汶川特大地震灾后民营企业重建资金的统筹分配模式
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
通过对受灾民营企业实地调研和深入访谈,针对灾后民营企业恢复重建中资金分配出现的关键问题,以统筹优选思想与方法为方法支撑,以资金分配原则和重建原则为指导思想,构建民营企业重建资金链分配的模式框架,提出重建资金的统筹分配模式。该模式包括外分资金供应链优化模式和内分资金供应链优化模式,并通过建立重建资金分配的闭环控制流程和重建资金分配的监管体系,系统化灾后民营企业重建资金的统筹分配。
Through field research and in-depth interview of private enterprises,with regard to key issues in funds allocation in private enterprises post-disaster reconstruction,guided by the principles of overall co-ordination methodology,reconstruction,and funds allocation,this paper proposed to redevelop the co-ordination of funds allocation model to reconstruct the framework of private enterprise fund allocation for reconstruction.With outside sub-funds supply chain optimization and sub-funds within the supply chain optimization,through establishing close-loop control of the reconstruction process and regulatory mechanism for fund allocation,this model tries to systemize fund allocation in post-disaster private enterprise reconstruction.
引文
[1]卢中亚,林祝微.基于需求驱动的资金流模型分析与研究(J).计算机时代,2007(11):14-16.
    [2]王志忠,刑现忠.企业资金链研究[J].现代商业,2004,4(4):189.
    [3]谢家平,黄雪琪,陈荣秋.闭环供应链物流网络选址优化模型[J].系统管理学报,2008,17(3):248-255.
    [4]Sheffi Y.A supply chain view of the resilient enter-prise[J].Operations Management and Research,2005,47(1):41-48.
    [5]董超,黄丽华.电子商务环境下的供应链模式探讨[J].物流技术,2001,11(6):22-24.
    [6]徐玖平,卢毅.地震灾后重建系统工程的综合集成模式[J].系统工程理论与实践,2008,28(7):1-16.
    [7]徐玖平,卢毅,段雪玲.汶川特大地震灾后民营企业恢复重建的资金政策研究报告[R].四川大学研究报告,SCUUDLa-08-03,2008.06.
    [8]华罗庚.华罗庚科普著作选集[M].上海:上海教育出版社,1984:369-440.
    [9]徐玖平,马艳岚,段雪玲.汶川八级地震灾后民营企业灾后重建的优选统筹模式[J].中国管理科学,2008,16(4):1-12.
    [10]徐玖平,段雪玲.汶川特大地震灾后民营企业重建的综合融资模式[J].管理学报,2008,5(5):1-7.
    [11]徐玖平,卢毅.汶川特大地震灾后民营企业恢复重建的科学评估研究报告[R].四川大学研究报告,SC-UUDLa-08-07,2008.07.
    [12]徐玖平,卢毅,朱洪军,等.汶川特大地震民营企业灾后恢复重建的调查研究报告[R].四川大学研究报告,SCUUDLa-08-16,2008.08.
    [13]向英,周扬.救灾资金使用机制探讨[J].中国减灾,2005(7):41.
    [14]杨德森.救灾款物发放中的问题和改进建议[J].乡镇财会,1999(1):42.
    [15]林加华.完善救灾资金使用管理[J].发展研究,2008(1):43-44.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心