地震动加速度时程一致性评价方法研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为评价使用各种方法获得地震动加速度时程与区域内地震动加速度时程观测资料的一致性,提出一种能够综合时频特性的地震动时程一致性评价指标及其相对性判据,该方法可以量化分析待评价地震动时程对区域构造信息的反映能力。通过评价唐山地区陡河地震台和四座楼地震台模拟结果与实际观测结果的一致性,给出了实用化的算例。
To evaluate the consistence of the seismic ground acceleration time history between by use of different method and regional observation,we put forward a kind of assessment index of the consistence of the seismic ground time history which could synthesize the time-frequency characteristics and its relative consistency criterion. This method could quantitatively analyze the reflection ability of evaluated seismic ground time history on the regional tectonic information. We compared the simulation result with the realistic observation result of Tangshan M4. 7earthquake in 2012 recorded by Douhe Station and Sizuoluo Station in Tangshan area,and gave a practical example.
引文
虢顺民,李义志.1977.唐山地震区域构造背景和发展模式的讨论[J].地质科学,4(10):305-321.
    胡聿贤.1999.地震安全性评价技术教程[M].北京:地震出版社.
    孟庆筱,王太松,韩勇,等.2014a.二维有限元基岩水平向地震动模拟方法及检验[J].大地测量与地球动力学,34(4):9-16,20.
    孟庆筱,王太松,吕健,等.2014b.唐山断裂带三维构造应力场的数值模拟[J].大地测量与地球动力学,34(1):38-42.
    孟庆筱,姚运生,胡国新,等.2012.巴东黄土坡滑坡稳定性分析[J].大地测量与地球动力学,32(6):65-70.
    张翠然,陈厚群.2008.工程地震动模拟研究综述[J].世界地震工程,24(6):150-157.
    郑秀芬,欧阳飚,张东宁,等.2009.“国家数字测震台网数据备份中心”技术系统建设及其对汶川大地震研究的数据支撑[J].地球物理学报,52(5):1412-1417.
    Anderson J.G..2004.Quantitative Measure of the Goodness-of-fit of Synthetic Seismograms[C].13th World Conference on Earthquake Engineering:1-6.
    Arias A..1970.A Measure of Earthquake Intensity[C]//Hansen R.J.Seismic Design for Nuclear Power Plants.Cambridge,MA:Massachussetle.Institute of Technology Press,438-483.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心