金沙江乌东德水电站区热水塘断层活动性研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
乌东德水电站预可行性研究阶段,陆车林、尖山包、河门口、白滩、三台子、乌东德六个比选坝址中,热水塘断层穿过其中河门口和白滩两个坝址。为了查明该断层规模、性状、活动性,作者在航片解译的基础上,经过野外验证和地质追踪调查,分析了沿断层带的地形地貌、地层岩性、岩溶发育特征,确定了该断层的性质。通过取岩样测年及显微构造等多种方法对断层的活动性进行了深入研究,认为该断层在中更新世前有一定的活动性,但后期活动性明显减弱,晚更新世后没有活动。综合地震资料分析,该断层不是工程活动断层,为坝址比选提供了重要依据。
In the pre-feasibility study for the Wudongde Hydropower station,six alternative dam sites,i.e.,Luchelin,Jinshangbao,Hemengkou,Baitan,Santaizi and Wudongde were evaluated.The Reshuitang Fault traverses both the Hemengkou and Baitan dam sites,therefore,it is very important to understand activities of the fault.In order to identify the scale,property and activities of the fault,the authors made a detail analysis of the geomorphologic,lithologic and karstic features along the fault based on interpretation of the aerial photos and field investigation.With geodating and microscopic structural analysis,the authors concluded that the fault was active before middle Pleistocene Epoch,but became less active afterwards and completely ceased after late Pleistocene Epoch.Additional seismic analysis confirmed that Reshsuitang Fault is no longer active.
引文
[1]冉勇康,陈立春.中国长线工程场地地震安全性评价中的活动构造问题[J].地震地质,2004,26(4):736~737.Ran Yongkang,Chen L ichun.Prob lem s of active tecton ics in seis-m ic safety assessm ent for line sites in Ch ina.Seismological Geolo-gy,2004,26(4):736~737.
    [2]徐开礼.构造地质学[M].北京:地质出版社,1989,159~~161.Xu Kaili.Structural Geology.Beijing:Geology Press,1989,159~~161.
    [3]范杨.澜沧—耿马地震前的地震活动条带与空区[J].地震研究,1991,14(2):124~125.Fangyang.Seism ic belts and gaps before occurrence of earthquakesalong Langcang—Gengma area.Seismology Study,1991,14(2):124~125.
    [4]张云湘,骆耀南,杨崇喜等.攀西裂谷[M].北京:地震出版社,1988,240~~241.Zhang Yunxiang,Luo Yaonan,Yang Congxi.Panxi R ift.Beijing:Seismology Press,1988,240~241.
    [5]郭进京,杜东菊,韩文峰等.青藏高原东北缘黄河黑山峡出口段阶地特征与断层活动[J].工程地质学报,2004,12(4):367~372.Guo Jin jing,Du Dongju and Han W enfeng et al.The characteris-tics of river terraces and activity of the fau lts in the outlet of theHeishan Gorge of the Yellow R iver,the northeastTibetan P lateau.Journal of Engineering Geology,2004,12(4):367~372.
    [6]蒋溥,梁小华.关于工程地震实践若干问题[J].工程地质学报,1998,6(1):1~26.Jiang Pu and L iang X iaohua.Som e prob lem s and study resu lts inengineering earthquake practice.Journal of Engineering Geology,1998,6(1):1~26.
    [7]周本刚,冉洪流.工程活动断裂坚定的时代标准讨论[J].工程地质学报,2002,10(3):274~278.Zhou Bengang and Ran Hongliu.D iscussion on the tim e criterionfor identifying engineering active fau lts.Journal ofEngineering Ge-ology,2002,10(3):274~278.
    [8]张秉良.阿尔金断裂东段断层滑动方式的研究[J].工程地质学报,1997,5(2):259~264.Zhang B ingliang,et al.Study on the model of slipp ing along theeastern segm ent of the A ltun Fau lt zone.Journal of EngineeringGeology,2000,5(3):259~264.
    [9]史兰斌,李祖信,唐汉军等.新疆克斯河下游河段断层活动性研究[J].工程地质学报,1994,2(3):13~20.Sh i Lanb in,et al..Study on the fau lt activities in the downstreamreach of X ingjiang Kesi R iver.Journal of Engineering Geology,1994,2(3):13~20.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心