伊拉克Missan项目雷区作业风险管理
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
伊拉克南部Missan三维地震项目是2012-2013年度BGP国际部的重点项目,工区内大量的地雷和未爆军火给三维地震采集带来了巨大的挑战和安全隐患。BGP8637队在执行项目过程中,在通过多种渠道了解雷区信息的基础上,充分评估雷区地震作业安全风险,群策群力,实践并总结了一套雷区作业安全管理和风险控制程序,并在实际生产中严格遵守和执行,保障了三维地震项目的顺利安全完成。在充分总结本项目雷区作业风险评估的基础上,重点阐述了雷区地震作业安全管理和风险控制措施,希望能对类似区域的地震作业提供全面的参考。
The Missan three-dimensional seismic survey project,a major project of BGP international department during 2012 ~ 2013,faces serious potential safety problems induced by a large number of mines and unexploded ordnance in work area. Based on the minefield information from different sources,the safety risk of seismic survey operation in minefield is fully assessed by the BGP Crew 8637. And then,a set of safety management and risk control procedure are proposed and applied to production process to ensure the security of the 3-D seismic project.Fully summarizing the safety risk assessment and risk control measures of operation in minefield area,this article provide some valuable experience about work safety in minefield area or in other dangerous areas.
引文
[1]地雷,兰登书屋词典(兰登书屋公司),2012.地雷柯林斯英语词典(哈珀柯林斯),2009
    [2]阿兰,霍尔.铁的收获:军人们清理费兰德斯区地底下数百吨致命的一战废弃未爆军火纪实,伦敦每日邮报,2014.3.22
    [3]陆基孟,王永刚.地震勘探原理(第三版),北京:中国石油大学出版社,2009
    [4]宫运华,张来斌,樊建春.论企业安全文化建设与安全管理体系运行[J].中国安全生产科学技术,2011,7(9):199-202GONG Yun-hua,ZHANG Lai-bin,FAN Jan-chun.Discussion on the relationship between safety culture development and safety management system[J].Journal of Safety Science and Technology,2011,7(9):199-202
    [5]苏宏杰,肖寒.我国安全生产标准体系的现状和对策研究[J].中国安全生产科学技术,2011,7(6):99-103SU Hong-jie,XIAO Han.Research on present status and countermeasure for work safety standard system in China[J].Journal of Safety Science and Technology,2011,7(6):99-103
    [6]苏宏杰,刘加保.从安全生产指标体系透视企业安全管理重点[J].中国安全生产科学技术,2009,5(2):137-140SU Hong-jie,LIU Jia-bao.View enterprise emphasis on safety management from safety indicator system[J].Journal of Safety Science and Technology,2009,5(2):137-140
    [7]彭英伟,伍东,刘国志,杨振国.境外高风险地区项目安保管理研究[J].中国安全生产科学技术,2014,10(1):181-186PENG Ying-wei,WU Dong,LIU Guo-zhi,YANG Zhenguo.Analysis on security management of overseas high risk region project[J].Journal of Safety Science and Technology,2014,10(1):181-186

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心