城区特大型障碍物变观三维观测系统设计及应用——以德阳三维为例
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在过德阳城区的地震勘探施工中,采用多种技术相结合的变观设计方法,在城区加密接收线和使用固定排列,城区周边根据"束内调整"和"束间调整"相结合的原则进行炮点布设,并对观测系统进行反复调整和属性分析,设计出适用的变观方案,弥补炮点不足造成的小炮检距缺失。同时采用新设备,压制城区内的部分环境噪声,取得较好的地震采集效果。
During seismic survey in Deyang urban district,variable survey design method,which is a multi-technologies combined method,was used.By infilling receivers lines and use of invariable geometry layout and adjusting the shots in swaths and between swaths around the urban districts,an optimal variable seismic geometry was designed after the adjustment and analysis of its attribute.Missing short offsets can be partly complemented because of shortage of shot points in urban area.Some environmental noises were suppressed by newest device.High quality of data acquisition was obtained.
引文
[1]刘远志,余文科,梁勇.三星堆遗址大型障碍物三维变观技术研究[J].物探化探计算技术,2010,32(6):594-599.
    [2]蒋先艺,贺振华,黄德济.地震数据采集新概念[J].物探化探计算技术,2003,25(2):130-134.
    [3]李庆珍,张兴民,王书军.三维观测系统中横向覆盖次数及CDP间隔的计算方法[J].物探与化探,2000,(2):135-137.
    [4]钱光萍,康家光,王紫娟.基于模型的地震采集参数分析及应用研究[J].物探化探计算技术,2001,23(2):109-114.
    [5]汪晴川,李瑞,沈庆夏,等.山地大型障碍区三维地震观测系统的设计与应用[J].物探化探计算技术,2009,31(3):241-244.
    [6]晁如佑,付英露,石一青,等.复杂障碍区三维地震观测系统变观设计方法及应用[J]复杂油气藏,2010,3(4):31-34.
    [7]张光德,丁伟,胡立新,等.城区三维地震观测系统设计及应用效果[J].石油地球物理勘探,2006,41(2):129-132.
    [8]徐文荣.地表复杂区的三维数据采集[J].石油地球物理勘探,1991,26(4):473-486,546.
    [9]任福新,段云卿,于富文,等.复杂地表变观方法及效果分析[J].物探与化探,2006,30(1):55-58.
    [10]赵殿栋,吕公河,张庆淮,等.高精度三维地震采集技术及应用效果[J].石油物探,2001,40(1):1-8.
    [11]李振春,滕厚华,孙小东.复杂地表共反射面元叠加技术应用与发展前景[J].勘探地球物理进展,2007,30(5):330-333,360.
    [12]Cordsen A,Peirce J W.陆上三维地震勘探的设计与施工[M].俞寿朋译.北京:石油工业出版社,1996.
    [13]Vermeer G J O.3-D symmetric sampling[J].Geophysics,1998,63(5):1629-1647.
    [14]Vermeer G J O.3D seismic survey design optimization[J].Lead-ing Edge,2003,23(10):934-941.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心