高层建筑分段隔震结构双向水平地震作用下的动力时程分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
运用ANSYS程序对某一12层框架结构进行了模态和地震时程分析,为体现分段隔震结构的隔震效果,对比了分段隔震与基础隔震的地震反应;同时也对分段隔震结构在双向和单向水平地震作用下的地震反应进行了分析和对比;提出了结构在双向地震作用下整体位移最大值的计算方法,结果表明分段隔震结构比基础隔震能更有效减小结构的地震反应.
A modal analysis and a seismic time history analysis are performed on a twelve-story frame structure by using ANSYS program.In order to know the isolation effect of the segmented structure,the seismic responses of the segmented structure and the base isolation structure are compared.At the same time,the seismic responses are analyzed and compared,while the segmented isolation structure is subject to bilateral and unidirectional earthquake excitations.The method to calculate the overall maximum displacement with the structure subjected to bilateral earthquake excitations is put forward.Results show that the segmented isolation structure can more effectively reduce the seismic responses of the structure than the base isolation structure.
引文
[1]党育,杜永峰,李慧.基础隔震结构设计及施工指南[M].北京:中国水利水电出版社,2007.
    [2]周福霖.工程结构减震控制[M].北京:地震出版社,1997.
    [3]金建敏,谭平,周福霖.下部减震层间隔震结构振动台试验研究[J].振动与冲击,2012,31(6):104-108.
    [4]Cenk Alhan,Melih Sürmeli.Shear Building Representations ofSeismically Isolated Buildings[J].Bulletin of Earthquake En-gineering,2011,9(5):1 643-1 671.
    [5]Giuseppe Carlo Marano,Rita Greco,Francesco Trentadue,Bernardino Chiaia.Constrained Reliability-based Optimizationof Linear Tuned Mass Dampers for Seismic Control[J].Inter-national Journal of Solids and Structures,2007,44(22/23):7370-7 388.
    [6]Masatsuki T,Midofikawa S,Ohori M,et al.Simulation forSeismic Behavior of Office Furniture in a Hish-rise Building[J].AU Journal of Structural Construction Engineering,2007,43-49.
    [7]李慧,刘迪,杜永峰.添加耗能装置的大底板多塔楼基础隔震建筑抗震性能研究[J].甘肃科学学报,2010,22(3):114-121.
    [8]王学庆,刘海卿.高层分段隔震结构的动力响应分析[J].地震工程与工程振动,2008,28(1):170-174.
    [9]张颖,谭平,周福霖.分段隔震新体系的参数设计与减震性能研究[J].土木工程学报,2010,43(S1):270-275.
    [10]周福霖.多层房屋结构TMD“加层减震”试验研究和应用[J].世界地震工程,1998,14(4):57-60.
    [11]GB50011-2010,建筑抗震设计规范[S].
    [12]李世民,雷光宇.双向水平地震下橡胶支座基础隔震的时程分析[J].山西建筑,2008,34(16):24-25.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心