摘要
以宝天高速公路天水过境段梁家山泥岩隧道为工程背景,通过现场测试,研究了围岩拱顶下沉、围岩与初期支护接触压力、钢拱架应力和初衬与二衬接触压力随时间变化规律及分布特征,并应用现有的理论和方法对实际工程安全状态进行评估。研究结果表明:以隧道开挖空间效应和Chern经验公式两种理论方法对拱顶沉降数据进行分析处理,所得到的隧道极限位移相差较小;围岩与初期支护压力的分布具有不均匀性特点;钢拱架外缘应力平均值大于内缘,拱顶处应力大于其他部位,按其推算得到的拱顶沉降极限位移更接近于实际情况;初衬与二衬间接触压力先迅速增加后逐渐较小最后趋于稳定,其稳定值整体偏小。
Taking Liangjiashan Tunnel seated in mudstone of the Tianshui section of the highway from Baoji to Tianshui as an example,a comprehensive in-situ monitoring measurement was carried out for crown settlement,ground pressure between surrounding rock and primary support,stress in steel centering and contact pressure between primary support and secondary lining.The development and distribution characteristics of deformation and pressures of ground and structures were discussed based on measured data.The tunnel construction safety was then evaluated by using the analytical solutions.The results indicated that the ultimate crown settlement displacements calculated according to the methods proposed by Guan(1993)and Chern et al(2000)did not differ too much.The ground pressure and contact pressure were not uniformly distributed.The stresses on the exterior margin of steel centering were much larger than those on the inner margin with the peak values developed on the crown.Another calculation of ultimate displacement of tunnel crown settlement based on maximum stress on the inner margin of steel centering seemed to give a better assessment much closer to in-situ conditions.The contact pressures were increased quickly after lining concrete was poured and molded,but gradually decreased with time until they reached certain stable values which were slightly low.
引文
[1]程裕淇.中国区域地质概论[M].北京:地质出版社,1994.(Cheng Yuqi.Introduction to regional geolo-gy in China[M].Beijing:Geological PublishingHouse,1994.(in Chinese))
    [2]张立德,周小兵,赵长海.软岩隧洞设计与施工技术[M].北京:中国水利水电出版社,2006.(ZhangLide,Zhou Xiaobing,Zhang Changhai.Techniques oftunnel design and construction in soft rocks[M].Bei-jing:China Water Conservancy and Hydropower Pub-lishing House,2006.(in Chinese))
    [3]韩瑞庚.地下工程新奥法[M].北京:科学出版社,1987.(Han Ruigeng.New austria tunnelling method inunderground engineering[M].Beijing:Science Pub-lishing House,1987.(in Chinese))
    [4]N.Yoshida,M.Nishil,M.Kitamural,et al.Analysisof mudstone deterioration and its effect on tunnel per-formance[J].International Journal of Rock Mechanicsand Mining Sciences,1997,34,(3-4):353.e1-353.e19.
    [5]T.T.Wang,T.H.Huang.An experience of tunnellingin mudstone area in southwestern Taiwan[J].Tunnel-ling and Underground Space Technology,2002,17(4):425-436.
    [6]李晓红.隧道新奥法及其量测技术[M].北京:科学出版社,2002.(Li Xiaohong.New austria tunnellingmethod and monitor techniques[M].Beijing:SciencePublishing House,2002.(in Chinese))
    [7]Fulvio Tonon.Sequential excavation,NATM and ADE-CO:What they have in common and how they differ[J].Tunnelling and Underground Space Technology,2010,25(3):245-265.
