动态路况下考虑决策者风险感知的地震物资调配动力学模型
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
决策者心理与行为对突发事件应急响应是否高效起到了决定性的作用。针对路况动态变化下的地震物资调配问题,基于前景理论,分别构建了救援中心和灾点决策者不同决策主体的风险感知函数,以衡量决策者对缺货和运输时间延迟的风险感知程度。从道路运力评估、物资流动、决策过程以及物资需求等模块建立了物资调配全过程系统动力学仿真模型。在此基础上,分析了两层决策者不同的决策态度(乐观/悲观)对应急物资调配过程产生的影响,并以汶川灾区粮食供应为例进行仿真实验,证明了模型的有效性和稳健型。
The decision-makers' psychological and behavior are critical in the process of emergency response.This paper focuses on relief materials scheduling after earthquake under dynamic traffic.Using the value function in Prospect Theory to measure rescue center and the decision-makers' psychological risk perception.a SD model of earthquake emergency material allocate model under dynamic traffic was constructed,which including road capacity evalution,material flows,decision-making process,and material requirements.The impact of different decision-making attitudes(optimism/pessimism)to the process of emergency material allocation are studied as well.The food supply to Wenchuan county in‘5.12'Wenchuan Earthquake is taken as an example to testify the model's validity and robustness.
引文
[1]Beamon B M.Humanitarian relief chains:Issues and challenges[C]//Proceedings of the 34th International Conference on Computers and Industrial Engineering.University of Washington,2004:1-6.
    [2]Balcik B,Beamon B M.Facility location in humanitarian relief[J].International Journal of Logistics Research and Applications,2008,11(2):101-121.
    [3]Whybark D C,Melnyk S A,Day J,et al.Disaster relief supply chain management:New realities,management challenges,emerging opportunities[J].Decision Line,2010,41(3):4-7.
    [4]Kovács G,Spens K M.Humanitarian logistics in disaster relief operations[J].International Journal of Physical Distribution&Logistics Management,2007,37(2):99-114.
    [5]彭岷.基于系统动力学的应急物资补货决策模型研究[D].成都:电子科技大学,2012.
    [6]王旭坪,马超,阮俊虎.运力受限的应急物资动态调度模型与算法[J].系统工程理论与实践,2013,33(6):1492-1500.
    [7]Fiedrich F,Gehbauer F,Rickers U.Optimized resource allocation for emergency response after earthquake disasters[J].Safety Science,2000,35(1):41-57.
    [8]Kathleen Madland Kowalski.A human component to consider in your emergency management plans:The critical incident stress factor[J].Safety Science,1995,20(1):115-123.
    [9]Boudreau J,Hopp W,McClain J O,et al.On the interface between operations and human re source management[J].Manufacturing and Service Operations Management,2003,5(3):179-202.
    [10]李俊岭,牛梦英,李利利.备选项序列特征对动态决策行为影响的实验研究[J].河北师范大学学报,2009,32(2):146-150.
    [11]王旭坪,马超,阮俊虎.考虑公众心理风险感知的应急物资优化调度[J].系统工程理论与实践,2013,33(7):1735-1742.
    [12]Sterman J D.Modeling managerial behavior:Misperceptions of feedback in a dynamic decision making experiment[J].Management science,1989,35(3):321-339.
    [13]Poles R.System dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies[J].International Journal of Production Economics,2013,144(1):189-199.
    [14]王成敏,孔昭君.基于系统动力学的动员潜力释放链运行机理研究[J].公共管理学报,2010.7(2):97-106.
    [15]储文功,黄文龙,刘照元,等.基于系统动力学的应急药品供应系统仿真研究[J].科学管理研究,2010,18:209-211.
    [16]Wang X,Wang Q,Chen M.System dynamics model of unconventional emergency resource coordination system[C]//Computational Sciences and Optimization(CSO),2012Fifth International Joint Conference on.IEEE,2012:271-275.
    [17]韩传峰,王兴广,孔静静.非常规突发事件应急决策系统动态作用机理[J].软科学,2009,23(8):50-53.
    [18]Kahneman D,Tversky A.Prospect theory:An analysis of decision under risk[J].Economica,1979,47(2):263-291.
    [19]陈厚群,李敏,石玉成.基于设定地震的重大工程场地设计反应谱的确定方法[J].水利学报,2005,36(12):1399-1404.
    [20]吴立新,李志锋,王植,等.地震灾情快速评估方法和应用:以玉树地震为例[J].科技导报,2010,24:38-43.
    [21]Cafiso S,La Cava G.Risk Assessment for road safety evaluation on two lane rrural high-ways[C]//In:Proceeding(704)Advances in Management Science and Risk Assessment,2010.
    [22]谢青,李忠昊.抗震救灾100天:“5·12”地震日志[M].成都:四川大学出版社,2009:3.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心