引文
[1]王涛.高速公路桥梁交通荷载调查分析及仿真模拟[D].西安:长安大学,2010.WANG Tao.Investigation Statistics and Simulationfor Random Traffic Loading of Expressway Bridge[D].Xi an:Chang an University,2010.
[2]周江评.美国国家公众交通规划基础数据调查及其数据库[J].城市交通,2004,2(4):23-28.ZHOU Jiang-ping.Survey and Datasets of NationwidePublic Transportation Planning Basic Data in U.S.[J].Urban Transport of China,2004,2(4):23-28.
[3]The Maine Department of Transportation.TrafficVolume Counts 2005 Annual Report[R].Augusta:the Maine Department of Transportation,2006.
[4]刘军民.日本的交通调查[J].交通与运输,2000(2):32-34.LIU Jun-min.Traffic Survey of Japan[J].Traffic&Transportation,2000(2):32-34.
[5]中华人民共和国交通部.中德交调技术交流及交调工作座谈会[R].北京:中华人民共和国交通部,2002.Ministry of Communications of the People s Republicof China.Technology Exchange and Work Forum onTraffic Investigation Between China and German[R].Beijing:Ministry of Communications of the People sRepublic of China,2002.
[6]王建军,严宝杰.交通调查与分析[M].北京:人民交通出版社,2004.WANG Jian-jun,YAN Bao-jie.Traffic Survey andAnalysis[M].Beijing:China Communications Press,2004.
[7]BS 5400-10:1980,Steel,Concrete and CompositeBridges.Code of Practice for Fatigue[S].
[8]童乐为,沈祖炎,陈忠延.城市道路桥梁的疲劳荷载谱[J].土木工程学报,1997,30(5):20-27.TONG Le-wei,SHEN Zu-yan,CHEN Zhong-yan.Fa-tigue Load Spectrum for Urban Road Bridges[J].China Civil Engineering Journal,1997,30(5):20-27.
[9]NOWAK A S.Live Load Model for Highway Bridges[J].Structural Safety,1993,13(1/2):53-66.
[10]NOWAK A S,NASSIF H,DEFRAIN L.Effect ofTruck Loads on Bridges[J].Journal of TransportationEngineering,1993,119(6):853-867.
[11]NOWAK A S,FERRAND D M.Truck Load Modelsfor Bridges[C]//BLANDFORD G E.Structures2004—Building on the Past:Securing the Future.Nashville:ASCE,2004:1-10.
[12]CREMONA C.Optimal Extrapolation of Traffic LoadEffects[J].Structural Safety,2001,23(1):31-46.
[13]MIAO T J.Bridge Live Load Models with SpecialReference to Hong Kong[D].Hong Kong:The HongKong Polytechnic University,2001.
[14]GINDY M.Development of a Reliability Based Deflec-tion Limit State for Steel Girder Bridges[D].NewBrunswick:The State University of New Jersey,2004.
[15]O CONNOR A,O BRIEN E J.Traffic Load Model-ling and Factors Influencing the Accuracy of PredictedExtremes[J].Canadian Journal of Civil Engineering,2005,32(1):270-278.
[16]李扬海,鲍卫刚,郭修武,等.公路桥梁结构可靠度与概率极限状态设计[M].北京:人民交通出版社,1997.LI Yang-hai,BAO Wei-gang,GUO Xiu-wu,et al.Structural Reliability for Highway Bridges and Prob-ability-based Limit State Design[M].Beijing:ChinaCommunications Press,1997.
[17]O CONNOR C,CHAN T H T.Dynamic Wheel Loadsfrom Bridge Strains[J].Journal of Structural Engin-eering,1988,114(8):1703-1723.
[18]CHAN T H T,LAW S S,YUNG T H.An Interpre-tive Method for Moving Force Identification[J].Jour-nal of Sound and Vibration,1999,219(3):503-524.
[19]LAW S S,CHAN T H T.Moving Force Identifica-tion:a Time Domain Method[J].Journal of Sound andVibration,1997,201(1):1-22.
