引文
[1]王梦恕,李典璜,张镜剑,等.岩石隧道掘进机(TBM)施工及工程实例[M].北京:中国铁道出版社,2004:16~23,121~124WANG Mengshu,LI Dianhuang,ZHANG Jingjian,Fu Bingjun,et al.The Construction of Rock Tunnel Boring Machine and Project Examples[M].Beijing:China Railway Publishing House,2004:16~23,121~124
[2]尹俊涛,尚彦军,傅冰俊,等.TBM掘进技术发展及有关工程地质问题分析和对策[J].工程地质学报,2005,13(3):389~396YIN Juntao,SHANG Yanjun,FU Bingjun,etc.Development of TBM-Excavation technology and analyses&countermeasures of related engineering geological problems[J].Journal of Engineering Geology,2005,13(3):389~396
[3]M.Alvarez Grima,P.A.Bruines,P.N.W.Verhoef.Modeling tunnel boring machine performance by Neuro-Fuzzy Methods[J].Tunnelling and underground space technology,2000,15(3):259~264
[4]Ralf J.Plinninger,Heiko Kasling,Kurosch Thuro.Wear prediction in hard rock excavation using the CERCHAR abrasivenessindex(CAI)[A].EUROCK 2004&53rd Geomechanics Colloquium,2004
[5]Richard Gertsch.Rock toughness and disc cutting[D],Missouri:The university of Missouri-Rolla,1998:1~3
[6]R Ribacchi,A Lembo Fazio.Influence of rock mass parameters on the performance of a TBM in a Gneissic Formation(Varzo Tunnel)[J].Rock Mech.Rock Engng,2005,38(2):105~127
[7]I.S.Cameron-Clarke,S.Budavari.Correlation of rock mass classification parameters obtained from borecore and in situobservations[J].Engineering Geology,17,1981:19~53
[8]水利部科技推广中心.全断面岩石掘进机[M].北京:石油工业出版社,2005Science and Technology Extension Center of The Ministry of Water Resources of PRC.Full-face Rock Tunnel Boring Machine[M].Beijing:Petroleum Industry Press,2005(in Chinese)
[9]孙广忠.地质工程理论与实践[M].北京:地震出版社,1996Sun Guangzhong.Theory and Practice of Geological Engineering[M].Beijing:Earthauake Press,1996.(in chinese)
[10]王旭,李晓,李守定.关于用岩体分类方法预测TBM掘进速率AR的讨论[J].工程地质学报,2008,16(4):470~475WANG Xu,LI Xiao,LI Souding.Problems in the prediction of the TBM advance rate with rock mass classification and theirpossible solutions[J].Journal of Engineering Geology,2008,16(4):470~475
[11]Yousof Qahtan.Analysis of performance of tunnel boring machine-based system[Doctorate Dissertation][D],Austi:The universityof Texas,1998:388~398
[12]Q.M.Gong,J.Zhao,Y.S.Jiang.In situ TBM penetration tests and rock mass boreability analysis in hard rock tunnels[J].Tunnelling and underground space technology,2007,22(3):303~316
[13]Rostami J.Ozdemir L.A new model for performance prediction of hard rock TBMs[A],Chapter 50,RETC conference proceedings,1993,Boston MA,13~17
[14]Rostami,J,Ozdemir,L.,Nilsen,B.Comparison between CSM and NTH Hard Rock TBM Performance Prediction Models[A].Proceedings of Annual Technical Meeting of the Institute of Shaft Drilling Technology,Las Vegas,1996,1~10
[15]龚秋明,赵坚,张喜虎.岩石隧道掘进机的施工预测模型[J].岩石力学与工程学报,2004,23(增2):4709~4714GONG Qiuming,ZHAO Jian,ZHANG Xihu.Performance Prediction of Hard Rock TBM Tunneling[J].Chinese Journal of Rock Mechanics and Engineering.2004,23(supplement 2):4709~4714
[16]Michael Alber.Advance rates of hard rock TBMs and their effects on project economics[J].Tunnelling and underground spacetechnology,2000,15(1):55~64
[17]Christopher Laughtonn.Evaluation and prediction of TBM performance in variable rock mass[D],Austi:The university of Texas,1998:132~139,203~223
[18]Eskesen S.D.,Tengborg P.R,Kampmann J.,Veicherts T.H..Guidelines for tunneling risk management:International Tunneling Association,Working Group No.2[J].Tunneling and Underground Space technology,2004,(19):217~237
[19]Al-Bahar J.F..Systematic risk management approach for construction projects[J].Journal of Construction Engineering and Management,1990,116(3):533~546
[20]路美丽,刘维宁,罗富荣,等.隧道与地下工程风险评估方法研究进展[J].工程地质学报,2006,14(04):462~469LU Meili,LIU Weining,LUO Furong,et al.Review on risk assessment methods for tunneling and underground projects[J].Journalof Engineering Geology,2006,14(04),462~469
[21]黄宏伟,陈桂香.风险管理在降低地铁造价中的作用[J].现代隧道技术,2003,40(5):1~6Huang Hongwei,Chen Guixiang.Role of risk management in the cost of metro construction.Modern Tunneling Technology,2003,40(5):1~6
[22]胡群芳.基于地层变异的盾构隧道工程风险分析及其应用研究[D].上海:同济大学博士学位论文.2006-09HU Qunfang.Risk analysis and its application for tunnel works based on research of stratum and soil spatial variability[D].Shanghai:Thesis of Doctor Degree,Tongji university,2006-09
[23]陈龙.软土地区盾构隧道施工期风险分析与评估研究[D].上海:同济大学博士学位论文.2004-03Chen Long.Risk analysis and evaluative research during construction of soft soil shield tunnel in urban area[D].Shanghai:Thesisof Doctor Degree,Tongji university,2004-03
[24]尚彦军,杨志法,曾庆利,等.TBM施工遇险工程地质问题分析和失误的反思[J].岩石力学与工程学报,2007,26(12):2404~2411SHANG Yanjun,YANG Zhifa,ZENG Qingli,et al.Retrospective analysis of TBM accidents from its poor flexibility tocomplicated geological conditions[J].Chinese Journal of Rock Mechanics and Engineering.2007,26(12):2404~2411
[25]Einstein H.H.,Xu S.,Grasso P.,Mahtab M.A..Decision Aids in tunneling[J].World tunneling,1998,(4):157~159