菜园坝长江大桥荷载试验中的全桥线形测量
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
对于大跨径桥梁而言,在荷载试验中获得全桥的线形具有很重要的意义。为了突破全站仪无法获得全桥所有测点挠度数据的缺陷,采用测量精度为毫米级的连通管法挠度监测系统来实现桥梁挠度的多点同步测量,从而获得全桥的相对线形;通过菜园坝长江大桥的荷载试验,结果证明了系统的正确、可行性。
It is very important to acquire deflection of full-bridge alignment in large span bridge load test.In order to overcome the defect that Total Station can not obtain the deflection of full-bridge alignment,the connecting pipe principle deflection measurement system is adopted to implement multi-point synchronous measurements.As a result,bridge alignment is gained.Caiyuanba Yangtze River Bridge load test results have been demonstrated the effectiveness of the proposed method.
引文
[1]章日凯,王常青.桥梁荷载试验[J].交通标准化,2005,(12):69~72.
    [2]郝海森,王勇智,曹志勇,张春玉.全站仪在箱梁挠度变形观测中的应用[J].工程勘察,2007,(12):61~63.
    [3]刘国平.连通管式桥梁挠度监测系统的低频动态特性研究[D].重庆大学,2007:11~13.
    [4]雷小华.大跨径拱桥多维位移的光电组合监测技术研究[D].重庆大学,2007:121~122.
    [5]陈伟民,胡卫军,陈小强等.一种透射式半集成光电液位测量方法[J].仪器仪表学报,2005,26(4):425~428.
    [6]熊先才,章鹏,苻欲梅,朱永,陈伟民,张永兴.光电液位传感器及其在桥梁挠度自动测量中的应用[J].地震工程与工程振动,2006,26(4):261~263.
    [7]杨建春,陈伟民.连通管式光电液位传感器在桥梁挠度监测中的应用[J].传感器与微系统,2006,25(8):79~81.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心