等.高强配筋剪力墙框-剪结构的地震行为研究[J].华中科技大学学报:城市科学版,2007,24(4):17-21.(MIAO Zhiwei,LUXinzheng,YE Lieping,et al.Study on the seismicperformance of frame-shear wall structures with high-strength reinforcement in the shear wall[J].Journal ofHuazhong University of Science and Technology:UrbanScience Edition,2007,24(4):17-21.(in Chinese))
    [13]杨溥,李英民,赖明.结构时程分析法输入地震波的选择控制指标[J].土木工程学报,2000,33(6):33-37.(YANG Pu,LI Yingmin,LAI Ming.A newmethod for selecting inputting waves for time-historyanalysis[J].China Civil Engineering Journal,2000,33(6):33-37.(in Chinese))
    [14]JGJ3—2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2010.(JGJ3—2010Technical specification for concrete structures of tallbuilding[S].Beijing:China Architecture&BuildingPress,2010.(in Chinese))
    [15]李爱群,程文瀼,曹征良.钢筋混凝土抗震连系梁的设计与施工[J].东南大学学报,1997,27(3):1-5.(LI Aiqun,CHENG Wenrang,CAO Zhengliang.Design and construction of aseismic reinforced concretecoupling beams[J].Journal of Southeast University,1997,27(3):1-5.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心