[20]LAW S S,CHAN T H T,ZENG Q H.Moving ForceIdentification:a Frequency and Time Domains Analy-sis[J].Journal of Dynamic Systems,Measurementand Control,1999,12(3):394-401.
[21]LIN Y H,TRETHEWEY M W.Finite ElementAnalysis of Elastic Beams Subjected to Moving Dy-namic Loads[J].Journal of Sound and Vibration,1990,136(2):323-342.
[22]袁向荣,卜建清,满红高,等.移动荷载识别的函数逼近法[J].振动与冲击,2000,19(1):58-60,70.YUAN Xiang-rong,BU Jian-qing,MAN Hong-gao,et al.Function Approaching Method in Moving LoadIdentification[J].Journal of Vibration and Shock,2000,19(1):58-60,70.
[23]FU G K,HAG-ELSAFI O.Vehicular Overloads:LoadModel,Bridge Safety,and Permit Checking[J].Jour-nal of Bridge Engineering,2000,5(1):49-57.
[24]梅刚,秦权,林道锦.公路桥梁车辆荷载的双峰分布概率模型[J].清华大学学报:自然科学版,2003,43(10):1394-1396,1404.MEI Gang,QIN Quan,LIN Dao-jin.Bi-modal Prob-abilistic Model of Highway and Bridge Vehicle Loads[J].Journal of Tsinghua University:Science andTechnology,2003,43(10):1394-1396,1404.
[25]郭彤,李爱群,赵大亮.用于公路桥梁可靠性评估的车辆荷载多峰分布概率模型[J].东南大学学报:自然科学版,2008,38(5):763-766.GUO Tong,LI Ai-qun,ZHAO Da-liang.Multiple-peaked Probabilistic Vehicle Load Model for HighwayBridge Reliability Assessment[J].Journal of South-east University:Natural Science Edition,2008,38(5):763-766.
[26]铁摩辛柯S.工程中的振动问题[M].胡人礼,译.北京:人民铁道出版社,1978.TIMOSHENKO S.Vibration Problems in Engineer-ing[M].Translated by HU Ren-li.Beijing:ChinaRailway Publishing House,1978.
[27]何度心.列车动载[J].地震工程与工程振动,1988,8(4):78-98.HE Du-xin.Dynamic Loading of Driving Train onBridges[J].Journal of Earthquake Engineering andEngineering Vibration,1988,8(4):78-98.
[28]WAARTS P H,VROUWENVELDER A A.Descrip-tion of Vehicular Load on Bridge[R].New York:TNO,1991.
[29]周小?.三塔悬索桥中塔鞍座主缆抗滑安全概率评价[D].上海:同济大学,2008.ZHOU Xiao-yi.Probability Assessment for Slip Re-sistance of Main Cables on Middle Tower Saddles fora Three-tower Suspension Bridge[D].Shanghai:Tongji University,2008.
[30]韩万水,陈艾荣.随机车流下的风-汽车-桥梁系统空间耦合振动研究[J].土木工程学报,2008,41(9):97-102.HAN Wan-shui,CHEN Ai-rong.Three-dimensionalCoupling Vibration of Wind-vehicle-bridge SystemsUnder Random Traffic Flow[J].China Civil Engin-eering Journal,2008,41(9):97-102.
[31]罗霞,杜进有,陈应文.混合车流交通流特性分析[J].西南交通大学学报,2000,35(3):297-300.LUO Xia,DU Jin-you,CHEN Ying-wen.Analyses onMulti-traffic Flow s Characteristics[J].Journal ofSouthwest Jiaotong University,2000,35(3):297-300.
[32]罗霞,杜进有,霍娅敏.车头间距分布规律的研究[J].西南交通大学学报,2001,36(2):113-116.LUO Xia,DU Jin-you,HUO Ya-min.Study on theDistribution Patterns of Time Headway of Vehicles[J].Journal of Southwest Jiaotong University,2001,36(2):113-116.
[33]方健红,方旭华.用VB实现车流运行系统的仿真[J].浙江交通职业技术学院学报,2004,5(1):20-23.FANG Jian-hong,FANG Xu-hua.The Simulation ofVehicles Circulation System by Visual Basic[J].Jour-nal of Zhejiang Vocational and Technical Institute ofTransportation,2004,5(1):20-23.
