城市环境下TBM施工对周边环境影响的监测与分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
重庆市轨道交通六号线一期五里店站—山羊沟水库区间隧道为开敞式TBM掘进,为了掌握重庆典型地质条件下TBM掘进对周边环境的影响,为重庆地铁以及其他类似工程提供借鉴,以该工程TBM掘进前300 m(里程K17+300~+600)隧道为依托对象,对TBM掘进区间隧道附近的房屋结构、桥台、围岩以及地表等进行了地表沉降和微振动的监测和对比分析。对TBM掘进的不同工况、不同地质条件的围岩及其支护进行了围岩变形、支护结构受力变形等的监测和对比分析,通过监测分析得出部分结论。
Wulidian station-Shanyanggou Reservoir station tunnel section on the first phase of Line 6 of Chongqing rail transit.Settlement and slight vibration monitoring and analysis are made on the neighboring buildings,the abutments,the surrounding rock massed and the ground,with the construction of the tunnel section,300 m before TBM tunnelling,as an example,so as to recognize the influence of TBM tunnelling on surrounding environment in typical geological conditions in Chongqing.Monitoring and analysis are made on deformation of surrounding rock mass and support with different construction situations and different geological conditions of TBM tunnelling.
引文
[1]邓俊稳.微震控制爆破技术在城市地铁施工中的应用[J].天津建设科技,2001,11(3):1-3.(DENG Junwen.Application of microseismic control blasting technique on theconstruction of urban metro[J].Tianjing ConstractionScience and Technology,2001,11(3):1-3.(in Chinese))
    [2]朱赞成,毕远志.广州地铁暗挖隧道微振爆破技术[J].铁道建筑,2009(4):55-57.(ZHU Zancheng,BIYuanzhi.Guangzhou subway underground tunnel ambientvibration blasting technology[J].Railway Engineering,2009(4):55-57.(in Chinese))
    [3]杨小林,侯爱军.地铁隧道爆破施工的地震效应和安全标准[J].洛阳理工学院学报:自然科学版,2008,18(1):1-4.(YANG Xiaolin,HOU Aijun.Blasting seismiceffects and safe criterion in metro tunnel excavation[J].Journal of Luoyang Institute of Science and Technology,2008,18(1):1-4.(in Chinese))
    [4]魏权,郑召怡.微震爆破技术在重庆地铁一号线中的应用[J].黑龙江交通科技,2009,32(6):191,193.(WEIQuan,ZHENG Zhaoyi.Seismic blasting technology inChongqing subway No.1.in the application[J].Communications Science and Technology Heilongjiang,2009,32(6):191,193.(in Chinese))
    [5]闻毓民,高新强.盾构施工技术在城市轨道交通系统中的发展[J].四川建筑,2005,25(4):111-112.(WENYumin,GAO Xinqiang.Shield construction technology in thedevelopment of urban rail transit systems[J].SichuanArchitecture,2005,25(4):111-112.(in Chinese))
    [6]傅德明,周文波.土压盾构技术在我国地铁隧道工程中的应用和发展[J].岩石力学与工程学报,2004,23(Z2):4888-4892.(FU Deming,ZHOU Wenbo.Application and development of EPB shield tunneling inmetro tunnel projects in China[J].Chinese Journal of RockMechanics and Engineering.2004,23(Z2):4888-4892.(in Chinese))
    [7]雷显勇,戴志仁,王常安.上海地铁7号线盾构超越施工技术[J].施工技术.2009,38(9):1-4.(LEI Xianyong,DAI Zhiren,WANG Chang,an.Transcending technology ofshield tunnel in Shanghai metro line 7[J].ConstructionTechnology,2009,38(9):1-4.(in Chinese))
    [8]桂林.广州地铁五号线岩溶地区盾构隧道工程技术研究[J].桂林工学院学报,2008,28(3):324-329.(GUILin.Engineering technique for shield tunnel in karst regionof Guangzhou metro line 5[J].Journal of Guilin Universityof Technology,2008,28(3):324-329.(in Chinese))
    [9]叶康慨.沈阳地铁过河隧道盾构施工技术[J].隧道建设,2007,27(6):39-42.(YE Kangkai.Shieldconstruction technology for river crossing tunnel of Shenyangmetro[J].Tunnel Construction,2007,27(6):39-42.(inChinese))
    [10]刘孟山.TB880E型掘进机应用研究[J].铁路工程造价管理,2007,22(3):4-7.(LIU Mengshan.Study of utilizationof remaining service life of TB800E tunnel boring machine[J].Railway Engineering Cost Management,2007,22(3):4-7.(in Chinese))
    [11]吴世勇,王鸽,徐劲松,等.锦屏二级水电站TBM选型及施工关键技术研究[J].岩石力学与工程学报,2008,27(10):2000-2009.(WU Shiyong,WNAG Ge,XU Jinsong,et al.Research on TBM type-selection and key constructiontechnology for JinpingⅡhydropower station[J].ChineseJournal of Rock Mechanics and Tngineering,2008,27(10):2000-2009.(in Chinese))
    [12]王梦恕.开敞式TBM在铁路长隧道特硬岩、软岩地层的施工技术[J].土木工程学报,2005,38(5):54-58.(WANG Mengshu.Construction technique of open TBM forlong railway tunnels in very hard or soft rock strata[J].China Civil Engineering Journal,2005,38(5):54-58.(inChinese))
    [13]刘怀国,张劲,章跃林.引黄工程南干线TBM施工探讨[J].岩石力学与工程学报,2003,22(Z1):2520-2522.(LIU Huaiguo,ZHANGJin,ZHANG Yaolin.Research onTBM construction techniques for south main of YRDP[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(Z1):2520-2522.(in Chinese))
    [14]李明雄,李鴻洲,李慶龍,等.台湾水利隧道工程TBM开挖首次貫通案例[J].岩石力学与工程学报,2004,23(Z2):4795-4801.(LEE Minghsiung,LEE Hungjoe,LeeChinglung,et al.First successful breaking-through ofhydraulic tunnel by TBM in Taiwan[J].Chinese Journal ofRock Mechanics and Engineering,2004,23(Z2):4795-4801.(in Chinese))
    [15]韩冰,柴永模.客运专线铁路特长隧道TBM施工方案研究[J].铁道标准设计,2007(6):97-102.(HAN Bin,CHAI Yongmu.Study on TBM construction plan for extra-long railway tunnel in passenger dedicate lines[J].RailwayStandard Design,2007(6):97-102.(in Chinese))
    [16]许占良.开敞式TBM在管涔山隧道施工的适应性研究[J].铁道工程学报,2007,24(8):53-57.(XUZhanliang.Research on the adaptability of open-type TBM inthe construction of Guancen Mountain tunnel[J].Journal ofRailway Engineering Society,2007,24(8):53-57.(inChinese))
    [17]刘春.西安—安康铁路秦岭隧道TBM掘进施工技术总结[M].北京:中国铁道出版社,2010.(LIU Chun.Technicreport for Qinling Moutain TBM tunneling construction onXi’an-Ankang railway[M].Beijing:China RailwayPublishing House,2010.(in Chinese))
    [18]王梦恕.岩石隧道掘进机(TBM)施工及工程实例[M].北京:中国铁道出版社,2004.(WANG Mengshu.Rocktunnel boring(TBM)construction and engineering example[M].Beijing:China Railway Rublishing House,2004.(inChinese))