摘要
“南水北调”西线工程区域工程地质条件复杂,活动断裂发育、新构造运动强烈、地震活动频繁,地质灾害的影响很大。本文具体分析了活动断层、地震、冻土及深埋长隧洞地质灾害对工程的危害。
The construction areas along the Western Route Project for Transferring Water from Southern to Northern China are conspicuous by complicated engineering geological conditions,numerous active faults,highly neotectonism and frequent earthquakes.Numerous geological hazards may have important effects on the construction of the project.The emphasis in this study will be on the analysis of the geological hazards such as active faults,earthquakes,frozen earth and deeply- buried long tunnels.Great attention should be paid in the planning of the project so as to lower the risk of the project caused by geological hazards.
引文
[1]戴加洗.青藏高原气候[M].北京:气象出版社,1990.307-334.
[2]高治定,王玉峰.南水北调西线工程调水地区水文气象特征[J].人民黄河,2001,23(10):8-10.
[3]马东涛,崔鹏,陈书涛,等.南水北调西线工程调水区地质灾害问题[J].山地学报,2003,21(5):582-588.
[4]潘桂棠、丁俊、姚东生,等.青藏高原及邻区地质图及说明书(1∶1500000)[M].成都:成都地图出版社,2004.
[5]路新景.南水北调西线工程主要工程地质问题综述[A].南水北调工程地质分析研究论文集[C].北京:中国水利水电出版社,2002.181-191.