摘要
在沙特S-49项目中,导航系统与仪器系统及气枪控制系统的成功联机和使用,提高了生产效率,为复杂的TZ项目的运作创造了一个成功范例。文章介绍了408 ULS与GATOR及TGN联机的方法及使用中的经验和体会。
It sets a very successful example for complicated TZ project operation that the recording system integrates with the navigation system and airgun controller system in S-49 project. This article introduces the method that how to connect the 408ULS, GATOR and TGN together and some skills about their application.