摘要
紫坪铺水库所在地区地质构造复杂,2004年建成的水库诱发地震监测系统在"5.12"地震时被毁严重。紫坪铺水库地震观测系统的恢复重建方案以原"紫坪铺总体技术设计"为主线,利用有限资金尽量满足原设计的监测能力,并时实现观测技术系统升级换代,修复后实际监测能力与地震记录情况达到设计要求。
Zipingpu reservoir is located in an area with complex geological structure;the reservoir-induced earthquake monitoring system built in 2004 was seriously destroyed by 5.12 Wenchuan M8.0 Earthquake.The post-disaster reconstruction scheme of Zipingpu reservoir earthquake monitoring system is based on Zipingpu overall technological design,meets the primary monitoring capacity with limited funding,and achieves monitoring technological system upgrading.When the post-disaster reconstruction system is finished,the practical monitoring capacity and earthquake recording meet the design requirements.