巷道前方地质构造MSP法超前探测技术与应用研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
巷道前方地质构造超前探测是地下工程施工的技术关键和技术难题,利用地震反射波探测技术,采用巷道多次覆盖观测系统采集地震数据,通过能量合成与分解、波场分离、偏移叠加等处理技术,形成矿井地震波超前探测技术(Mine Seismic Prediction即MSP技术),在巷道迎头空间进行全方位的数据采集与处理,可获得巷道探测方向的各种有效的反射波组,该波组与前方的地质界面具有很好的对应性。数值模拟、室内超声波实验与现场探测实验表明,MSP探测技术可以解决巷道前方300m以内的各种地质构造预报。
The fore detection and forecasting for geological structure in laneway are very difficult to be solved in underground engineering construction.Therefore,we attain Mine Seismic Protection technology(MSP)by utilizing reflection wave theory.The technology gets seismic data by multifold in laneway and processes these data through some processing technique including synthesizing and decompounding,wave field separation and migration stack etc.All kinds of geological interfaces of reflecting waves in fore laneway can be gained by collecting and processing the data from laneway section.Some numerical simulation test and ultrasonic wave experiment and practical detecting application indicate that MSP technology can detect many geological structures within 300 meters in the fore of laneway.
引文
[1]赵永贵,刘浩,孙宇,等.隧道地质超前预报研究进展[J].地球物理学进展,2003,18(3):460—464.
    [2]李勇,孙喜峰,李廷.隧道施工地质超前预报方法[J].地质与资源,2004,13(2):119—122.
    [3]何振起,李海,梁彦忠.利用地震反射法进行隧道施工地质超前预报[J].铁道工程学报,2000(4):81—85.
    [4]何继善,柳建新.隧道超前探测方法技术与应用研究[J].工程地球物理学报,2004,1(4):293—298.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心