    [8]杜菊红,黄宏伟,雷新文.平年小间距隧道监控量测分析[J].地下空间与工程学报,2007,3(增2):1 417-1 420.(Du Juhong,Huang Hongwei,Lei Xin-wen.Monitoring and measurement analysis of Piannianclosely-spaced tunnel[J].Chinese Journal of Under-ground Space and Engineering,2007,3(Supp.2):1 417-1 420.(in Chinese))
    [9]闫宇蕾,刘保国.连拱隧道施工监控量测技术研究[J].地下空间与工程学报,2007,3(增1):1382-1 386.(Yan Yulei,Liu Baoguo.Research on technolo-gy of monitoring and measurement in double-arch tunnelconstruction[J].Chinese Journal of UndergroundSpace and Engineering,2007,3(Supp.1):1 382-1 386.(in Chinese))
    [10]曲海峰,朱合华,黄成造,等.隧道初期支护的钢拱架与钢格栅选择研究[J].地下空间与工程学报,2007,3(2):258-262.(Qu Haifeng,Zhu Hehua,Huang Chengzao,et al.Study on selection of section-steel and grid-steel in primary support system of tunnel[J].Chinese Journal of Underground Space and Engi-neering,2007,3(2):258-262.(in Chinese))
    [11]李鹏飞,张顶立,赵勇,等.大断面黄土二次砌衬受力特性研究[J].岩石力学与工程学报,2010,29(8):1 690-1 696.(Li Pengfei,Zhang Dingli,ZhaoYong,et al.Study of mechanical characteristics ofsecondary lining of large-section loess tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(8):1 690-1 696.(in Chinese))
    [12]李煜舲,许文贵,林铭益.以隧道变形量测资料分析掘进效应与约束损失[J].岩石力学与工程学报,2009,28(1):39-46.(Li Yulin,Xu Wengui,Lin Mingyi.Analysis of advancing effect and confine-ment loss by using deformation measurements in tunnel[J].Chinese Journal of Rock Mechanics and Engi-neering,2009,28(1):39-46.(in Chinese))
    [13]李晓红,李登新,靳晓光,等.初期支护对软岩隧道围岩稳定性和位移影响分析[J].岩土力学,2005,26(8):1 207-1 210.(Li Xiaohong,Li Dengx-in,Jin Xiaoguang,et al.Discussion on influence ofinitial support to stability and deformation of surround-ing rock mass in soft rock tunnel[J].Rock and SoilMechanics,2005,26(8):1 207-1 210.(in Chi-nese))
    [14]关宝树.隧道力学概论[M].成都:西南交通大学出版社,1993.(Guan Baoshu.Introduction to tunnelmechanics[M].Chengdu:Southwest Jiaotong Univer-sity Press,1993.(in Chinese))
    [15]Carranza Torres C,Fairhurst C.Application of theconvergence-confinement method of tunnel design torock masses that satisfy the Hoek-Brown failure criteri-on[J].Tunnelling and Underground Space Tech-nique,2000,15(2):187-213.
    [16]李世辉.隧道支护设计新论[M].北京:科学出版社,1999.(Li Shihui.New concept on tunnel support[M].Beijing:Science Publishing House,1999.(inChinese))
    [17]中华人民共和国行业标准.公路隧道设计规范(JTG D70-2004)[S].北京:人民交通出版,2004.(The Industrial Standard of People’s Republic of Chi-na.Code for design of road tunnel(TB10003-2005/J449-2005)[S].Beijing:People’s TransportationPublishing House,2004.(in Chinese))
    [18]Oreste,P.P.Analysis of structural interaction in tun-nels using the convergence confinement approach[J].Tunnelling and Underground Space Technology,2003,18(4):347-363.
    [19]本书编委会.钢结构工程必备数据一本全[M].北京:地震出版社,2007.(Manual of reference data forsteel structures[M].Beijing:Seismological PublishingHouse,2007.(in Chinese))
    [20]朱永全,刘勇,张素敏.洞室大小和形状对极限位移的影响[J].岩石力学与工程学报,1998,17(5):527-533.(Zhu Yongquan,Liu Yong,Zhang Sumin.The influence of tunnelling size and shape on limit dis-placement[J].Chinese Journal of Rock Mechanicsand Engineering,1998,17(5):527-533.(in Chi-nese))