云南震害损失评估与恢复重建规划主要技术指标
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以2011年3月10日云南盈江5.8级等4组5次地震为主要对象,深入分析灾害损失评估和恢复重建规划编制涉及的地震烈度调查与恢复重建范围,失去住所人数与灾后过渡性安置人数,以及民房、教育、卫生、市政、电力、通信、水利等破坏与恢复重建的规模,探讨了相互间的关系,并提出建议,对科学客观合理评估地震直接灾害损失和恢复重建规划具有一定的参考价值。
Basing on the five earthquakes in four group including Yingjiang M5.8 earthquake,we deeply analyzed the seismic intensity investigation and restoration and reconstruction range,the number of homeless and transition resettlement people,and damage and restoration and reconstruction scales of civilian buildings,education,health, municipal administration,electric power,communication,and water conservancy involved in seismic disaster losses evaluation and restoration and reconstruction,and discussed the relationship betw een them. The advice could provide the reference value on the seismic direct disaster losses evaluation and restoration and reconstruction planning,which is scientific,objective and reasonable.
引文
①云南省地震局.2011.2011年3月10日盈江5.8级地震灾害直接经济损失评估报告.
    ②云南省地震局.2012.2012年6月24日宁蒗—盐源5.7级地震灾害直接经济损失评估报告(云南灾区).
    ③云南省地震局.2012.2012年9月7日彝良5.7级、5.6级地震灾害直接经济损失评估报告(云南灾区).
    ④云南省地震局.2013.2013年3月3日洱源5.5级地震灾害直接经济损失评估报告.
    ①中华人民共和国防震减灾法.2008.
    ①云南省发展和改革委员会.2012.昭通彝良“9·7”地震灾后恢复重建规划.
    ②云南省发展和改革委员会.2013.洱源“3·3”地震灾后恢复重建规划.
    ③云南省发展和改革委员会.2011.盈江县“3·10”地震灾后恢复重建规划.
    ④云南省发展和改革委员会.2012.宁蒗“6·24”地震灾后恢复重建规划.
    ⑤云南省发展和改革委员会.2012.昭通彝良“9·7”地震灾后恢复重建规划.
    ⑥云南省发展和改革委员会.2013.洱源“3·3”地震灾后恢复重建规划.
    ①云南省发展和改革委员会.2011.盈江县“3·10”地震灾后恢复重建规划.
    ②云南省发展和改革委员会.2012.宁蒗“6·24”地震灾后恢复重建规划.
    ③云南省发展和改革委员会.2012.昭通彝良“9·7”地震灾后恢复重建规划.
    ④云南省发展和改革委员会.2013.洱源“3·03”地震灾后恢复重建规划.
    国家地震局震害防御司.1993.地震灾害预测和评估工作手册[S].北京:地震出版社.
    中国地震局.1998.地震现场工作大纲和技术指南[M].北京:地震出版社.
    周光全,施伟华,非明伦,等.2006.云南地震烈度分布面积的统计特征[J].地震研究,29(4):193-196.
    周光全.2011.云南地区简易房屋的震害指数研究[J].地震研究,34(1):88-95.
    GB/T17742—2008,中国地震烈度表[S].
    GB/T18208.3—2000,地震现场工作第三部分:调查规范[S].
    GB/T18208.4—2005,地震现场工作第4部分:灾害直接损失评估[S].