[34]王硕.桥梁运营荷载状况研究[D].上海:同济大学,2007.WANG Shuo.Study on Load Condition for In-serviceBridges[D].Shanghai:Tongji University,2007.
[35]冯兆祥,张磊,吴冲.泰州长江大桥钢塔疲劳计算随机车辆荷载模拟[J].公路交通科技,2008,25(12):127-131.FENG Zhao-xiang,ZHANG Lei,WU Chong.Simula-tion of Random Vehicle Load for Fatigue Calculationof Steel Pylon of Taizhou Yangtze River Bridge[J].Journal of Highway and Transportation Research andDevelopment,2008,25(12):127-131.
[36]黄仰贤.路面分析与设计[M].余定选,齐诚,译.北京:人民交通出版社,1998.HUANG Yang-xian.Pavement Analysis and Design[M].Translated by YU Ding-xuan,QI Cheng.Bei-jing:China Communications Press,1998.
[37]邓学钧,黄晓明.路面设计原理与方法[M].北京:人民交通出版社,2001.DENG Xue-jun,HUANG Xiao-ming.Principles andMethods of Pavement Design[M].Beijing:ChinaCommunications Press,2001.
[38]GETACHEW A.Traffic Load Effects on Bridges:Statistical Analysis of Collected and Monte CarloSimulated Vehicle Data[D].Stockholm:StockholmUniversity,2003.
[39]黄立葵,贾璐,万剑平,等.高速公路车辆横向分布特征[J].中南公路工程,2005,30(1):73-76.HUANG Li-kui,JIA Lu,WAN Jian-ping,et al.Tra-verse Distribution Characteristics of Vehicles on Free-ways[J].Central South Highway Engineering,2005,30(1):73-76.
[40]周志坚,徐行军.不同功能城市道路的车辆横向分布特征[J].交通标准化,2008(8):150-153.ZHOU Zhi-jian,XU Xing-jun.Transverse Distribu-tion Characteristics of Vehicles in Different FunctionUrban Road[J].Communications Standardization,2008(8):150-153.
[41]王春生.铆接钢桥剩余寿命与使用安全评估[D].上海:同济大学,2003.WANG Chun-sheng.Assessment of Remaining Fa-tigue Life and Service Safety for Riveted Steel Bridges[D].Shanghai:Tongji University,2003.
[42]刘华,叶见曙,俞博,等.桥梁荷载横向分布系数计算方法[J].交通运输工程学报,2009,9(1):62-66.LIU Hua,YE Jian-shu,YU Bo,et al.CalculationMethod of Transversal Distribution Factor for BridgeLoad[J].Journal of Traffic and Transportation Engin-eering,2009,9(1):62-66.
[43]王达,刘扬,黄平明.随机车流作用下双曲拱桥车-桥耦合振动研究[J].中国公路学报,2009,22(6):67-73.WANG Da,LIU Yang,HUANG Ping-ming.Researchon Vehicle-bridge Coupled Vibration for Two-wayCurved Arch Bridge Under Random Traffic Flow[J].China Journal of Highway and Transport,2009,22(6):67-73.
[44]袁明,余钱华,颜东煌.基于车-桥系统耦合振动理论的大跨PC连续刚构桥冲击系数研究[J].中国公路学报,2008,21(1):72-76,120.YUAN Ming,YU Qian-hua,YAN Dong-huang.Re-search on Impact Coefficient for PC Continuous RigidFrame Bridges with Long-span Under Theory of Ve-hicle-bridge System Coupling Vibration[J].ChinaJournal of Highway and Transport,2008,21(1):72-76,120.
[45]任伟平,李小珍,李俊,等.公轨两用钢桁桥轨道横梁与整体节点连接头的疲劳荷载[J].中国公路学报,2007,20(1):79-84.REN Wei-ping,LI Xiao-zhen,LI Jun,et al.FatigueLoad of Welded Connections Between Rail AcrossBeams and Integral Joints of Combined Steel TrussBridges[J].China Journal of Highway and Trans-port,2007,20(1):79-84.