隧道两种减震措施的数值模拟研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
目前隧道的减震措施主要有两种,即设置减震层和抗震缝。本文以黄草坪隧道为研究对象,应用有限差分程序FLAC3D对其进行地震响应的数值模拟研究,分别从围岩和衬砌的应力、加速度及位移方面探讨了这两种减震措施的效果,同时对比不同抗震缝间距时围岩和初期衬砌的纵向应力。研究结果表明,减震层和抗震缝的减震作用比较明显,应根据工程抗震的要求选择不同的减震措施。
At present,there are two shock absorption measures of tunnel,namely shock absorption layer and aseismatic joint.Based on Huangcaoping tunnel,this paper simulates the shock absorption measures of this tunnel by using FLAC~(3D),and discusses on the effects of the two shock absorption measures from the aspects of the stress,acceleration and displacement of surrounding rock and liner,at the same time,this paper compared the longitudinal stress of surrounding rock and early lining with different distance of aseismatic joint.The results indicate that the effects of shock absorption layer and aseismatic joint are both obvious,and we need choose different measures of shock absorption according to the aseismatic request of project.
引文
[1]王明年,关宝树.地下结构是减震结构[J].工程力学,1999(增刊):802-807.
    [2]关宝树.隧道工程设计要点集[M].北京:人民交通出版社,2003.
    [3]王明年.高地震区地下结构减震技术原理的研究[D].成都:西南交通大学硕士学位论文,1999.
    [4]刘波.FLAC原理、实例与应用指南[M].北京:人民交通出版社,2005.
    [5]Itasca Consulting Group Inc.FLAC3D(Fast LagrangeAnalysis of Continua in 3 Dimensions)Users Manual[M].USA:Itasca Consulting Group Inc,2005.
    [6]春玲,祁生文.利用FLAC3D分析某边坡地震稳定性[J].岩石力学与工程学报,2004,23(16):2730-2733.
    [7]G318线海子山至竹巴笼段公路黄草坪新线隧道、桥梁工程场地地震安全性评价报告[R].成都:四川省地震局工程地震研究所,2002.
    [8]李建波.结构-地基动力相互作用的时域数值分析方法研究[D].大连:大连理工大学博士学位论文,2005.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心