浅谈组合式锚杆在隧道施工中的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
隧道系统锚杆使用时应保证注浆饱满,满足新奥法施工锚喷支护的技术要求。为了解锚杆注浆饱满度及使用性能,试验小组在大别山隧道施工中进行了试用,试用结果证明,组合式锚杆施工工艺合理,可以确保注浆饱满,与传统的砂浆锚杆和普通中空锚杆相比,施工效率基本接近。通过对比分析,推荐选用组合式锚杆。
Bolts used in tunnel construction must be fully grouted so as to satisfy the technical requirements of shotcreting-bolting support according to NATM(New Austrial Tunneling Method).In order to investigate the mortar grouting fullness and performance of combined bolts,trial application of combined bolts is made in the construction of Dabieshan tunnel.The trial results show that the construction process of combined bolts is reasonable,the combined bolts can be fully grouted and have almost the same construction efficiency as traditional mortar bolts and hollow grouting bolts.It is concluded that combined bolts should be recommended for tunnel construction.
引文
[1]翟飞飞.管式注浆锚杆在软弱破碎围岩地下(边坡)工程中的应用[J].隧道建设,2007,27(增刊):454-456.
    [2]徐祯祥,刘月芬.岩土工程中的锚固技术[M].北京:地震出版社,1992:158-160.
    [3]张祉道.当前隧道工程中锚杆应用状况及其评述[J].世界隧道,2000(增刊):188-189.
    [4]梁炯鋆.砂浆锚杆永久性问题的研究[J].隧道与地下工程,1989(2):312-314.
    [5]夏代生,刘春生.工程地球物理学进展[M].武汉:武汉水利电力大学出版社,2000:298-300.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心